Site ID: 878

Showing comments and forms 1 to 5 of 5

Support

Site Assessment Pro Formas

Representation ID: 3735

Received: 21/08/2021

Respondent: Elizabeth Corkery

Representation Summary:

Wildlife - fewer protected species compared to Denybrooke

Agricultural land - poorer quality than Denybrooke

Transport - closer to bedford town centre, promotes growth and fewer car journeys

Amenities - closer to amenities already in place

Size - smaller site so less impact to local pollution compared to large scale Denybrooke

Timing - quicker to complete phases and overall project compared to Denybrooke

Object

Site Assessment Pro Formas

Representation ID: 4111

Received: 30/08/2021

Respondent: Mr Paul Irish

Representation Summary:

This site is completely disproportionate to the overall village (currently 1000 properties total) it is effectively a new town.

The neighbourhood plan prepared by the village and consulted on locally has sufficient scale, to accommodate growth meaning this capacity is not required.

It would destroy prime agricultural land and dramatically change the nature of the village. It is also close to local historic sites.

Do not assume residents want increased facilities brought about by growth or coalescence - a village community exists because of the size of the village. Increasing this by 50% would significantly change its nature

Support

Site Assessment Pro Formas

Representation ID: 5422

Received: 03/09/2021

Respondent: GB PC

Representation Summary:

Only part of this land is required to support development of 500 houses allocated to Great Barford in the LP2030 that will continue in to LP2040. Land adjacent to site 767 would be appropriate to expand the village with minimal adverse effects from additional traffic flow through the village, minimal flood risk, visual intrusion could be reduced by the gently rolling slopes to hide rooflines. Opportunity to have several well separated access points along Bedford Rd, and provide a "gateway" into the village.

Object

Site Assessment Pro Formas

Representation ID: 6075

Received: 09/09/2021

Respondent: Countryside Properties

Agent: Phillips Planning Services

Representation Summary:

2.1. The site - Land West Of The Village Of Great Barford South Of The A421 is being promoted as part of the Call For Sites process (Site 878). [Site location plan inserted here.]
2.2. The site is located to the west of Bedford Road on the edge of Great Barford. Great Barford is a Key Service Centre benefiting from a range of services and facilities.

2.3. The land we are promoting in this submission is in addition to land under option that we are already promoting in the emerging Neighbourhood Plan. As can be seen in the above plan, this site adjoins the draft allocation for 500 dwellings in the emerging Great Barford Neighbourhood Plan, which is currently being examined by an independent examiner following the Regulation 16 stage consultation. It is projected that the plan will be at referendum around October 2021.

2.4. It is not clear yet whether the whole of the (draft) allocated site will be required to meet the policy requirements of the Neighbourhood Plan, but if it is not all required, then any remaining land would be available for future growth at Great Barford/can integrate with any development with the current allocation.

2.5. The land could deliver an additional 500 dwellings or more, in addition to the new homes and community facilities being brought forward through the Neighbourhood Plan.

2.6. The site is within the Oxford to Cambridge Arc and has excellent links to the A421. Access to any development will be provided off Bedford Road which will allow traffic to access the A421 without the need to travel through the village.
3.19. Countryside Properties (UK) Limited controls land along Bedford Road, known as Land West Of The Village Of Great Barford South Of The A421, which is being promoted through the Call For Sites process (Site 878). This land is in the control of a single promoter and can easily deliver further growth.

3.20. The site we are promoting adjoins the land allocated for 500 dwellings in the Draft Neighbourhood Plan under Policy H1 – Great Barford West. However, there is a probability that not all of this allocated land is required to meet the objectives of Policy H1. The remaining land within the allocation as well as the adjoining land to the west and north, and heading out to the A421, is also available for development and could provide further strategic growth in this location, ensuring there is a continued supply of new homes into the new local plan period. This is a highly deliverable site and would be seen as a logical extension to the village following the Neighbourhood Plan development, and could deliver an additional 500 dwellings or more, furthering the objectives of the Neighbourhood Plan to deliver new community facilities for the village.

3.21. As previously identified, the site is within a highly accessible location on the A421 growth corridor and is therefore in an ideal location for such development which will act as a draw into the Borough and increase the value of the local economy. Matters such as highway mitigation can be resolved through engagement with key stakeholders and Countryside is responsible for the delivery of significant elements of infrastructure within their strategic sites.

3.22. Land at Great Barford West will be served by new infrastructure including, utilities, roads, footpaths, cycleways, open space, education, and health and community facilities. There is an opportunity for further growth in the wider site which builds upon this infrastructure, contributing towards delivery.

3.23. Another benefit of this site is it that it can connect to the A421 to the west, without the need for traffic to go through the existing village. This means that new housing and employment can be delivered and accessed without resulting in an adverse impact on the existing village road network, and would be particularly beneficial during the construction phase.

3.24. The development of Land West Of The Village Of Great Barford South Of The A421 would support the delivery of growth within the A421 corridor, be close to the route of East-West Rail, and would clearly comply with the ambitions of delivering development which corresponds to strategic connections within the Oxford-Cambridge Arc.

Support

Site Assessment Pro Formas

Representation ID: 7788

Received: 23/09/2021

Respondent: Mr A Sarro

Agent: Phillips Planning Services

Representation Summary:

3.17. Our client Mr Sarro owns Land To The East Of Hookhams Lane, Salph End, Renhold, which is being promoted through the Call For Sites process (Site 878). This land is in the control of a single owner, is accessible, and can easily deliver further growth. This has been tested through a speculative application which was refused as being outside the settlement envelope.

3.18. The site is ideally located adjacent to the Settlement Policy Area of Renhold behind existing dwellings, and residential development on the site can easily assimilate into the village. Renhold is a sustainable location adjoining the urban area and the site is within walking distance of a range of services and facilities, including a convenience store, public house, primary school, secondary school, three supermarkets, and a pharmacy, as well as a high frequency bus service to Bedford.

3.19. Numerous specialist surveys have been undertaken on the site and the reports were submitted as part of the Call For Sites Process. This includes a Landscape & Visual Impact Assessment, Heritage Statement, Flood Risk Assessment & Drainage Strategy, Preliminary Ecological Appraisal, Tree Survey Report, Sustainability And Energy Statement, and Transport Statement. These reports confirm that there are no significant constraints and the site can be delivered without any adverse impacts.

3.20. The site has good access onto the A421 and development in this location would support the delivery of growth within the A421 corridor, be close to the route of East-West Rail, and would clearly comply with the ambitions of delivering development which corresponds to strategic connections within the Oxford-Cambridge Arc.