Bedford Borough Local Plan 2040 Plan for Submission
Search representations
Results for Avison Young search
New searchComment
Bedford Borough Local Plan 2040 Plan for Submission
Policy HOU16 Land at East Wixams
Representation ID: 10064
Received: 28/07/2022
Respondent: Avison Young
Proposed development sites crossed or in close proximity to National Grid assets:
Following a review of the above Development Plan Document, we have identified that one or more proposed development sites are crossed or in close proximity to National Grid assets. Details of the sites affecting National Grid assets are provided below.
Electricity Transmission
Policy HOU16 Land at East Wixams
Asset Description - 4VK ROUTE (TWR 378A - 476): 400Kv Overhead Transmission Line route: EATON SOCON - WYMONDLEY MAIN 1
Gas Transmission
Gas Transmission Pipeline, route: ST. NEOTS TO LITTLE BARFORD
To help ensure the continued safe operation of existing sites and equipment and to facilitate future infrastructure investment, National Grid wishes to be involved in the preparation, alteration and review of plans and strategies which may affect their assets. Please remember to consult National Grid on any Development Plan Document (DPD) or site-specific proposals that could affect National Grid’s assets. We would be grateful if you could check that our details as shown below are included on your consultation database:
Comment
Bedford Borough Local Plan 2040 Plan for Submission
Policy EMP6 Business Park, Land at Water End and St Neots Road
Representation ID: 10065
Received: 28/07/2022
Respondent: Avison Young
Following a review of the above Development Plan Document, we have identified that one or more proposed development sites are crossed or in close proximity to National Grid assets. Details of the sites affecting National Grid assets are provided below.
Electricity Transmission
Development Plan Document Site Reference
Policy EMP6 Business Park, Land at Water End and St Neots Road
Asset Description - Gas Transmission Pipeline, route: HUNTINGDON TO STEPPINGLEY
Gas Transmission Pipeline, route: PETERBOROUGH TO WHITWELL
To help ensure the continued safe operation of existing sites and equipment and to facilitate future infrastructure investment, National Grid wishes to be involved in the preparation, alteration and review of plans and strategies which may affect their assets. Please remember to consult National Grid on any Development Plan Document (DPD) or site-specific proposals that could affect National Grid’s assets. We would be grateful if you could check that our details as shown below are included on your consultation database: