Comment

Plan for submission evidence base

Representation ID: 10401

Received: 29/07/2022

Respondent: Orchestra Land

Agent: Arrow Planning Limited

Representation Summary:

In particular, the Sustainability Appraisal testing of the ‘stepped approach’ is fundamentally flawed, with the justifications given for positive scores around items such as previously developed land (see SA Appendix 8 p. 113) being conjecture. The statement that the stepped approach would have a more beneficial effect on development on previously developed land is incorrect; sites which are previously developed land can come forward irrespective of the stepped approach and the SA does not identify any previously developed land south of Bedford that benefits from the new rail stations and links. Indeed, the allocations at locations such as the Wixams are not on previously developed land but greenfield land. The SA must, therefore, be re-run with a correct assessment of the stepped approach.
2.14 A correct assessment of the stepped approach in the SA would identify that there are risks with being reliant upon so much growth linked to strategic infrastructure outside of the control of developers and the Council. This would in turn mean that many of the benefits may not be realised, or realised later in the plan period, pushing housing delivery outside of the plan period.
This is particularly evident in this area, with the still awaited deliver of the Wixams rail station. That station was due to be completed in 2015 and is now timetabled for opening in 2024.
2.16 Instead, the Plan should take a more balanced approach, with a reduction in numbers on some of the strategic sites and the delivery of smaller strategic allocations which can come forward earlier and increase housing delivery in the period to 2030.
2.17 The Local Plan is not sound, as it is not justified or effective. To make the Plan sound the trajectory should be amended. Reflecting the fact that the Local Plan may not be adopted until 2023, and thus higher delivery in 2024 (compared to the Local Plan 2030), the trajectory should be as follows:
2020/21- 2023/24: 970dpa
2024/25 – 2039/40: 1,423dpa
2.18 Aligned with this, new allocations will be required, and a reduction in the number of dwellings on some strategic sites may be required. These matters are dealt with below.