Bedford Borough Local Plan 2040 Plan for Submission

Search representations

Results for Bedfordshire Police search

New search New search

Comment

Bedford Borough Local Plan 2040 Plan for Submission

2.2

Representation ID: 9612

Received: 08/08/2022

Respondent: Bedfordshire Police

Representation Summary:

The local plan 2040 looks sound to us. However, is it possible to have the following paragraph included somewhere? I suppose we come under Theme 4: Better Places but we will leave it to your discretion.


Bedfordshire Police Designing Out Crime Officers provide ongoing specialist advice on the security of new buildings and the refurbishments of existing ones to enable designs to be as safe and secure as reasonably possible, raising awareness of the principles of CPTED (crime prevention through environmental design) as well as generating awareness of, and ensuring the adoption of, recommended security standards and specifications.
We are keen to work with designers and developers at the earliest opportunity of a planning proposal and seek to encourage them to consider applying for Secured By Design developers award.

Object

Bedford Borough Local Plan 2040 Plan for Submission

5.4

Representation ID: 10474

Received: 29/07/2022

Respondent: Bedfordshire Police

Agent: West Mercia OPCC

Legally compliant? Yes

Sound? No

Duty to co-operate? Yes

Representation Summary:

Bedfordshire Police (BP) welcome and support the statement in paragraph 5.4 that key issues for the town centre include managing the night-time economy to reduce disturbance and make the area safer.

Whilst we support the provisions in Policies TC2, TC5 and TC9 that state proposals in town centres should not lead to anti-social behavior or other problems, the Local Plan would be far more effective in policy terms if it addressed this subject through a dedicated policy due to the complex issues involved.

As paragraph 97 of the National Planning Policy Framework states, planning policies should promote public safety and take account of wider security requirements, particularly threats in locations where large numbers of people are expected to congregate. Paragraph 97 goes on to state that policies should be informed by the most up-to-date information from the police to decide on steps that can be taken to reduce vulnerability, increase resilience, ensure public safety and provide security.

Given that the Local Plan breaks-up its policy on the evening and night-time economy across three policies, which when taken cumulatively do not grapple with this topic very well, the result is a policy approach that is not effective nor consistent with paragraphs 35 and 97 of the NPPF.

Object

Bedford Borough Local Plan 2040 Plan for Submission

Policy HOU1 Land at Greyfriars North, Bedford

Representation ID: 10475

Received: 29/07/2022

Respondent: Bedfordshire Police

Agent: West Mercia OPCC

Legally compliant? Yes

Sound? No

Duty to co-operate? Yes

Representation Summary:

Having worked with Bedford Borough Council during the preparation of its Local Plan and Infrastructure Delivery Plan, Bedfordshire Police (BP) is very disappointed with the outcome of this in two key respects:

1. Policies HOU1 – HOU 19 do not reference the police, or indeed the emergency services, infrastructure that will be required to support the developments they propose.

2. Although BP provided the Council and its consultants (AECOM) with a detailed Infrastructure Plan detailing precisely the police infrastructure required to support new housing growth in the Borough, only its contents in relation to premises requirements have been allowed for in the Council’s Infrastructure Delivery Plan (IDP) and even then inaccurately. The Council’s IDP also erroneously states that BP will eventually be able to meet the costs of delivering the infrastructure required to the growth envisaged by the Local Plan. In fact developer funding will be required to meet the costs. This was explained and evidenced at length in the Infrastructure Plan submitted by BP.

The above outcomes contrasts starkly with the basic expectation that when people move into a new housing estate or other development, they are protected by police and other emergency services that can operate efficiently and effectively in that vicinity. This applies to all levels of service, whether they ring 999 should the worst happen, or are simply benefitting from the reassurance of day-to-day neighbourhood policing for example.

It means in turn that the delivery of police and other emergency services infrastructure needs to be planned and funded in advance of a new development scheme, in the same way as utilities, education, health, transport and other public services that are currently specified in various places in Policies HOU1 – HOU19.

The potential impact on the police and other emergency services from a new development is not simply due to an increase in population, but also the location of where that new population is arising and the impact that it will have on the present disposition of emergency services resources. Delivery of services to the new communities is also not just about responding to crimes or incidents, but also includes community assurance, delivery of crime safety advice and where necessary providing referral responses when there are expressed concerns about the safety of children, the elderly or those with special needs, for example.

The experience of BP shows that new developments quickly take on the characteristics of surrounding areas in terms of calls, incident types and crime numbers, even from the point when materials are delivered to a site. Therefore, service provision needs to be expanded accordingly, as do those of other public service providers.

This is very important as development growth, particularly new housing development, has significant and permanent implications for the emergency services once delivered. Whether it takes place on green fields, urban centres or redundant factory sites, new schemes invariably result in an increased demand for ‘blue light’ services.

Hence why planning policies (i.e. HOU1 – HOU19) have a key role to play in ensuring that the police and other emergency services can provide the same level of service to the residents/occupiers of a new development as for existing residents, without compromising frontline services. After all, it is only possible to create successful places and support new communities if they are brought forward alongside adequate services and infrastructure.

BP would also like to point out at this juncture that mitigating the impact of a given scheme on the emergency services is not a false choice between design or infrastructure measures. These in fact go together to ensure a development is safe and secure. The emergency services want to see schemes that incorporate fire safety measures, adopt Secured by Design guidance, include suitable access for response vehicles (police cars, fire engines and ambulances alike) and provide the infrastructure necessary to enable service delivery and on-going coverage for the scheme in question. Current legislation and policy do not permit ambulance services, fire and rescue services and the police to downgrade the level of their provision to a new development scheme because it incorporates fire safety and/or crime prevention design measures. Appropriate new infrastructure for the police and other emergency services is therefore always required.

This is why sustainability of a development to the police and other emergency means two things. It firstly means schemes that both passively (through design measures) and actively (through infrastructure provision) preserve community safety. If a building or place does not provide these things, there can be no quality of life for the people who will reside, work or visit there, leading ultimately to an unsustainable development.

This is not only the view of our organisations. We are sure you will agree those who purchase properties on a development, who may bring up families there, or for whom it may be a place of work, will want to know that it is a safe environment underpinned by emergency services providing effective and efficient services. It is not only in the interests of the continual well-being of the new residential and/or business community that has been created, but also to protect those in existing communities that will border the development in question. Conversely, there would be great anxiety amongst all these people, new and existing, if the emergency services network was stretched to beyond capacity.

Turning to what is meant by ‘infrastructure’ in this context, the Council’s IDP takes the view that police infrastructure is purely new buildings or works to existing buildings. However, in an police and other emergency services context (and as BP showed in the infrastructure plan it submitted to the Council), infrastructure includes


• Vehicles of varying types and functions as needed to cover the development in question e.g. deployment for emergency response, patrol or follow-up for incidents.

• Personal equipment for officers and staff e.g. workstations, radios, protective equipment, uniforms and bicycles;

• Radio cover e.g. base stations, hardware and signal strengthening equipment;

• CCTV and Automatic Number Plate Recognition (ANPR) cameras;

• Mobile IT technologies e.g. body worn cameras and smart tablet computers; and

• Firefighting equipment such as Fire Lances and thermal imaging cameras.

This may seem an unnecessarily expansive definition, but what constitutes ‘infrastructure’ in any given case is what would not be otherwise directly needed by the emergency services but for the new development.

It is a view shared by the Government. Under Schedule 11 (204N(3) of the Levelling-up and Regeneration Bill, the emergency services are classified as infrastructure and the Bill also states that this encompasses facilities and equipment.

This is why we consider that in the absence of references to planning for police and emergency services infrastructure in Policies HOU1 – 19, they are unsound in the context of paragraph 35 of the National Planning Policy Framework.

Object

Bedford Borough Local Plan 2040 Plan for Submission

Policy HOU2 Mayes Yard, High Street and Silver Street, Bedford

Representation ID: 10476

Received: 29/07/2022

Respondent: Bedfordshire Police

Agent: West Mercia OPCC

Legally compliant? Yes

Sound? No

Duty to co-operate? Yes

Representation Summary:

Having worked with Bedford Borough Council during the preparation of its Local Plan and Infrastructure Delivery Plan, Bedfordshire Police (BP) is very disappointed with the outcome of this in two key respects:

1. Policies HOU1 – HOU 19 do not reference the police, or indeed the emergency services, infrastructure that will be required to support the developments they propose.

2. Although BP provided the Council and its consultants (AECOM) with a detailed Infrastructure Plan detailing precisely the police infrastructure required to support new housing growth in the Borough, only its contents in relation to premises requirements have been allowed for in the Council’s Infrastructure Delivery Plan (IDP) and even then inaccurately. The Council’s IDP also erroneously states that BP will eventually be able to meet the costs of delivering the infrastructure required to the growth envisaged by the Local Plan. In fact developer funding will be required to meet the costs. This was explained and evidenced at length in the Infrastructure Plan submitted by BP.

The above outcomes contrasts starkly with the basic expectation that when people move into a new housing estate or other development, they are protected by police and other emergency services that can operate efficiently and effectively in that vicinity. This applies to all levels of service, whether they ring 999 should the worst happen, or are simply benefitting from the reassurance of day-to-day neighbourhood policing for example.

It means in turn that the delivery of police and other emergency services infrastructure needs to be planned and funded in advance of a new development scheme, in the same way as utilities, education, health, transport and other public services that are currently specified in various places in Policies HOU1 – HOU19.

The potential impact on the police and other emergency services from a new development is not simply due to an increase in population, but also the location of where that new population is arising and the impact that it will have on the present disposition of emergency services resources. Delivery of services to the new communities is also not just about responding to crimes or incidents, but also includes community assurance, delivery of crime safety advice and where necessary providing referral responses when there are expressed concerns about the safety of children, the elderly or those with special needs, for example.

The experience of BP shows that new developments quickly take on the characteristics of surrounding areas in terms of calls, incident types and crime numbers, even from the point when materials are delivered to a site. Therefore, service provision needs to be expanded accordingly, as do those of other public service providers.

This is very important as development growth, particularly new housing development, has significant and permanent implications for the emergency services once delivered. Whether it takes place on green fields, urban centres or redundant factory sites, new schemes invariably result in an increased demand for ‘blue light’ services.

Hence why planning policies (i.e. HOU1 – HOU19) have a key role to play in ensuring that the police and other emergency services can provide the same level of service to the residents/occupiers of a new development as for existing residents, without compromising frontline services. After all, it is only possible to create successful places and support new communities if they are brought forward alongside adequate services and infrastructure.

BP would also like to point out at this juncture that mitigating the impact of a given scheme on the emergency services is not a false choice between design or infrastructure measures. These in fact go together to ensure a development is safe and secure. The emergency services want to see schemes that incorporate fire safety measures, adopt Secured by Design guidance, include suitable access for response vehicles (police cars, fire engines and ambulances alike) and provide the infrastructure necessary to enable service delivery and on-going coverage for the scheme in question. Current legislation and policy do not permit ambulance services, fire and rescue services and the police to downgrade the level of their provision to a new development scheme because it incorporates fire safety and/or crime prevention design measures. Appropriate new infrastructure for the police and other emergency services is therefore always required.

This is why sustainability of a development to the police and other emergency means two things. It firstly means schemes that both passively (through design measures) and actively (through infrastructure provision) preserve community safety. If a building or place does not provide these things, there can be no quality of life for the people who will reside, work or visit there, leading ultimately to an unsustainable development.

This is not only the view of our organisations. We are sure you will agree those who purchase properties on a development, who may bring up families there, or for whom it may be a place of work, will want to know that it is a safe environment underpinned by emergency services providing effective and efficient services. It is not only in the interests of the continual well-being of the new residential and/or business community that has been created, but also to protect those in existing communities that will border the development in question. Conversely, there would be great anxiety amongst all these people, new and existing, if the emergency services network was stretched to beyond capacity.

Turning to what is meant by ‘infrastructure’ in this context, the Council’s IDP takes the view that police infrastructure is purely new buildings or works to existing buildings. However, in an police and other emergency services context (and as BP showed in the infrastructure plan it submitted to the Council), infrastructure includes


• Vehicles of varying types and functions as needed to cover the development in question e.g. deployment for emergency response, patrol or follow-up for incidents.

• Personal equipment for officers and staff e.g. workstations, radios, protective equipment, uniforms and bicycles;

• Radio cover e.g. base stations, hardware and signal strengthening equipment;

• CCTV and Automatic Number Plate Recognition (ANPR) cameras;

• Mobile IT technologies e.g. body worn cameras and smart tablet computers; and

• Firefighting equipment such as Fire Lances and thermal imaging cameras.

This may seem an unnecessarily expansive definition, but what constitutes ‘infrastructure’ in any given case is what would not be otherwise directly needed by the emergency services but for the new development.

It is a view shared by the Government. Under Schedule 11 (204N(3) of the Levelling-up and Regeneration Bill, the emergency services are classified as infrastructure and the Bill also states that this encompasses facilities and equipment.

This is why we consider that in the absence of references to planning for police and emergency services infrastructure in Policies HOU1 – 19, they are unsound in the context of paragraph 35 of the National Planning Policy Framework.

Object

Bedford Borough Local Plan 2040 Plan for Submission

Policy HOU3 Land at Ampthill Road, Bedford

Representation ID: 10477

Received: 29/07/2022

Respondent: Bedfordshire Police

Agent: West Mercia OPCC

Legally compliant? Yes

Sound? No

Duty to co-operate? Yes

Representation Summary:

Having worked with Bedford Borough Council during the preparation of its Local Plan and Infrastructure Delivery Plan, Bedfordshire Police (BP) is very disappointed with the outcome of this in two key respects:

1. Policies HOU1 – HOU 19 do not reference the police, or indeed the emergency services, infrastructure that will be required to support the developments they propose.

2. Although BP provided the Council and its consultants (AECOM) with a detailed Infrastructure Plan detailing precisely the police infrastructure required to support new housing growth in the Borough, only its contents in relation to premises requirements have been allowed for in the Council’s Infrastructure Delivery Plan (IDP) and even then inaccurately. The Council’s IDP also erroneously states that BP will eventually be able to meet the costs of delivering the infrastructure required to the growth envisaged by the Local Plan. In fact developer funding will be required to meet the costs. This was explained and evidenced at length in the Infrastructure Plan submitted by BP.

The above outcomes contrasts starkly with the basic expectation that when people move into a new housing estate or other development, they are protected by police and other emergency services that can operate efficiently and effectively in that vicinity. This applies to all levels of service, whether they ring 999 should the worst happen, or are simply benefitting from the reassurance of day-to-day neighbourhood policing for example.

It means in turn that the delivery of police and other emergency services infrastructure needs to be planned and funded in advance of a new development scheme, in the same way as utilities, education, health, transport and other public services that are currently specified in various places in Policies HOU1 – HOU19.

The potential impact on the police and other emergency services from a new development is not simply due to an increase in population, but also the location of where that new population is arising and the impact that it will have on the present disposition of emergency services resources. Delivery of services to the new communities is also not just about responding to crimes or incidents, but also includes community assurance, delivery of crime safety advice and where necessary providing referral responses when there are expressed concerns about the safety of children, the elderly or those with special needs, for example.

The experience of BP shows that new developments quickly take on the characteristics of surrounding areas in terms of calls, incident types and crime numbers, even from the point when materials are delivered to a site. Therefore, service provision needs to be expanded accordingly, as do those of other public service providers.

This is very important as development growth, particularly new housing development, has significant and permanent implications for the emergency services once delivered. Whether it takes place on green fields, urban centres or redundant factory sites, new schemes invariably result in an increased demand for ‘blue light’ services.

Hence why planning policies (i.e. HOU1 – HOU19) have a key role to play in ensuring that the police and other emergency services can provide the same level of service to the residents/occupiers of a new development as for existing residents, without compromising frontline services. After all, it is only possible to create successful places and support new communities if they are brought forward alongside adequate services and infrastructure.

BP would also like to point out at this juncture that mitigating the impact of a given scheme on the emergency services is not a false choice between design or infrastructure measures. These in fact go together to ensure a development is safe and secure. The emergency services want to see schemes that incorporate fire safety measures, adopt Secured by Design guidance, include suitable access for response vehicles (police cars, fire engines and ambulances alike) and provide the infrastructure necessary to enable service delivery and on-going coverage for the scheme in question. Current legislation and policy do not permit ambulance services, fire and rescue services and the police to downgrade the level of their provision to a new development scheme because it incorporates fire safety and/or crime prevention design measures. Appropriate new infrastructure for the police and other emergency services is therefore always required.

This is why sustainability of a development to the police and other emergency means two things. It firstly means schemes that both passively (through design measures) and actively (through infrastructure provision) preserve community safety. If a building or place does not provide these things, there can be no quality of life for the people who will reside, work or visit there, leading ultimately to an unsustainable development.

This is not only the view of our organisations. We are sure you will agree those who purchase properties on a development, who may bring up families there, or for whom it may be a place of work, will want to know that it is a safe environment underpinned by emergency services providing effective and efficient services. It is not only in the interests of the continual well-being of the new residential and/or business community that has been created, but also to protect those in existing communities that will border the development in question. Conversely, there would be great anxiety amongst all these people, new and existing, if the emergency services network was stretched to beyond capacity.

Turning to what is meant by ‘infrastructure’ in this context, the Council’s IDP takes the view that police infrastructure is purely new buildings or works to existing buildings. However, in an police and other emergency services context (and as BP showed in the infrastructure plan it submitted to the Council), infrastructure includes


• Vehicles of varying types and functions as needed to cover the development in question e.g. deployment for emergency response, patrol or follow-up for incidents.

• Personal equipment for officers and staff e.g. workstations, radios, protective equipment, uniforms and bicycles;

• Radio cover e.g. base stations, hardware and signal strengthening equipment;

• CCTV and Automatic Number Plate Recognition (ANPR) cameras;

• Mobile IT technologies e.g. body worn cameras and smart tablet computers; and

• Firefighting equipment such as Fire Lances and thermal imaging cameras.

This may seem an unnecessarily expansive definition, but what constitutes ‘infrastructure’ in any given case is what would not be otherwise directly needed by the emergency services but for the new development.

It is a view shared by the Government. Under Schedule 11 (204N(3) of the Levelling-up and Regeneration Bill, the emergency services are classified as infrastructure and the Bill also states that this encompasses facilities and equipment.

This is why we consider that in the absence of references to planning for police and emergency services infrastructure in Policies HOU1 – 19, they are unsound in the context of paragraph 35 of the National Planning Policy Framework.

Object

Bedford Borough Local Plan 2040 Plan for Submission

Policy HOU4 Former Peacocks Auction House, Newnham Street, Bedford

Representation ID: 10478

Received: 29/07/2022

Respondent: Bedfordshire Police

Agent: West Mercia OPCC

Legally compliant? Yes

Sound? No

Duty to co-operate? Yes

Representation Summary:

Having worked with Bedford Borough Council during the preparation of its Local Plan and Infrastructure Delivery Plan, Bedfordshire Police (BP) is very disappointed with the outcome of this in two key respects:

1. Policies HOU1 – HOU 19 do not reference the police, or indeed the emergency services, infrastructure that will be required to support the developments they propose.

2. Although BP provided the Council and its consultants (AECOM) with a detailed Infrastructure Plan detailing precisely the police infrastructure required to support new housing growth in the Borough, only its contents in relation to premises requirements have been allowed for in the Council’s Infrastructure Delivery Plan (IDP) and even then inaccurately. The Council’s IDP also erroneously states that BP will eventually be able to meet the costs of delivering the infrastructure required to the growth envisaged by the Local Plan. In fact developer funding will be required to meet the costs. This was explained and evidenced at length in the Infrastructure Plan submitted by BP.

The above outcomes contrasts starkly with the basic expectation that when people move into a new housing estate or other development, they are protected by police and other emergency services that can operate efficiently and effectively in that vicinity. This applies to all levels of service, whether they ring 999 should the worst happen, or are simply benefitting from the reassurance of day-to-day neighbourhood policing for example.

It means in turn that the delivery of police and other emergency services infrastructure needs to be planned and funded in advance of a new development scheme, in the same way as utilities, education, health, transport and other public services that are currently specified in various places in Policies HOU1 – HOU19.

The potential impact on the police and other emergency services from a new development is not simply due to an increase in population, but also the location of where that new population is arising and the impact that it will have on the present disposition of emergency services resources. Delivery of services to the new communities is also not just about responding to crimes or incidents, but also includes community assurance, delivery of crime safety advice and where necessary providing referral responses when there are expressed concerns about the safety of children, the elderly or those with special needs, for example.

The experience of BP shows that new developments quickly take on the characteristics of surrounding areas in terms of calls, incident types and crime numbers, even from the point when materials are delivered to a site. Therefore, service provision needs to be expanded accordingly, as do those of other public service providers.

This is very important as development growth, particularly new housing development, has significant and permanent implications for the emergency services once delivered. Whether it takes place on green fields, urban centres or redundant factory sites, new schemes invariably result in an increased demand for ‘blue light’ services.

Hence why planning policies (i.e. HOU1 – HOU19) have a key role to play in ensuring that the police and other emergency services can provide the same level of service to the residents/occupiers of a new development as for existing residents, without compromising frontline services. After all, it is only possible to create successful places and support new communities if they are brought forward alongside adequate services and infrastructure.

BP would also like to point out at this juncture that mitigating the impact of a given scheme on the emergency services is not a false choice between design or infrastructure measures. These in fact go together to ensure a development is safe and secure. The emergency services want to see schemes that incorporate fire safety measures, adopt Secured by Design guidance, include suitable access for response vehicles (police cars, fire engines and ambulances alike) and provide the infrastructure necessary to enable service delivery and on-going coverage for the scheme in question. Current legislation and policy do not permit ambulance services, fire and rescue services and the police to downgrade the level of their provision to a new development scheme because it incorporates fire safety and/or crime prevention design measures. Appropriate new infrastructure for the police and other emergency services is therefore always required.

This is why sustainability of a development to the police and other emergency means two things. It firstly means schemes that both passively (through design measures) and actively (through infrastructure provision) preserve community safety. If a building or place does not provide these things, there can be no quality of life for the people who will reside, work or visit there, leading ultimately to an unsustainable development.

This is not only the view of our organisations. We are sure you will agree those who purchase properties on a development, who may bring up families there, or for whom it may be a place of work, will want to know that it is a safe environment underpinned by emergency services providing effective and efficient services. It is not only in the interests of the continual well-being of the new residential and/or business community that has been created, but also to protect those in existing communities that will border the development in question. Conversely, there would be great anxiety amongst all these people, new and existing, if the emergency services network was stretched to beyond capacity.

Turning to what is meant by ‘infrastructure’ in this context, the Council’s IDP takes the view that police infrastructure is purely new buildings or works to existing buildings. However, in an police and other emergency services context (and as BP showed in the infrastructure plan it submitted to the Council), infrastructure includes


• Vehicles of varying types and functions as needed to cover the development in question e.g. deployment for emergency response, patrol or follow-up for incidents.

• Personal equipment for officers and staff e.g. workstations, radios, protective equipment, uniforms and bicycles;

• Radio cover e.g. base stations, hardware and signal strengthening equipment;

• CCTV and Automatic Number Plate Recognition (ANPR) cameras;

• Mobile IT technologies e.g. body worn cameras and smart tablet computers; and

• Firefighting equipment such as Fire Lances and thermal imaging cameras.

This may seem an unnecessarily expansive definition, but what constitutes ‘infrastructure’ in any given case is what would not be otherwise directly needed by the emergency services but for the new development.

It is a view shared by the Government. Under Schedule 11 (204N(3) of the Levelling-up and Regeneration Bill, the emergency services are classified as infrastructure and the Bill also states that this encompasses facilities and equipment.

This is why we consider that in the absence of references to planning for police and emergency services infrastructure in Policies HOU1 – 19, they are unsound in the context of paragraph 35 of the National Planning Policy Framework.

Object

Bedford Borough Local Plan 2040 Plan for Submission

Policy HOU5 Abbey Field, West of Elstow

Representation ID: 10479

Received: 29/07/2022

Respondent: Bedfordshire Police

Agent: West Mercia OPCC

Legally compliant? Yes

Sound? No

Duty to co-operate? Yes

Representation Summary:

Having worked with Bedford Borough Council during the preparation of its Local Plan and Infrastructure Delivery Plan, Bedfordshire Police (BP) is very disappointed with the outcome of this in two key respects:

1. Policies HOU1 – HOU 19 do not reference the police, or indeed the emergency services, infrastructure that will be required to support the developments they propose.

2. Although BP provided the Council and its consultants (AECOM) with a detailed Infrastructure Plan detailing precisely the police infrastructure required to support new housing growth in the Borough, only its contents in relation to premises requirements have been allowed for in the Council’s Infrastructure Delivery Plan (IDP) and even then inaccurately. The Council’s IDP also erroneously states that BP will eventually be able to meet the costs of delivering the infrastructure required to the growth envisaged by the Local Plan. In fact developer funding will be required to meet the costs. This was explained and evidenced at length in the Infrastructure Plan submitted by BP.

The above outcomes contrasts starkly with the basic expectation that when people move into a new housing estate or other development, they are protected by police and other emergency services that can operate efficiently and effectively in that vicinity. This applies to all levels of service, whether they ring 999 should the worst happen, or are simply benefitting from the reassurance of day-to-day neighbourhood policing for example.

It means in turn that the delivery of police and other emergency services infrastructure needs to be planned and funded in advance of a new development scheme, in the same way as utilities, education, health, transport and other public services that are currently specified in various places in Policies HOU1 – HOU19.

The potential impact on the police and other emergency services from a new development is not simply due to an increase in population, but also the location of where that new population is arising and the impact that it will have on the present disposition of emergency services resources. Delivery of services to the new communities is also not just about responding to crimes or incidents, but also includes community assurance, delivery of crime safety advice and where necessary providing referral responses when there are expressed concerns about the safety of children, the elderly or those with special needs, for example.

The experience of BP shows that new developments quickly take on the characteristics of surrounding areas in terms of calls, incident types and crime numbers, even from the point when materials are delivered to a site. Therefore, service provision needs to be expanded accordingly, as do those of other public service providers.

This is very important as development growth, particularly new housing development, has significant and permanent implications for the emergency services once delivered. Whether it takes place on green fields, urban centres or redundant factory sites, new schemes invariably result in an increased demand for ‘blue light’ services.

Hence why planning policies (i.e. HOU1 – HOU19) have a key role to play in ensuring that the police and other emergency services can provide the same level of service to the residents/occupiers of a new development as for existing residents, without compromising frontline services. After all, it is only possible to create successful places and support new communities if they are brought forward alongside adequate services and infrastructure.

BP would also like to point out at this juncture that mitigating the impact of a given scheme on the emergency services is not a false choice between design or infrastructure measures. These in fact go together to ensure a development is safe and secure. The emergency services want to see schemes that incorporate fire safety measures, adopt Secured by Design guidance, include suitable access for response vehicles (police cars, fire engines and ambulances alike) and provide the infrastructure necessary to enable service delivery and on-going coverage for the scheme in question. Current legislation and policy do not permit ambulance services, fire and rescue services and the police to downgrade the level of their provision to a new development scheme because it incorporates fire safety and/or crime prevention design measures. Appropriate new infrastructure for the police and other emergency services is therefore always required.

This is why sustainability of a development to the police and other emergency means two things. It firstly means schemes that both passively (through design measures) and actively (through infrastructure provision) preserve community safety. If a building or place does not provide these things, there can be no quality of life for the people who will reside, work or visit there, leading ultimately to an unsustainable development.

This is not only the view of our organisations. We are sure you will agree those who purchase properties on a development, who may bring up families there, or for whom it may be a place of work, will want to know that it is a safe environment underpinned by emergency services providing effective and efficient services. It is not only in the interests of the continual well-being of the new residential and/or business community that has been created, but also to protect those in existing communities that will border the development in question. Conversely, there would be great anxiety amongst all these people, new and existing, if the emergency services network was stretched to beyond capacity.

Turning to what is meant by ‘infrastructure’ in this context, the Council’s IDP takes the view that police infrastructure is purely new buildings or works to existing buildings. However, in an police and other emergency services context (and as BP showed in the infrastructure plan it submitted to the Council), infrastructure includes


• Vehicles of varying types and functions as needed to cover the development in question e.g. deployment for emergency response, patrol or follow-up for incidents.

• Personal equipment for officers and staff e.g. workstations, radios, protective equipment, uniforms and bicycles;

• Radio cover e.g. base stations, hardware and signal strengthening equipment;

• CCTV and Automatic Number Plate Recognition (ANPR) cameras;

• Mobile IT technologies e.g. body worn cameras and smart tablet computers; and

• Firefighting equipment such as Fire Lances and thermal imaging cameras.

This may seem an unnecessarily expansive definition, but what constitutes ‘infrastructure’ in any given case is what would not be otherwise directly needed by the emergency services but for the new development.

It is a view shared by the Government. Under Schedule 11 (204N(3) of the Levelling-up and Regeneration Bill, the emergency services are classified as infrastructure and the Bill also states that this encompasses facilities and equipment.

This is why we consider that in the absence of references to planning for police and emergency services infrastructure in Policies HOU1 – 19, they are unsound in the context of paragraph 35 of the National Planning Policy Framework.

Object

Bedford Borough Local Plan 2040 Plan for Submission

Policy HOU6 The Cloisters, Church Lane, Bedford

Representation ID: 10480

Received: 29/07/2022

Respondent: Bedfordshire Police

Agent: West Mercia OPCC

Legally compliant? Yes

Sound? No

Duty to co-operate? Yes

Representation Summary:

Having worked with Bedford Borough Council during the preparation of its Local Plan and Infrastructure Delivery Plan, Bedfordshire Police (BP) is very disappointed with the outcome of this in two key respects:

1. Policies HOU1 – HOU 19 do not reference the police, or indeed the emergency services, infrastructure that will be required to support the developments they propose.

2. Although BP provided the Council and its consultants (AECOM) with a detailed Infrastructure Plan detailing precisely the police infrastructure required to support new housing growth in the Borough, only its contents in relation to premises requirements have been allowed for in the Council’s Infrastructure Delivery Plan (IDP) and even then inaccurately. The Council’s IDP also erroneously states that BP will eventually be able to meet the costs of delivering the infrastructure required to the growth envisaged by the Local Plan. In fact developer funding will be required to meet the costs. This was explained and evidenced at length in the Infrastructure Plan submitted by BP.

The above outcomes contrasts starkly with the basic expectation that when people move into a new housing estate or other development, they are protected by police and other emergency services that can operate efficiently and effectively in that vicinity. This applies to all levels of service, whether they ring 999 should the worst happen, or are simply benefitting from the reassurance of day-to-day neighbourhood policing for example.

It means in turn that the delivery of police and other emergency services infrastructure needs to be planned and funded in advance of a new development scheme, in the same way as utilities, education, health, transport and other public services that are currently specified in various places in Policies HOU1 – HOU19.

The potential impact on the police and other emergency services from a new development is not simply due to an increase in population, but also the location of where that new population is arising and the impact that it will have on the present disposition of emergency services resources. Delivery of services to the new communities is also not just about responding to crimes or incidents, but also includes community assurance, delivery of crime safety advice and where necessary providing referral responses when there are expressed concerns about the safety of children, the elderly or those with special needs, for example.

The experience of BP shows that new developments quickly take on the characteristics of surrounding areas in terms of calls, incident types and crime numbers, even from the point when materials are delivered to a site. Therefore, service provision needs to be expanded accordingly, as do those of other public service providers.

This is very important as development growth, particularly new housing development, has significant and permanent implications for the emergency services once delivered. Whether it takes place on green fields, urban centres or redundant factory sites, new schemes invariably result in an increased demand for ‘blue light’ services.

Hence why planning policies (i.e. HOU1 – HOU19) have a key role to play in ensuring that the police and other emergency services can provide the same level of service to the residents/occupiers of a new development as for existing residents, without compromising frontline services. After all, it is only possible to create successful places and support new communities if they are brought forward alongside adequate services and infrastructure.

BP would also like to point out at this juncture that mitigating the impact of a given scheme on the emergency services is not a false choice between design or infrastructure measures. These in fact go together to ensure a development is safe and secure. The emergency services want to see schemes that incorporate fire safety measures, adopt Secured by Design guidance, include suitable access for response vehicles (police cars, fire engines and ambulances alike) and provide the infrastructure necessary to enable service delivery and on-going coverage for the scheme in question. Current legislation and policy do not permit ambulance services, fire and rescue services and the police to downgrade the level of their provision to a new development scheme because it incorporates fire safety and/or crime prevention design measures. Appropriate new infrastructure for the police and other emergency services is therefore always required.

This is why sustainability of a development to the police and other emergency means two things. It firstly means schemes that both passively (through design measures) and actively (through infrastructure provision) preserve community safety. If a building or place does not provide these things, there can be no quality of life for the people who will reside, work or visit there, leading ultimately to an unsustainable development.

This is not only the view of our organisations. We are sure you will agree those who purchase properties on a development, who may bring up families there, or for whom it may be a place of work, will want to know that it is a safe environment underpinned by emergency services providing effective and efficient services. It is not only in the interests of the continual well-being of the new residential and/or business community that has been created, but also to protect those in existing communities that will border the development in question. Conversely, there would be great anxiety amongst all these people, new and existing, if the emergency services network was stretched to beyond capacity.

Turning to what is meant by ‘infrastructure’ in this context, the Council’s IDP takes the view that police infrastructure is purely new buildings or works to existing buildings. However, in an police and other emergency services context (and as BP showed in the infrastructure plan it submitted to the Council), infrastructure includes


• Vehicles of varying types and functions as needed to cover the development in question e.g. deployment for emergency response, patrol or follow-up for incidents.

• Personal equipment for officers and staff e.g. workstations, radios, protective equipment, uniforms and bicycles;

• Radio cover e.g. base stations, hardware and signal strengthening equipment;

• CCTV and Automatic Number Plate Recognition (ANPR) cameras;

• Mobile IT technologies e.g. body worn cameras and smart tablet computers; and

• Firefighting equipment such as Fire Lances and thermal imaging cameras.

This may seem an unnecessarily expansive definition, but what constitutes ‘infrastructure’ in any given case is what would not be otherwise directly needed by the emergency services but for the new development.

It is a view shared by the Government. Under Schedule 11 (204N(3) of the Levelling-up and Regeneration Bill, the emergency services are classified as infrastructure and the Bill also states that this encompasses facilities and equipment.

This is why we consider that in the absence of references to planning for police and emergency services infrastructure in Policies HOU1 – 19, they are unsound in the context of paragraph 35 of the National Planning Policy Framework.

Object

Bedford Borough Local Plan 2040 Plan for Submission

Policy HOU7 Land at Williamson Road, Kempston

Representation ID: 10481

Received: 29/07/2022

Respondent: Bedfordshire Police

Agent: West Mercia OPCC

Legally compliant? Yes

Sound? No

Duty to co-operate? Yes

Representation Summary:

Having worked with Bedford Borough Council during the preparation of its Local Plan and Infrastructure Delivery Plan, Bedfordshire Police (BP) is very disappointed with the outcome of this in two key respects:

1. Policies HOU1 – HOU 19 do not reference the police, or indeed the emergency services, infrastructure that will be required to support the developments they propose.

2. Although BP provided the Council and its consultants (AECOM) with a detailed Infrastructure Plan detailing precisely the police infrastructure required to support new housing growth in the Borough, only its contents in relation to premises requirements have been allowed for in the Council’s Infrastructure Delivery Plan (IDP) and even then inaccurately. The Council’s IDP also erroneously states that BP will eventually be able to meet the costs of delivering the infrastructure required to the growth envisaged by the Local Plan. In fact developer funding will be required to meet the costs. This was explained and evidenced at length in the Infrastructure Plan submitted by BP.

The above outcomes contrasts starkly with the basic expectation that when people move into a new housing estate or other development, they are protected by police and other emergency services that can operate efficiently and effectively in that vicinity. This applies to all levels of service, whether they ring 999 should the worst happen, or are simply benefitting from the reassurance of day-to-day neighbourhood policing for example.

It means in turn that the delivery of police and other emergency services infrastructure needs to be planned and funded in advance of a new development scheme, in the same way as utilities, education, health, transport and other public services that are currently specified in various places in Policies HOU1 – HOU19.

The potential impact on the police and other emergency services from a new development is not simply due to an increase in population, but also the location of where that new population is arising and the impact that it will have on the present disposition of emergency services resources. Delivery of services to the new communities is also not just about responding to crimes or incidents, but also includes community assurance, delivery of crime safety advice and where necessary providing referral responses when there are expressed concerns about the safety of children, the elderly or those with special needs, for example.

The experience of BP shows that new developments quickly take on the characteristics of surrounding areas in terms of calls, incident types and crime numbers, even from the point when materials are delivered to a site. Therefore, service provision needs to be expanded accordingly, as do those of other public service providers.

This is very important as development growth, particularly new housing development, has significant and permanent implications for the emergency services once delivered. Whether it takes place on green fields, urban centres or redundant factory sites, new schemes invariably result in an increased demand for ‘blue light’ services.

Hence why planning policies (i.e. HOU1 – HOU19) have a key role to play in ensuring that the police and other emergency services can provide the same level of service to the residents/occupiers of a new development as for existing residents, without compromising frontline services. After all, it is only possible to create successful places and support new communities if they are brought forward alongside adequate services and infrastructure.

BP would also like to point out at this juncture that mitigating the impact of a given scheme on the emergency services is not a false choice between design or infrastructure measures. These in fact go together to ensure a development is safe and secure. The emergency services want to see schemes that incorporate fire safety measures, adopt Secured by Design guidance, include suitable access for response vehicles (police cars, fire engines and ambulances alike) and provide the infrastructure necessary to enable service delivery and on-going coverage for the scheme in question. Current legislation and policy do not permit ambulance services, fire and rescue services and the police to downgrade the level of their provision to a new development scheme because it incorporates fire safety and/or crime prevention design measures. Appropriate new infrastructure for the police and other emergency services is therefore always required.

This is why sustainability of a development to the police and other emergency means two things. It firstly means schemes that both passively (through design measures) and actively (through infrastructure provision) preserve community safety. If a building or place does not provide these things, there can be no quality of life for the people who will reside, work or visit there, leading ultimately to an unsustainable development.

This is not only the view of our organisations. We are sure you will agree those who purchase properties on a development, who may bring up families there, or for whom it may be a place of work, will want to know that it is a safe environment underpinned by emergency services providing effective and efficient services. It is not only in the interests of the continual well-being of the new residential and/or business community that has been created, but also to protect those in existing communities that will border the development in question. Conversely, there would be great anxiety amongst all these people, new and existing, if the emergency services network was stretched to beyond capacity.

Turning to what is meant by ‘infrastructure’ in this context, the Council’s IDP takes the view that police infrastructure is purely new buildings or works to existing buildings. However, in an police and other emergency services context (and as BP showed in the infrastructure plan it submitted to the Council), infrastructure includes


• Vehicles of varying types and functions as needed to cover the development in question e.g. deployment for emergency response, patrol or follow-up for incidents.

• Personal equipment for officers and staff e.g. workstations, radios, protective equipment, uniforms and bicycles;

• Radio cover e.g. base stations, hardware and signal strengthening equipment;

• CCTV and Automatic Number Plate Recognition (ANPR) cameras;

• Mobile IT technologies e.g. body worn cameras and smart tablet computers; and

• Firefighting equipment such as Fire Lances and thermal imaging cameras.

This may seem an unnecessarily expansive definition, but what constitutes ‘infrastructure’ in any given case is what would not be otherwise directly needed by the emergency services but for the new development.

It is a view shared by the Government. Under Schedule 11 (204N(3) of the Levelling-up and Regeneration Bill, the emergency services are classified as infrastructure and the Bill also states that this encompasses facilities and equipment.

This is why we consider that in the absence of references to planning for police and emergency services infrastructure in Policies HOU1 – 19, they are unsound in the context of paragraph 35 of the National Planning Policy Framework.

Object

Bedford Borough Local Plan 2040 Plan for Submission

Policy HOU8 Land west of Police Headquarters, Woburn Road, Kempston

Representation ID: 10482

Received: 29/07/2022

Respondent: Bedfordshire Police

Agent: West Mercia OPCC

Legally compliant? Yes

Sound? No

Duty to co-operate? Yes

Representation Summary:

Having worked with Bedford Borough Council during the preparation of its Local Plan and Infrastructure Delivery Plan, Bedfordshire Police (BP) is very disappointed with the outcome of this in two key respects:

1. Policies HOU1 – HOU 19 do not reference the police, or indeed the emergency services, infrastructure that will be required to support the developments they propose.

2. Although BP provided the Council and its consultants (AECOM) with a detailed Infrastructure Plan detailing precisely the police infrastructure required to support new housing growth in the Borough, only its contents in relation to premises requirements have been allowed for in the Council’s Infrastructure Delivery Plan (IDP) and even then inaccurately. The Council’s IDP also erroneously states that BP will eventually be able to meet the costs of delivering the infrastructure required to the growth envisaged by the Local Plan. In fact developer funding will be required to meet the costs. This was explained and evidenced at length in the Infrastructure Plan submitted by BP.

The above outcomes contrasts starkly with the basic expectation that when people move into a new housing estate or other development, they are protected by police and other emergency services that can operate efficiently and effectively in that vicinity. This applies to all levels of service, whether they ring 999 should the worst happen, or are simply benefitting from the reassurance of day-to-day neighbourhood policing for example.

It means in turn that the delivery of police and other emergency services infrastructure needs to be planned and funded in advance of a new development scheme, in the same way as utilities, education, health, transport and other public services that are currently specified in various places in Policies HOU1 – HOU19.

The potential impact on the police and other emergency services from a new development is not simply due to an increase in population, but also the location of where that new population is arising and the impact that it will have on the present disposition of emergency services resources. Delivery of services to the new communities is also not just about responding to crimes or incidents, but also includes community assurance, delivery of crime safety advice and where necessary providing referral responses when there are expressed concerns about the safety of children, the elderly or those with special needs, for example.

The experience of BP shows that new developments quickly take on the characteristics of surrounding areas in terms of calls, incident types and crime numbers, even from the point when materials are delivered to a site. Therefore, service provision needs to be expanded accordingly, as do those of other public service providers.

This is very important as development growth, particularly new housing development, has significant and permanent implications for the emergency services once delivered. Whether it takes place on green fields, urban centres or redundant factory sites, new schemes invariably result in an increased demand for ‘blue light’ services.

Hence why planning policies (i.e. HOU1 – HOU19) have a key role to play in ensuring that the police and other emergency services can provide the same level of service to the residents/occupiers of a new development as for existing residents, without compromising frontline services. After all, it is only possible to create successful places and support new communities if they are brought forward alongside adequate services and infrastructure.

BP would also like to point out at this juncture that mitigating the impact of a given scheme on the emergency services is not a false choice between design or infrastructure measures. These in fact go together to ensure a development is safe and secure. The emergency services want to see schemes that incorporate fire safety measures, adopt Secured by Design guidance, include suitable access for response vehicles (police cars, fire engines and ambulances alike) and provide the infrastructure necessary to enable service delivery and on-going coverage for the scheme in question. Current legislation and policy do not permit ambulance services, fire and rescue services and the police to downgrade the level of their provision to a new development scheme because it incorporates fire safety and/or crime prevention design measures. Appropriate new infrastructure for the police and other emergency services is therefore always required.

This is why sustainability of a development to the police and other emergency means two things. It firstly means schemes that both passively (through design measures) and actively (through infrastructure provision) preserve community safety. If a building or place does not provide these things, there can be no quality of life for the people who will reside, work or visit there, leading ultimately to an unsustainable development.

This is not only the view of our organisations. We are sure you will agree those who purchase properties on a development, who may bring up families there, or for whom it may be a place of work, will want to know that it is a safe environment underpinned by emergency services providing effective and efficient services. It is not only in the interests of the continual well-being of the new residential and/or business community that has been created, but also to protect those in existing communities that will border the development in question. Conversely, there would be great anxiety amongst all these people, new and existing, if the emergency services network was stretched to beyond capacity.

Turning to what is meant by ‘infrastructure’ in this context, the Council’s IDP takes the view that police infrastructure is purely new buildings or works to existing buildings. However, in an police and other emergency services context (and as BP showed in the infrastructure plan it submitted to the Council), infrastructure includes


• Vehicles of varying types and functions as needed to cover the development in question e.g. deployment for emergency response, patrol or follow-up for incidents.

• Personal equipment for officers and staff e.g. workstations, radios, protective equipment, uniforms and bicycles;

• Radio cover e.g. base stations, hardware and signal strengthening equipment;

• CCTV and Automatic Number Plate Recognition (ANPR) cameras;

• Mobile IT technologies e.g. body worn cameras and smart tablet computers; and

• Firefighting equipment such as Fire Lances and thermal imaging cameras.

This may seem an unnecessarily expansive definition, but what constitutes ‘infrastructure’ in any given case is what would not be otherwise directly needed by the emergency services but for the new development.

It is a view shared by the Government. Under Schedule 11 (204N(3) of the Levelling-up and Regeneration Bill, the emergency services are classified as infrastructure and the Bill also states that this encompasses facilities and equipment.

This is why we consider that in the absence of references to planning for police and emergency services infrastructure in Policies HOU1 – 19, they are unsound in the context of paragraph 35 of the National Planning Policy Framework.

For instructions on how to use the system and make comments, please see our help guide.