BACKGROUND TO THE LOCAL PLAN REVIEW AND ITS RELATIONSHIP WITH NATIONAL POLICY AND OTHER MATERIAL CONSIDERATIONS
Summary of Local Plan 2030 and Requirement for Immediate Review
The Bedford Local 2030 was adopted subject to the provisions of Policy 1 – ‘Reviewing the Local Plan 2030’. The Inspectors’ Report provides further clarification of the requirement for Modifications introducing the approach to this Policy and that it was considered essential for soundness.
Paragraph 1.1 of the Council’s Preferred Options Consultation Document affirms the significance of the ‘guillotine’ mechanism inserted within the review policy, which engages paragraph 11(d) of the NPPF2021 in the event that a new Plan is not submitted for Examination before January 2023. While the Borough Council is aware it cannot avoid the consequences for the statutory development plan of failing to adhere to these timescales the Preferred Options published for consultation must also address the reasons for first introducing Policy 1. Drawing from the Inspectors’ Report:
• Paragraph 17 emphasises the importance of considering longer-term requirements and thus together with other issues with the Plan a need for the review to be undertaken as quickly as possible with the three-year timeframe providing balance to allow work to be completed effectively
• Paragraphs 33-34 anticipate that the review will consider the balance between jobs and workers including any changes in the balance of net out-commuting and the implications of the Oxford-Cambridge Arc
• Paragraph 40 confirms that the Local Plan 2030’s housing requirement was determined as 970 dwellings per annum as a result of transitional arrangements for the Examination of Plans under the 2012 version of the Framework.
• Paragraph 113 confirms an expectation of two reviews before 2030 to address potential issues of non-delivery, maintain a buffer in supply and to ensure that the allocation/supply of housing is sufficient to meet the identified need, which is, itself, likely to change over time (as calculated by the government’s standard method).
• Paragraph 123 recognises that the continued existence of a five-year supply of deliverable sites (within the provisions of the Local Plan 2030) is dependent on the progress with constrained capacity in the urban area and bringing forward allocations within Neighbourhood Plans quickly. The scope for early review is to allow for potential issues of non-delivery to be addressed and to consider the requirement for any additional housing site allocations in the light of evidence on housing need and realistic supply at that time.
Paragraph 18 of the Inspectors’ Report confirms that Policy 1 cannot set the parameters of the updated Local Plan. While there is a desire for alignment with the delivery of cross-boundary strategic priorities (including those related to the delivery of the Oxford-Cambridge Arc) the requirement for review is a result of the deficiencies with the approach put forward by the Council in the Local Plan 2030.
The appointed Inspectors determined (in the context of the 2012 Framework) it would not be effective for the policies of the Local Plan 2030 to look beyond that date. The findings of soundness are predicated on the context of a very narrow remit of addressing the area’s strategic priorities (and even then, only with the application of the three-year ‘guillotine’ following adoption).
It is not open to future Inspectors to reach the same conclusion. This emphasises the importance of the first paragraph of Policy 1 and the overriding objective of the aim of the review to secure levels of growth that accord with government policy. This establishes grounds for a Plan that must be fundamentally deliverable / developable over the plan period and cannot further defer relevant decisions relating to options to meet the area’s strategic priorities.
n not fully responding to the reasons and scope of requirements for the review and subsequent update of the Local Plan the Council risks rolling forward several of the same fundamental shortcomings in the Local Plan 2030. This is not only contrary to the objectives of sustainable development but in the context of the most recent policy and guidance simply fails to provide the basis for a sound Local Plan.
Object
Local Plan 2040 Draft Plan - Strategy options and draft policies consultation
1.5
Representation ID: 6334
Received: 10/09/2021
Respondent: Messrs A Porter, H Fowler, W Salsbury Ltd
Agent: DLP Planning Limited
The most recent version of the National Planning Policy Framework was published in July 2021, following commencement of the Council’s Preferred Options consultation. The changes were published in draft format in January 2021 (including those relevant to the plan-making framework) and thus available for the Council to consider.
These representations highlight four important components of the 2021 Framework and the changes they necessitate for the scope of the review, relative to the 2012 version of the Framework against which the current Local Plan 2030 was assessed. Other specific provisions of the Framework and NPPG are referred to in comments relating to detailed elements of the consultation proposal.
Firstly, Paragraph 22 of the NPPF2021 confirms that strategic policies should look ahead over a minimum 15-year period from adoption and anticipate long-term requirements. This is a significant change from paragraph 157 of the 2012 Framework that specified that policies should be drawn up over an appropriate timeframe and only preferably a 15-year horizon.
Secondly, the second paragraph of NPPF2021 Paragraph 22 is a significant addition following the most recent revisions. This requires that policies should address a vision that looks further ahead (at least 30 years) where larger scale developments such as new settlements or significant extensions to existing villages and towns form part of the strategy for the area. The transitional arrangements for these provisions at Annex 1 confirm their application to the preparation of all Plans except those that have already undergone consultation on the Submission version Plan. The Oxford-Cambridge Spatial Framework is also seeking to cover the period to 2050 (i.e., 30 years).
The Council’s Preferred Options clearly anticipate reliance on these approaches to growth and the associated implications in terms of extended timescales for development. None of the Council’s Preferred Options set out the proposed approach beyond a 20-year horizon. As a result, detailed policies for the scale and distribution of growth cannot be considered consistent with national policy without significantly extending their scope alongside provision for the other requirements of sustainable development.
hirdly, the requirements of Policy 1 of the Local Plan 2030 accord with the circumstances outlined at Paragraph 33 of the NPPF2021 where a significant change in circumstances is identified as a result of the calculation of local housing need. Paragraph 61 of the NPPF2021 outlines that minimum annual local housing need should be calculated using the government’s standard method. This is translated into the requirements against which plans must be assessed for soundness in terms of ensuring they are positively prepared and seek to meet needs in full (see NPPF2021 paragraph 35 and footnote 21) alongside the consideration of unmet needs from neighbouring areas. NPPF2021 paragraph 31 also emphasises the importance of considering relevant market signals.
The NPPG provides further clarification that the standard method does not attempt to predict the impact that future government policies, changing economic circumstances or other factors might have on demographic behaviour. Circumstances where it may be appropriate to plan for a higher housing need figure than the standard method indicates include any growth strategies for the area and strategic infrastructure improvements that are planned for (ID: 2a-010-20201216).
The Council accepts that there are no exceptional local circumstances that justify deviating from the standard method but the Preferred Options do not assess any alternative approach identifying a higher need than calculated by the standard method (that will typically be considered sound) (ID: ID: 2a-015-20190220). The assessment of market signals should include expected changes in the labour market, engagement with stakeholders for economic development and changes that may affect the anticipated population and local housing stock (ID: 2a-027-20190220).
Finally, Paragraph 35 of the NPPF2021 confirms that the criteria for the assessment of soundness have changed since the 2012 Framework. In order to provide for a justified approach the policies for the Plan must provide for ‘an appropriate strategy’ rather than the ‘most appropriate’ strategy when assessed against reasonable alternatives. Paragraph 32 of the NPPF2021 provides further detail on the basis for assessing the proposed strategy in terms of seeking net gains for sustainable development and ensuring that the Plan has addressed relevant economic, social and environmental objectives.
In summary, there is no longer any support in national policy for the outcomes of the Local Plan 2030 Examination in terms of pursuing constraints to the plan period and overall level of growth and deferring decisions on key components of approaches to meet strategic priorities for the area (particularly in terms of overall housing need (including affordable housing) and the delivery of social and community infrastructure (including health and education).
Support
Local Plan 2040 Draft Plan - Strategy options and draft policies consultation
1.8
Representation ID: 6337
Received: 10/09/2021
Respondent: Messrs A Porter, H Fowler, W Salsbury Ltd
Agent: DLP Planning Limited
Other Material Considerations (Notably Ox-Cam Arc Spatial Framework)
Emerging Oxford Cambridge Arc Spatial Framework
The proposed Oxford-Cambridge Spatial Framework will have the status of national policy and is intended to form a material consideration for plan-making alongside the National Planning Policy Framework.
The government is currently seeking view on priorities for the Framework as part of consultation on the document ‘Creating a Vision for the Oxford-Cambridge Arc’ (until October 2021). The latest consultation proposals set out that it will aim to guide sustainable planning and investment decisions under four policy pillars:
• the environment;
• the economy;
• connectivity and infrastructure; and
place-making.
The current consultation follows publication of an initial policy paper in February 2021 setting out the approach to developing the Framework. Paragraphs 2.10 and 2.11 of the policy paper set out in terms of the strategy for housing and planning in the Arc the role of the Framework will not be to make site allocations or to include detailed policies set elsewhere in national policy or better left to local plans (including for example, setting out the housing requirement). However, the policy paper emphasises the importance of meeting housing needs in full (including the delivery of affordable housing) and therefore relies on the calculation of minimum annual local housing need in accordance with the standard method as its starting point. Opportunities to increase levels of development above this minimum starting point are clearly anticipated as part of the Framework’s aspirations to support economic development and ensure a balance between the delivery of new jobs and homes (see paragraph 2.6).
Paragraph 3.8 of the policy paper sets out that the government expects:
local planning authorities to continue to develop local plans before the publication of the Spatial Framework. These changes will sit alongside wider planning reforms, and as we take forward our response to the ‘Planning for the Future’ consultation, we will outline transitional arrangements and the role of the Spatial Framework within any new system.”
he development of the Spatial Framework will be supported by two further public consultations: Towards a Spatial Framework (Spring 2022) and Draft Spatial Framework (Autumn 2022). It is the government’s intention to commence implementation of the Spatial Framework throughout 2023, meaning its policies are expected to be in place as a material consideration at the same point the Bedford Local Plan 2040 is undergoing Examination.