The site at Dennybrook expanded in area by around 25% after the call for sites closed to
engulf the hamlets of Honeydon and Begwary. We were informed only 8 months after the
call for sites closed about this expansion which left only 4 weeks for residents to consider this
and seek advice before the consultation on the Draft Local Plan openened. Duloe Field (site
3420) was also submitted after the deadline. I do not believe sites submitted after the
deadline should be considered and certainly not very large sites submitted 8 months after
the deadline.
The site at Dennybrook expanded in area by around 25% after the call for sites closed to
engulf the hamlets of Honeydon and Begwary. We were informed only 8 months after the
call for sites closed about this expansion which left only 4 weeks for residents to consider this
and seek advice before the consultation on the Draft Local Plan openened. Duloe Field (site
3420) was also submitted after the deadline. I do not believe sites submitted after the
deadline should be considered and certainly not very large sites submitted 8 months after
the deadline.