Object

Local Plan 2040 Draft Plan - Strategy options and draft policies consultation

Representation ID: 5715

Received: 07/09/2021

Respondent: Miss Hannah Hambleton-Jewell

Representation Summary:

1.9 In response to this delay, some local authorities in the Arc have adjusted their local plan production timetables so that planning activity follows the development of the Arc Spatial Framework in order to create a more joined up process. Government however has urged Councils in the Arc to carry on with plan-making and, in Bedford Borough's case, the consequences of not doing so could be significant for the reasons relating to policies becoming "out of date" described above; so preparation of this local plan must continue. The relationship between the local plan timetable and the published timetable for the preparation of the Arc Spatial Framework is shown below.