Representation Summary:

I did not agree that this consultation was sound or fair. I agree with Staploe Parish Council who responded to question 4 as follows: “Staploe Parish Council object in the strongest terms to the suggestion in the brown option that our parish is a brownfield site or under-utilised land. Our whole parish is classed as open countryside for planning purposes. Our three tiny hamlets are not even classed as a small settlement in the Local Plan 2030 definition (6.21) and we are therefore defined as open countryside. I feel that describing the brown option which would see the majority of our parish covered in a large scale, high density, urban development as using brownfield or under-utilised land is very misleading. I believe this could compromise the validity of the consultation as those responding would logically propose development on brownfield or under-utilised land over greenfield sites.

I believe the pros and cons list for the brown option is very inaccurate for our parish. A large development in Staploe parish would not support services etc in Bedford – we are 13 miles away and people would use services in St. Neots which are already under pressure due to large scale development on the eastern side of the town. There would be very little potential for residents here to make sustainable travel choices – we have one bus on Thursday, and it would require huge investment to improve public transport. This would not reduce the need for growth in rural areas – we are a rural area, and it proposes building all over our parish. Development in our parish would not improve viability of retail and leisure in Bedford Borough. People would go to St. Neots.”

I still feel that this is a fair reflection that the issues and options consultation was flawed because it led people to believe that our rural parish was urban with underutilised or brownfield land which is very far from the case.

In addition, the issues and options consultation was conducted during the covid pandemic when it was not possible to meet more than 6 people outside. I believe this was reflected in the responses: Number of respondents = 315
• 222 were from within the borough – out of a total estimated population of 174,687. This is a pitiful 0.12% response rate
• 93 were from outside the Borough or did not give a postcode
• 53% were from individuals.
Top areas for numbers of responses:
• Bedford 46
• Sharnbrook 23
• Staploe 18 (a 6% response rate which was 50 times the Borough average)
By contrast – no other areas were in double figures. This brings into further question the validity of the consultation. I believe Bedford Borough Council should be arguing for an extension of time such that the Local Plan 2030 remains “in date” for another year to enable proper consultation, to allow the East West rail route to be announced and for the Oxford Cambridge Arc to decide about development corporations.
100-word Summary
I believe that the Issues and Options consultation was invalid. It represented growth in our parish as “urban growth” showing our whole parish as brown – urban land on brownfield or under-utilised land. This is profoundly untrue. Our parish is entirely rural and classed as open countryside and is all utilised as high-quality agricultural land (grade 2).
I would also call into question the effectiveness of the issues and options consultation as only 0.12% of the population responded.
A rail-based growth strategy policy may be required if growth is to be located around rail.

Object

Local Plan 2040 Draft Plan - Strategy options and draft policies consultation

Representation ID: 5858

Received: 08/09/2021

Respondent: Mr Norman Hoy

Representation Summary:

I did not agree that this consultation was sound or fair. I agree with Staploe Parish Council who responded to question 4 as follows: “Staploe Parish Council object in the strongest terms to the suggestion in the brown option that our parish is a brownfield site or under utilised land. Our whole parish is classed as open countryside for planning purposes. Our three tiny hamlets are not even classed as a small settlement in the Local Plan 2030 definition (6.21) and we are therefore defined as open countryside. We feel that describing the brown option which would see the majority of our parish covered in a large scale, high density, urban development as using brownfield or under utilised land is very misleading. We believe this could compromise the validity of the consultation as those responding would logically propose development on brownfield or under-utilised land over greenfield sites.

We believe the pros and cons list for the brown option is very inaccurate for our parish. A large development in Staploe parish would not support services etc in Bedford – we are 13 miles away and people would use services in St. Neots which are already under pressure due to large scale development on the eastern side of the town. There would be very little potential for residents here to make sustainable travel choices – we have one bus on Thursday and it would require huge investment to improve public transport. This would not reduce the need for growth in rural areas – we are a rural area and it proposes building all over our parish. Development in our parish would not improve viability of retail and leisure in Bedford Borough. People would go to St. Neots.”

We still feel that this is a fair reflection that the issues and options consultation was flawed because it led people to believe that our rural parish was urban with underutilised or brownfield land which is very far from the case.

In addition, the issues and options consultation was conducted during the covid pandemic when it was not possible to meet more than 6 people outside. We believe this was reflected in the responses: Number of respondents = 315
• 222 were from within the borough – out of a total estimated population of 174,687. This is a pitiful 0.12% response rate
• 93 were from outside the Borough or did not give a postcode
• 53% were from individuals.

Top areas for numbers of responses:
• Bedford 46
• Sharnbrook 23
• Staploe 18 (a 6% response rate which was 50 times the Borough average)
By contrast – no other areas were in double figures. This brings into further question the validity of the consultation. We believe Bedford Borough Council should be arguing for an extension of time such that the Local Plan 2030 remains “in date” for another year to enable proper consultation, to allow the East West rail route to be announced and for the Oxford Cambridge Arc to decide about development corporations.
100 word summary
I believe that the Issues and Options consultation was invalid. It represented growth in our parish as “urban growth” showing our whole parish as brown – urban land on brownfield or under utilised land. This is profoundly untrue. Our parish is entirely rural and classed as open countryside and is all utilised as high quality agricultural land (grade 2).
We would also call into question the effectiveness of the issues and options consultation as only 0.12% of the population responded.
A rail based growth strategy policy may be required if growth is to be located around rail.

Object

Local Plan 2040 Draft Plan - Strategy options and draft policies consultation

Representation ID: 5980

Received: 08/09/2021

Respondent: Staploe Parish Council

Representation Summary:

I do not agree that this consultation was sound or fair. I agree with Staploe Parish Council who responded to question 4 as follows: “Staploe Parish Council object in the strongest terms to the suggestion in the brown option that our parish is a brownfield site or under utilised land. Our whole parish is classed as open countryside for planning purposes. Our tiny hamlets are not even classed as a small settlement in the Local Plan 2030 definition (6.21) and we are therefore defined as open countryside. We feel that describing the brown option which would see the majority of our parish covered in a large scale, high density, urban development as using brownfield or under utilised land is very misleading. We believe this could compromise the validity of the consultation as those responding would logically propose development on brownfield or under-utilised land over greenfield sites.
We believe the pros and cons list for the brown option is very inaccurate for our parish. A large development in Staploe parish would not support services etc in Bedford – we are 13 miles away and people would use services in St. Neots which are already under pressure due to large scale development on the eastern side of the town. There would be very little potential for residents here to make sustainable travel choices – we have one bus on Thursday and it would require huge investment to improve public transport. This would not reduce the need for growth in rural areas – we are a rural area and it proposes building all over our parish. Development in our parish would not improve viability of retail and leisure in Bedford Borough. People would go to St. Neots or Biggleswade Retail Park.”

I still feel strongly that this is a fair reflection that the issues and options consultation were flawed because it led people to believe that our rural parish was urban with underutilised or brownfield land which is very far from the case.
In addition, the issues and options consultation was conducted during the covid pandemic when it was not possible to meet more than 6 people outside. We believe this was reflected in the responses: Number of respondents = 315
• 222 were from within the borough – out of a total estimated population of 174,687. This is a pitiful 0.12% response rate
• 93 were from outside the Borough or did not give a postcode
• 53% were from individuals.
Top areas for numbers of responses:
• Bedford 46
• Sharnbrook 23
• Staploe 18 (a 6% response rate which was 50 times the Borough average)

By contrast – no other areas were in double figures. This brings into further question the validity of the consultation.
I believe Bedford Borough Council should be arguing for an extension of time such that the Local Plan 2030 remains “in date” for another year to enable proper consultation, to allow the East West rail route to be announced and for the Oxford Cambridge Arc to decide about development corporations.
100 word summary
I believe that the Issues and Options consultation was invalid. It represented growth in our parish as “urban growth” showing our whole parish as brown – urban land on brownfield or under utilised land. This is profoundly untrue. Our parish is entirely rural and classed as open countryside and is all utilised as high quality agricultural land (grade 2).
We would also call into question the effectiveness of the issues and options consultation as only 0.12% of the population responded.
A rail based growth strategy policy may be required if growth is to be located around rail.

Object

Local Plan 2040 Draft Plan - Strategy options and draft policies consultation

Representation ID: 6027

Received: 08/09/2021

Respondent: Mrs Christina Farmer

Representation Summary:

I did not agree that this consultation was sound or fair. I agree with Staploe Parish Council who responded to question 4 as follows: “Staploe Parish Council object in the strongest terms to the suggestion in the brown option that our parish is a brownfield site or under utilised land. Our whole parish is classed as open countryside for planning purposes. Our three tiny hamlets are not even classed as a small settlement in the Local Plan 2030 definition (6.21) and we are therefore defined as open countryside. We feel that describing the brown option which would see the majority of our parish covered in a large scale, high density, urban development as using brownfield or under utilised land is very misleading. We believe this could compromise the validity of the consultation as those responding would logically propose development on brownfield or under-utilised land over greenfield sites.

We believe the pros and cons list for the brown option is very inaccurate for our parish. A large development in Staploe parish would not support services etc in Bedford – we are 13 miles away and people would use services in St. Neots which are already under pressure due to large scale development on the eastern side of the town. There would be very little potential for residents here to make sustainable travel choices – we have one bus on Thursday and it would require huge investment to improve public transport. This would not reduce the need for growth in rural areas – we are a rural area and it proposes building all over our parish. Development in our parish would not improve viability of retail and leisure in Bedford Borough. People would go to St. Neots.”

We still feel that this is a fair reflection that the issues and options consultation was flawed because it led people to believe that our rural parish was urban with underutilised or brownfield land which is very far from the case.

In addition, the issues and options consultation was conducted during the covid pandemic when it was not possible to meet more than 6 people outside. We believe this was reflected in the responses: Number of respondents = 315
• 222 were from within the borough – out of a total estimated population of 174,687. This is a pitiful 0.12% response rate
• 93 were from outside the Borough or did not give a postcode
• 53% were from individuals.

Top areas for numbers of responses:
• Bedford 46
• Sharnbrook 23
• Staploe 18 (a 6% response rate which was 50 times the Borough average)
By contrast – no other areas were in double figures. This brings into further question the validity of the consultation. We believe Bedford Borough Council should be arguing for an extension of time such that the Local Plan 2030 remains “in date” for another year to enable proper consultation, to allow the East West rail route to be announced and for the Oxford Cambridge Arc to decide about development corporations.

Object

Local Plan 2040 Draft Plan - Strategy options and draft policies consultation

Representation ID: 6117

Received: 09/09/2021

Respondent: Jen Giles

Representation Summary:

Staploe Parish Council did not agree that this consultation was sound or fair. We responded to question 4 as follows: “Staploe Parish Council object in the strongest terms to the suggestion in the brown option that our parish is a brownfield site or under utilised land. Our whole parish is classed as open countryside for planning purposes. Our three tiny hamlets are not even classed as a small settlement in the Local Plan 2030 definition (6.21) and we are therefore defined as open countryside. We feel that describing the brown option which would see the majority of our parish covered in a large scale, high density, urban development as using brownfield or under utilised land is very misleading. We believe this could compromise the validity of the consultation as those responding would logically propose development on brownfield or under-utilised land over greenfield sites.

We believe the pros and cons list for the brown option is very inaccurate for our parish. A large development in Staploe parish would not support services etc in Bedford – we are 13 miles away and people would use services in St. Neots which are already under pressure due to large scale development on the eastern side of the town. There would be very little potential for residents here to make sustainable travel choices – we have one bus on Thursday and it would require huge investment to improve public transport. This would not reduce the need for growth in rural areas – we are a rural area and it proposes building all over our parish. Development in our parish would not improve viability of retail and leisure in Bedford Borough. People would go to St. Neots.”


We still feel that this is a fair reflection that the issues and options consultation was flawed because it led people to believe that our rural parish was urban with underutilised or brownfield land which is very far from the case.

In addition, the issues and options consultation was conducted during the covid pandemic when it was not possible to meet more than 6 people outside. We believe this was reflected in the responses: Number of respondents = 315
• 222 were from within the borough – out of a total estimated population of 174,687. This is a pitiful 0.12% response rate
• 93 were from outside the Borough or did not give a postcode
• 53% were from individuals.

Top areas for numbers of responses:
• Bedford 46
• Sharnbrook 23
• Staploe 18 (a 6% response rate which was 50 times the Borough average)
By contrast – no other areas were in double figures. This brings into further question the validity of the consultation. We believe Bedford Borough Council should be arguing for an extension of time such that the Local Plan 2030 remains “in date” for another year to enable proper consultation, to allow the East West rail route to be announced and for the Oxford Cambridge Arc to decide about development corporations.

Object

Local Plan 2040 Draft Plan - Strategy options and draft policies consultation

Representation ID: 6171

Received: 09/09/2021

Respondent: Mrs Sandie Tusting

Representation Summary:

Staploe Parish Council did not agree that this consultation was sound or fair. We responded to question 4 as follows: “Staploe Parish Council object in the strongest terms to the suggestion in the brown option that our parish is a brownfield site or under utilised land. Our whole parish is classed as open countryside for planning purposes. Our three tiny hamlets are not even classed as a small settlement in the Local Plan 2030 definition (6.21) and we are therefore defined as open countryside. We feel that describing the brown option which would see the majority of our parish covered in a large scale, high density, urban development as using brownfield or under utilised land is very misleading. We believe this could compromise the validity of the consultation as those responding would logically propose development on brownfield or under-utilised land over greenfield sites.

We believe the pros and cons list for the brown option is very inaccurate for our parish. A large development in Staploe parish would not support services etc in Bedford – we are 13 miles away and people would use services in St. Neots which are already under pressure due to large scale development on the eastern side of the town. There would be very little potential for residents here to make sustainable travel choices – we have one bus on Thursday and it would require huge investment to improve public transport. This would not reduce the need for growth in rural areas – we are a rural area and it proposes building all over our parish. Development in our parish would not improve viability of retail and leisure in Bedford Borough. People would go to St. Neots.”

We still feel that this is a fair reflection that the issues and options consultation was flawed because it led people to believe that our rural parish was urban with underutilised or brownfield land which is very far from the case.

In addition, the issues and options consultation was conducted during the covid pandemic when it was not possible to meet more than 6 people outside. We believe this was reflected in the responses: Number of respondents = 315
• 222 were from within the borough – out of a total estimated population of 174,687. This is a pitiful 0.12% response rate
• 93 were from outside the Borough or did not give a postcode
• 53% were from individuals.

Top areas for numbers of responses:
• Bedford 46
• Sharnbrook 23
• Staploe 18 (a 6% response rate which was 50 times the Borough average)
By contrast – no other areas were in double figures. This brings into further question the validity of the consultation. We believe Bedford Borough Council should be arguing for an extension of time such that the Local Plan 2030 remains “in date” for another year to enable proper consultation, to allow the East West rail route to be announced and for the Oxford Cambridge Arc to decide about development corporations.

Object

Local Plan 2040 Draft Plan - Strategy options and draft policies consultation

Representation ID: 6217

Received: 09/09/2021

Respondent: Peter Coles

Representation Summary:

Staploe Parish Council did not agree that this consultation was sound or fair. We responded to question 4 as follows: “Staploe Parish Council object in the strongest terms to the suggestion in the brown option that our parish is a brownfield site or under utilised land. Our whole parish is classed as open countryside for planning purposes. Our three tiny hamlets are not even classed as a small settlement in the Local Plan 2030 definition (6.21) and we are therefore defined as open countryside. We feel that describing the brown option which would see the majority of our parish covered in a large scale, high density, urban development as using brownfield or under utilised land is very misleading. We believe this could compromise the validity of the consultation as those responding would logically propose development on brownfield or under-utilised land over greenfield sites.

We believe the pros and cons list for the brown option is very inaccurate for our parish. A large development in Staploe parish would not support services etc in Bedford – we are 13 miles away and people would use services in St. Neots which are already under pressure due to large scale development on the eastern side of the town. There would be very little potential for residents here to make sustainable travel choices – we have one bus on Thursday and it would require huge investment to improve public transport. This would not reduce the need for growth in rural areas – we are a rural area and it proposes building all over our parish. Development in our parish would not improve viability of retail and leisure in Bedford Borough. People would go to St. Neots.”

We still feel that this is a fair reflection that the issues and options consultation was flawed because it led people to believe that our rural parish was urban with underutilised or brownfield land which is very far from the case.

In addition, the issues and options consultation was conducted during the covid pandemic when it was not possible to meet more than 6 people outside. We believe this was reflected in the responses: Number of respondents = 315
• 222 were from within the borough – out of a total estimated population of 174,687. This is a pitiful 0.12% response rate
• 93 were from outside the Borough or did not give a postcode
• 53% were from individuals.

Top areas for numbers of responses:
• Bedford 46
• Sharnbrook 23
• Staploe 18 (a 6% response rate which was 50 times the Borough average)
By contrast – no other areas were in double figures. This brings into further question the validity of the consultation. We believe Bedford Borough Council should be arguing for an extension of time such that the Local Plan 2030 remains “in date” for another year to enable proper consultation, to allow the East West rail route to be announced and for the Oxford Cambridge Arc to decide about development corporations.

Object

Local Plan 2040 Draft Plan - Strategy options and draft policies consultation

Representation ID: 6318

Received: 10/09/2021

Respondent: Mr Paul Zwetsloot

Representation Summary:

Staploe Parish Council did not agree that this consultation was sound or fair. We responded to question 4 as follows: “Staploe Parish Council object in the strongest terms to the suggestion in the brown option that our parish is a brownfield site or under utilised land. Our whole parish is classed as open countryside for planning purposes. Our three tiny hamlets are not even classed as a small settlement in the Local Plan 2030 definition (6.21) and we are therefore defined as open countryside. We feel that describing the brown option which would see the majority of our parish covered in a large scale, high density, urban development as using brownfield or under utilised land is very misleading. We believe this could compromise the validity of the consultation as those responding would logically propose development on brownfield or under-utilised land over greenfield sites.
We believe the pros and cons list for the brown option is very inaccurate for our parish. A large development in Staploe parish would not support services etc in Bedford – we are 13 miles away and people would use services in St. Neots which are already under pressure due to large scale development on the eastern side of the town. There would be very little potential for residents here to make sustainable travel choices – we have one bus on Thursday and it would require huge investment to improve public transport. This would not reduce the need for growth in rural areas – we are a rural area and it proposes building all over our parish. Development in our parish would not improve viability of retail and leisure in Bedford Borough. People would go to St. Neots.”

We still feel that this is a fair reflection that the issues and options consultation was flawed because it led people to believe that our rural parish was urban with underutilised or brownfield land which is very far from the case.
In addition, the issues and options consultation was conducted during the covid pandemic when it was not possible to meet more than 6 people outside. We believe this was reflected in the responses: Number of respondents = 315
 222 were from within the borough – out of a total estimated population of 174,687. This is a pitiful 0.12% response rate
 93 were from outside the Borough or did not give a postcode
 53% were from individuals.
Top areas for numbers of responses:
 Bedford 46
 Sharnbrook 23
 Staploe 18 (a 6% response rate which was 50 times the Borough average)
By contrast – no other areas were in double figures. This brings into further question the validity of the consultation. We believe Bedford Borough Council should be arguing for an extension of time such that the Local Plan 2030 remains “in date” for another year to enable proper consultation, to allow the East West rail route to be announced and for the Oxford Cambridge Arc to decide about development corporations.

Object

Local Plan 2040 Draft Plan - Strategy options and draft policies consultation

Representation ID: 6446

Received: 13/09/2021

Respondent: Ms Donna Thompson

Representation Summary:

Staploe Parish Council did not agree that this consultation was sound or fair. We responded to question 4 as follows: “Staploe Parish Council object in the strongest terms to the suggestion in the brown option that our parish is a brownfield site or under utilised land. Our whole parish is classed as open countryside for planning purposes. Our three tiny hamlets are not even classed as a small settlement in the Local Plan 2030 definition (6.21) and we are therefore defined as open countryside. We feel that describing the brown option which would see the majority of our parish covered in a large scale, high density, urban development as using brownfield or under utilised land is very misleading. We believe this could compromise the validity of the consultation as those responding would logically propose development on brownfield or under-utilised land over greenfield sites.

We believe the pros and cons list for the brown option is very inaccurate for our parish. A large development in Staploe parish would not support services etc in Bedford – we are 13 miles away and people would use services in St. Neots which are already under pressure due to large scale development on the eastern side of the town. There would be very little potential for residents here to make sustainable travel choices – we have one bus on Thursday and it would require huge investment to improve public transport. This would not reduce the need for growth in rural areas – we are a rural area and it proposes building all over our parish. Development in our parish would not improve viability of retail and leisure in Bedford Borough. People would go to St. Neots.”

We still feel that this is a fair reflection that the issues and options consultation was flawed because it led people to believe that our rural parish was urban with underutilised or brownfield land which is very far from the case.

In addition, the issues and options consultation was conducted during the covid pandemic when it was not possible to meet more than 6 people outside. We believe this was reflected in the responses: Number of respondents = 315
• 222 were from within the borough – out of a total estimated population of 174,687. This is a pitiful 0.12% response rate
• 93 were from outside the Borough or did not give a postcode
• 53% were from individuals.

Top areas for numbers of responses:
• Bedford 46
• Sharnbrook 23
• Staploe 18 (a 6% response rate which was 50 times the Borough average)
By contrast – no other areas were in double figures. This brings into further question the validity of the consultation. We believe Bedford Borough Council should be arguing for an extension of time such that the Local Plan 2030 remains “in date” for another year to enable proper consultation, to allow the East West rail route to be announced and for the Oxford Cambridge Arc to decide about development corporations.

Object

Local Plan 2040 Draft Plan - Strategy options and draft policies consultation

Representation ID: 6465

Received: 13/09/2021

Respondent: Mr Steven Kent

Representation Summary:

I did not agree that this consultation was sound or fair. I agree with Staploe Parish Council who responded to question 4 as follows: “Staploe Parish Council object in the strongest terms to the suggestion in the brown option that our parish is a brownfield site or under utilised land. Our whole parish is classed as open countryside for planning purposes. Our three tiny hamlets are not even classed as a small settlement in the Local Plan 2030 definition (6.21) and we are therefore defined as open countryside. We feel that describing the brown option which would see the majority of our parish covered in a large scale, high density, urban development as using brownfield or under utilised land is very misleading. We believe this could compromise the validity of the consultation as those responding would logically propose development on brownfield or under-utilised land over greenfield sites.
We believe the pros and cons list for the brown option is very inaccurate for our parish. A large development in Staploe parish would not support services etc in Bedford – we are 13 miles away and people would use services in St. Neots which are already under pressure due to large scale development on the eastern side of the town. There would be very little potential for residents here to make sustainable travel choices – we have one bus on Thursday and it would require huge investment to improve public transport. This would not reduce the need for growth in rural areas – we are a rural area and it proposes building all over our parish. Development in our parish would not improve viability of retail and leisure in Bedford Borough. People would go to St. Neots.”
We still feel that this is a fair reflection that the issues and options consultation was flawed because it led people to believe that our rural parish was urban with underutilised or brownfield land which is very far from the case.
In addition, the issues and options consultation was conducted during the covid pandemic when it was not possible to meet more than 6 people outside. We believe this was reflected in the responses: Number of respondents = 315

• 222 were from within the borough – out of a total estimated population of 174,687. This is a pitiful 0.12% response rate
• 93 were from outside the Borough or did not give a postcode
• 53% were from individuals.
Top areas for numbers of responses:
• Bedford 46
• Sharnbrook 23
• Staploe 18 (a 6% response rate which was 50 times the Borough average)
By contrast – no other areas were in double figures. This brings into further question the validity of the consultation. We believe Bedford Borough Council should be arguing for an extension of time such that the Local Plan 2030 remains “in date” for another year to enable proper consultation, to allow the East West rail route to be announced and for the Oxford Cambridge Arc to decide about development corporations.

Object

Local Plan 2040 Draft Plan - Strategy options and draft policies consultation

Representation ID: 6546

Received: 13/09/2021

Respondent: Mrs Susan Trolley

Representation Summary:

Staploe Parish Council did not agree that this consultation was sound or fair. We responded to question 4 as follows: “Staploe Parish Council object in the strongest terms to the suggestion in the brown option that our parish is a brownfield site or under utilised land. Our whole parish is classed as open countryside for planning purposes. Our three tiny hamlets are not even classed as a small settlement in the Local Plan 2030 definition (6.21) and we are therefore defined as open countryside. We feel that describing the brown option which would see the majority of our parish covered in a large scale, high density, urban development as using brownfield or under utilised land is very misleading. We believe this could compromise the validity of the consultation as those responding would logically propose development on brownfield or under-utilised land over greenfield sites.

We believe the pros and cons list for the brown option is very inaccurate for our parish. A large development in Staploe parish would not support services etc in Bedford – we are 13 miles away and people would use services in St. Neots which are already under pressure due to large scale development on the eastern side of the town. There would be very little potential for residents here to make sustainable travel choices – we have one bus on Thursday and it would require huge investment to improve public transport. This would not reduce the need for growth in rural areas – we are a rural area and it proposes building all over our parish. Development in our parish would not improve viability of retail and leisure in Bedford Borough. People would go to St. Neots.”

We still feel that this is a fair reflection that the issues and options consultation was flawed because it led people to believe that our rural parish was urban with underutilised or brownfield land which is very far from the case.

In addition, the issues and options consultation was conducted during the covid pandemic when it was not possible to meet more than 6 people outside. We believe this was reflected in the responses: Number of respondents = 315
• 222 were from within the borough – out of a total estimated population of 174,687. This is a pitiful 0.12% response rate
• 93 were from outside the Borough or did not give a postcode
• 53% were from individuals.

Top areas for numbers of responses:
• Bedford 46
• Sharnbrook 23
• Staploe 18 (a 6% response rate which was 50 times the Borough average)
By contrast – no other areas were in double figures. This brings into further question the validity of the consultation. We believe Bedford Borough Council should be arguing for an extension of time such that the Local Plan 2030 remains “in date” for another year to enable proper consultation, to allow the East West rail route to be announced and for the Oxford Cambridge Arc to decide about development corporations.

Object

Local Plan 2040 Draft Plan - Strategy options and draft policies consultation

Representation ID: 6604

Received: 14/09/2021

Respondent: Mr Aiden Farmer

Representation Summary:

I did not agree that this consultation was sound or fair. I agree with Staploe Parish Council who responded to question 4 as follows: “Staploe Parish Council object in the strongest terms to the suggestion in the brown option that our parish is a brownfield site or under utilised land. Our whole parish is classed as open countryside for planning purposes. Our three tiny hamlets are not even classed as a small settlement in the Local Plan 2030 definition (6.21) and we are therefore defined as open countryside. We feel that describing the brown option which would see the majority of our parish covered in a large scale, high density, urban development as using brownfield or under utilised land is very misleading. We believe this could compromise the validity of the consultation as those responding would logically propose development on brownfield or under-utilised land over greenfield sites.

We believe the pros and cons list for the brown option is very inaccurate for our parish. A large development in Staploe parish would not support services etc in Bedford – we are 13 miles away and people would use services in St. Neots which are already under pressure due to large scale development on the eastern side of the town. There would be very little potential for residents here to make sustainable travel choices – we have one bus on Thursday and it would require huge investment to improve public transport. This would not reduce the need for growth in rural areas – we are a rural area and it proposes building all over our parish. Development in our parish would not improve viability of retail and leisure in Bedford Borough. People would go to St. Neots.”

We still feel that this is a fair reflection that the issues and options consultation was flawed because it led people to believe that our rural parish was urban with underutilised or brownfield land which is very far from the case.

In addition, the issues and options consultation was conducted during the covid pandemic when it was not possible to meet more than 6 people outside. We believe this was reflected in the responses: Number of respondents = 315
• 222 were from within the borough – out of a total estimated population of 174,687. This is a pitiful 0.12% response rate
• 93 were from outside the Borough or did not give a postcode
• 53% were from individuals.

Top areas for numbers of responses:
• Bedford 46
• Sharnbrook 23
• Staploe 18 (a 6% response rate which was 50 times the Borough average)
By contrast – no other areas were in double figures. This brings into further question the validity of the consultation. We believe Bedford Borough Council should be arguing for an extension of time such that the Local Plan 2030 remains “in date” for another year to enable proper consultation, to allow the East West rail route to be announced and for the Oxford Cambridge Arc to decide about development corporations.

3.11 100 word summary
I believe that the Issues and Options consultation was invalid. It represented growth in our parish as “urban growth” showing our whole parish as brown – urban land on brownfield or under utilised land. This is profoundly untrue. Our parish is entirely rural and classed as open countryside and is all utilised as high quality agricultural land (grade 2).
We would also call into question the effectiveness of the issues and options consultation as only 0.12% of the population responded.
A rail based growth strategy policy may be required if growth is to be located around rail.

Object

Local Plan 2040 Draft Plan - Strategy options and draft policies consultation

Representation ID: 6726

Received: 14/09/2021

Respondent: Mrs Elizabeth Froude

Representation Summary:

I did not agree that this consultation was sound or fair. I agree with Staploe Parish Council who responded to question 4 as follows: “Staploe Parish Council object in the strongest terms to the suggestion in the brown option that our parish is a brownfield site or under utilised land. Our whole parish is classed as open countryside for planning purposes. Our three tiny hamlets are not even classed as a small settlement in the Local Plan 2030 definition (6.21) and we are therefore defined as open countryside. We feel that describing the brown option which would see the majority of our parish covered in a large scale, high density, urban development as using brownfield or under utilised land is very misleading. We believe this could compromise the validity of the consultation as those responding would logically propose development on brownfield or under-utilised land over greenfield sites.

We believe the pros and cons list for the brown option is very inaccurate for our parish. A large development in Staploe parish would not support services etc in Bedford – we are 13 miles away and people would use services in St. Neots which are already under pressure due to large scale development on the eastern side of the town. There would be very little potential for residents here to make sustainable travel choices – we have one bus on Thursday and it would require huge investment to improve public transport. This would not reduce the need for growth in rural areas – we are a rural area and it proposes building all over our parish. Development in our parish would not improve viability of retail and leisure in Bedford Borough. People would go to St. Neots.”

We still feel that this is a fair reflection that the issues and options consultation was flawed because it led people to believe that our rural parish was urban with underutilised or brownfield land which is very far from the case.

In addition, the issues and options consultation was conducted during the covid pandemic when it was not possible to meet more than 6 people outside. We believe this was reflected in the responses: Number of respondents = 315
• 222 were from within the borough – out of a total estimated population of 174,687. This is a pitiful 0.12% response rate
• 93 were from outside the Borough or did not give a postcode
• 53% were from individuals.

Top areas for numbers of responses:
• Bedford 46
• Sharnbrook 23
• Staploe 18 (a 6% response rate which was 50 times the Borough average)
By contrast – no other areas were in double figures. This brings into further question the validity of the consultation. We believe Bedford Borough Council should be arguing for an extension of time such that the Local Plan 2030 remains “in date” for another year to enable proper consultation, to allow the East West rail route to be announced and for the Oxford Cambridge Arc to decide about development corporations.

Object

Local Plan 2040 Draft Plan - Strategy options and draft policies consultation

Representation ID: 6764

Received: 14/09/2021

Respondent: Ms S Kelly

Representation Summary:

I did not agree that this consultation was sound or fair. I agree with Staploe Parish Council who responded to question 4 as follows: “Staploe Parish Council object in the strongest terms to the suggestion in the brown option that our parish is a brownfield site or under utilised land. Our whole parish is classed as open countryside for planning purposes. Our three tiny hamlets are not even classed as a small settlement in the Local Plan 2030 definition (6.21) and we are therefore defined as open countryside. We feel that describing the brown option which would see the majority of our parish covered in a large scale, high density, urban development as using brownfield or under utilised land is very misleading. We believe this could compromise the validity of the consultation as those responding would logically propose development on brownfield or under-utilised land over greenfield sites.

We believe the pros and cons list for the brown option is very inaccurate for our parish. A large development in Staploe parish would not support services etc in Bedford – we are 13 miles away and people would use services in St. Neots which are already under pressure due to large scale development on the eastern side of the town. There would be very little potential for residents here to make sustainable travel choices – we have one bus on Thursday and it would require huge investment to improve public transport. This would not reduce the need for growth in rural areas – we are a rural area and it proposes building all over our parish. Development in our parish would not improve viability of retail and leisure in Bedford Borough. People would go to St. Neots.”

We still feel that this is a fair reflection that the issues and options consultation was flawed because it led people to believe that our rural parish was urban with underutilised or brownfield land which is very far from the case.

In addition, the issues and options consultation was conducted during the covid pandemic when it was not possible to meet more than 6 people outside. We believe this was reflected in the responses: Number of respondents = 315
• 222 were from within the borough – out of a total estimated population of 174,687. This is a pitiful 0.12% response rate
• 93 were from outside the Borough or did not give a postcode
• 53% were from individuals.

Top areas for numbers of responses:
• Bedford 46
• Sharnbrook 23
• Staploe 18 (a 6% response rate which was 50 times the Borough average)
By contrast – no other areas were in double figures. This brings into further question the validity of the consultation. We believe Bedford Borough Council should be arguing for an extension of time such that the Local Plan 2030 remains “in date” for another year to enable proper consultation, to allow the East West rail route to be announced and for the Oxford Cambridge Arc to decide about development corporations.

Object

Local Plan 2040 Draft Plan - Strategy options and draft policies consultation

Representation ID: 6816

Received: 15/09/2021

Respondent: Mr Damian Smith

Representation Summary:

I did not agree that this consultation was sound or fair. I agree with Staploe Parish Council who responded to question 4 as follows: “Staploe Parish Council object in the strongest terms to the suggestion in the brown option that our parish is a brownfield site or under utilised land. Our whole parish is classed as open countryside for planning purposes. Our three tiny hamlets are not even classed as a small settlement in the Local Plan 2030 definition (6.21) and we are therefore defined as open countryside. We feel that describing the brown option which would see the majority of our parish covered in a large scale, high density, urban development as using brownfield or under utilised land is very misleading. We believe this could compromise the validity of the consultation as those responding would logically propose development on brownfield or under-utilised land over greenfield sites.

We believe the pros and cons list for the brown option is very inaccurate for our parish. A large development in Staploe parish would not support services etc in Bedford – we are 13 miles away and people would use services in St. Neots which are already under pressure due to large scale development on the eastern side of the town. There would be very little potential for residents here to make sustainable travel choices – we have one bus on Thursday and it would require huge investment to improve public transport. This would not reduce the need for growth in rural areas – we are a rural area and it proposes building all over our parish. Development in our parish would not improve viability of retail and leisure in Bedford Borough. People would go to St. Neots.”

We still feel that this is a fair reflection that the issues and options consultation was flawed because it led people to believe that our rural parish was urban with underutilised or brownfield land which is very far from the case.

In addition, the issues and options consultation was conducted during the covid pandemic when it was not possible to meet more than 6 people outside. We believe this was reflected in the responses: Number of respondents = 315
• 222 were from within the borough – out of a total estimated population of 174,687. This is a pitiful 0.12% response rate
• 93 were from outside the Borough or did not give a postcode
• 53% were from individuals.

Top areas for numbers of responses:
• Bedford 46
• Sharnbrook 23
• Staploe 18 (a 6% response rate which was 50 times the Borough average)
By contrast – no other areas were in double figures. This brings into further question the validity of the consultation. We believe Bedford Borough Council should be arguing for an extension of time such that the Local Plan 2030 remains “in date” for another year to enable proper consultation, to allow the East West rail route to be announced and for the Oxford Cambridge Arc to decide about development corporations.

Object

Local Plan 2040 Draft Plan - Strategy options and draft policies consultation

Representation ID: 6864

Received: 13/09/2021

Respondent: Mrs Joanna Ibbett

Representation Summary:

I did not agree that this consultation was sound or fair. Out parish council responded to question 4 as follows: “Staploe Parish Council object in the strongest terms to the suggestion in the brown option that our parish is a brownfield site or under utilised land. Our whole parish is classed as open countryside for planning purposes. Our three tiny hamlets are not even classed as a small settlement in the Local Plan 2030 definition (6.21) and we are therefore defined as open countryside. I feel that describing the brown option which would see the majority of our parish covered in a large scale, high density, urban development as using brownfield or under utilised land is very misleading. I believe this could compromise the validity of the consultation as those responding would logically propose development on brownfield or under-utilised land over greenfield sites.

I believe the pros and cons list for the brown option is very inaccurate for our parish. A large development in Staploe parish would not support services etc in Bedford – we are 13 miles away and people would use services in St. Neots which are already under pressure due to large scale development on the eastern side of the town. There would be very little potential for residents here to make sustainable travel choices – we have one bus on Thursday and it would require huge investment to improve public transport. This would not reduce the need for growth in rural areas – we are a rural area and it proposes building all over our parish. Development in our parish would not improve viability of retail and leisure in Bedford Borough. People would go to St. Neots.”

I still feel that this is a fair reflection that the issues and options consultation was flawed because it led people to believe that our rural parish was urban with underutilised or brownfield land which is very far from the case.

In addition, the issues and options consultation was conducted during the covid pandemic when it was not possible to meet more than 6 people outside. We believe this was reflected in the responses: Number of respondents = 315
• 222 were from within the borough – out of a total estimated population of 174,687. This is a pitiful 0.12% response rate
• 93 were from outside the Borough or did not give a postcode
• 53% were from individuals.

Top areas for numbers of responses:
• Bedford 46
• Sharnbrook 23
• Staploe 18 (a 6% response rate which was 50 times the Borough average)
By contrast – no other areas were in double figures. This brings into further question the validity of the consultation.

Object

Local Plan 2040 Draft Plan - Strategy options and draft policies consultation

Representation ID: 6903

Received: 15/09/2021

Respondent: Master Corey T Farmer

Representation Summary:

I did not agree that this consultation was sound or fair. I agree with Staploe Parish Council who responded to question 4 as follows: “Staploe Parish Council object in the strongest terms to the suggestion in the brown option that our parish is a brownfield site or under utilised land. Our whole parish is classed as open countryside for planning purposes. Our three tiny hamlets are not even classed as a small settlement in the Local Plan 2030 definition (6.21) and we are therefore defined as open countryside. We feel that describing the brown option which would see the majority of our parish covered in a large scale, high density, urban development as using brownfield or under utilised land is very misleading. We believe this could compromise the validity of the consultation as those responding would logically propose development on brownfield or under-utilised land over greenfield sites.

We believe the pros and cons list for the brown option is very inaccurate for our parish. A large development in Staploe parish would not support services etc in Bedford – we are 13 miles away and people would use services in St. Neots which are already under pressure due to large scale development on the eastern side of the town. There would be very little potential for residents here to make sustainable travel choices – we have one bus on Thursday and it would require huge investment to improve public transport. This would not reduce the need for growth in rural areas – we are a rural area and it proposes building all over our parish. Development in our parish would not improve viability of retail and leisure in Bedford Borough. People would go to St. Neots.”

We still feel that this is a fair reflection that the issues and options consultation was flawed because it led people to believe that our rural parish was urban with underutilised or brownfield land which is very far from the case.

In addition, the issues and options consultation was conducted during the covid pandemic when it was not possible to meet more than 6 people outside. We believe this was reflected in the responses: Number of respondents = 315
• 222 were from within the borough – out of a total estimated population of 174,687. This is a pitiful 0.12% response rate
• 93 were from outside the Borough or did not give a postcode
• 53% were from individuals.

Top areas for numbers of responses:
• Bedford 46
• Sharnbrook 23
• Staploe 18 (a 6% response rate which was 50 times the Borough average)
By contrast – no other areas were in double figures. This brings into further question the validity of the consultation. We believe Bedford Borough Council should be arguing for an extension of time such that the Local Plan 2030 remains “in date” for another year to enable proper consultation, to allow the East West rail route to be announced and for the Oxford Cambridge Arc to decide about development corporations.

Support

Local Plan 2040 Draft Plan - Strategy options and draft policies consultation

Representation ID: 6995

Received: 16/09/2021

Respondent: Mr Robert Tusting

Representation Summary:

Staploe Parish Council did not agree that this consultation was sound or fair. We responded to question 4 as follows: “Staploe Parish Council object in the strongest terms to the suggestion in the brown option that our parish is a brownfield site or under utilised land. Our whole parish is classed as open countryside for planning purposes. Our three tiny hamlets are not even classed as a small settlement in the Local Plan 2030 definition (6.21) and we are therefore defined as open countryside. We feel that describing the brown option which would see the majority of our parish covered in a large scale, high density, urban development as using brownfield or under utilised land is very misleading. We believe this could compromise the validity of the consultation as those responding would logically propose development on brownfield or under-utilised land over greenfield sites.

We believe the pros and cons list for the brown option is very inaccurate for our parish. A large development in Staploe parish would not support services etc in Bedford – we are 13 miles away and people would use services in St. Neots which are already under pressure due to large scale development on the eastern side of the town. There would be very little potential for residents here to make sustainable travel choices – we have one bus on Thursday and it would require huge investment to improve public transport. This would not reduce the need for growth in rural areas – we are a rural area and it proposes building all over our parish. Development in our parish would not improve viability of retail and leisure in Bedford Borough. People would go to St. Neots.”

We still feel that this is a fair reflection that the issues and options consultation was flawed because it led people to believe that our rural parish was urban with underutilised or brownfield land which is very far from the case.

In addition, the issues and options consultation was conducted during the covid pandemic when it was not possible to meet more than 6 people outside. We believe this was reflected in the responses: Number of respondents = 315
• 222 were from within the borough – out of a total estimated population of 174,687. This is a pitiful 0.12% response rate
• 93 were from outside the Borough or did not give a postcode
• 53% were from individuals.

Top areas for numbers of responses:
• Bedford 46
• Sharnbrook 23
• Staploe 18 (a 6% response rate which was 50 times the Borough average)
By contrast – no other areas were in double figures. This brings into further question the validity of the consultation. We believe Bedford Borough Council should be arguing for an extension of time such that the Local Plan 2030 remains “in date” for another year to enable proper consultation, to allow the East West rail route to be announced and for the Oxford Cambridge Arc to decide about development corporations.

Object

Local Plan 2040 Draft Plan - Strategy options and draft policies consultation

Representation ID: 7035

Received: 17/09/2021

Respondent: Mr Robert Tusting

Representation Summary:

Staploe Parish Council did not agree that this consultation was sound or fair. We responded to question 4 as follows: “Staploe Parish Council object in the strongest terms to the suggestion in the brown option that our parish is a brownfield site or under utilised land. Our whole parish is classed as open countryside for planning purposes. Our three tiny hamlets are not even classed as a small settlement in the Local Plan 2030 definition (6.21) and we are therefore defined as open countryside. We feel that describing the brown option which would see the majority of our parish covered in a large scale, high density, urban development as using brownfield or under utilised land is very misleading. We believe this could compromise the validity of the consultation as those responding would logically propose development on brownfield or under-utilised land over greenfield sites.

We believe the pros and cons list for the brown option is very inaccurate for our parish. A large development in Staploe parish would not support services etc in Bedford – we are 13 miles away and people would use services in St. Neots which are already under pressure due to large scale development on the eastern side of the town. There would be very little potential for residents here to make sustainable travel choices – we have one bus on Thursday and it would require huge investment to improve public transport. This would not reduce the need for growth in rural areas – we are a rural area and it proposes building all over our parish. Development in our parish would not improve viability of retail and leisure in Bedford Borough. People would go to St. Neots.”

We still feel that this is a fair reflection that the issues and options consultation was flawed because it led people to believe that our rural parish was urban with underutilised or brownfield land which is very far from the case.

In addition, the issues and options consultation was conducted during the covid pandemic when it was not possible to meet more than 6 people outside. We believe this was reflected in the responses: Number of respondents = 315
• 222 were from within the borough – out of a total estimated population of 174,687. This is a pitiful 0.12% response rate
• 93 were from outside the Borough or did not give a postcode
• 53% were from individuals.

Top areas for numbers of responses:
• Bedford 46
• Sharnbrook 23
• Staploe 18 (a 6% response rate which was 50 times the Borough average)
By contrast – no other areas were in double figures. This brings into further question the validity of the consultation. We believe Bedford Borough Council should be arguing for an extension of time such that the Local Plan 2030 remains “in date” for another year to enable proper consultation, to allow the East West rail route to be announced and for the Oxford Cambridge Arc to decide about development corporations.

Object

Local Plan 2040 Draft Plan - Strategy options and draft policies consultation

Representation ID: 7084

Received: 09/09/2021

Respondent: June Coles

Representation Summary:

Staploe Parish Council did not agree that this consultation was sound or fair. We responded to question 4 as follows: “Staploe Parish Council object in the strongest terms to the suggestion in the brown option that our parish is a brownfield site or under utilised land. Our whole parish is classed as open countryside for planning purposes. Our three tiny hamlets are not even classed as a small settlement in the Local Plan 2030 definition (6.21) and we are therefore defined as open countryside. We feel that describing the brown option which would see the majority of our parish covered in a large scale, high density, urban development as using brownfield or under utilised land is very misleading. We believe this could compromise the validity of the consultation as those responding would logically propose development on brownfield or under-utilised land over greenfield sites.

We believe the pros and cons list for the brown option is very inaccurate for our parish. A large development in Staploe parish would not support services etc in Bedford – we are 13 miles away and people would use services in St. Neots which are already under pressure due to large scale development on the eastern side of the town. There would be very little potential for residents here to make sustainable travel choices – we have one bus on Thursday and it would require huge investment to improve public transport. This would not reduce the need for growth in rural areas – we are a rural area and it proposes building all over our parish. Development in our parish would not improve viability of retail and leisure in Bedford Borough. People would go to St. Neots.”

We still feel that this is a fair reflection that the issues and options consultation was flawed because it led people to believe that our rural parish was urban with underutilised or brownfield land which is very far from the case.

In addition, the issues and options consultation was conducted during the covid pandemic when it was not possible to meet more than 6 people outside. We believe this was reflected in the responses: Number of respondents = 315
• 222 were from within the borough – out of a total estimated population of 174,687. This is a pitiful 0.12% response rate
• 93 were from outside the Borough or did not give a postcode
• 53% were from individuals.

Top areas for numbers of responses:
• Bedford 46
• Sharnbrook 23
• Staploe 18 (a 6% response rate which was 50 times the Borough average)
By contrast – no other areas were in double figures. This brings into further question the validity of the consultation. We believe Bedford Borough Council should be arguing for an extension of time such that the Local Plan 2030 remains “in date” for another year to enable proper consultation, to allow the East West rail route to be announced and for the Oxford Cambridge Arc to decide about development corporations.

Object

Local Plan 2040 Draft Plan - Strategy options and draft policies consultation

Representation ID: 7131

Received: 09/09/2021

Respondent: Stephen Coles

Representation Summary:

Staploe Parish Council did not agree that this consultation was sound or fair. We responded to question 4 as follows: “Staploe Parish Council object in the strongest terms to the suggestion in the brown option that our parish is a brownfield site or under utilised land. Our whole parish is classed as open countryside for planning purposes. Our three tiny hamlets are not even classed as a small settlement in the Local Plan 2030 definition (6.21) and we are therefore defined as open countryside. We feel that describing the brown option which would see the majority of our parish covered in a large scale, high density, urban development as using brownfield or under utilised land is very misleading. We believe this could compromise the validity of the consultation as those responding would logically propose development on brownfield or under-utilised land over greenfield sites.

We believe the pros and cons list for the brown option is very inaccurate for our parish. A large development in Staploe parish would not support services etc in Bedford – we are 13 miles away and people would use services in St. Neots which are already under pressure due to large scale development on the eastern side of the town. There would be very little potential for residents here to make sustainable travel choices – we have one bus on Thursday and it would require huge investment to improve public transport. This would not reduce the need for growth in rural areas – we are a rural area and it proposes building all over our parish. Development in our parish would not improve viability of retail and leisure in Bedford Borough. People would go to St. Neots.”

We still feel that this is a fair reflection that the issues and options consultation was flawed because it led people to believe that our rural parish was urban with underutilised or brownfield land which is very far from the case.

In addition, the issues and options consultation was conducted during the covid pandemic when it was not possible to meet more than 6 people outside. We believe this was reflected in the responses: Number of respondents = 315
• 222 were from within the borough – out of a total estimated population of 174,687. This is a pitiful 0.12% response rate
• 93 were from outside the Borough or did not give a postcode
• 53% were from individuals.

Top areas for numbers of responses:
• Bedford 46
• Sharnbrook 23
• Staploe 18 (a 6% response rate which was 50 times the Borough average)
By contrast – no other areas were in double figures. This brings into further question the validity of the consultation. We believe Bedford Borough Council should be arguing for an extension of time such that the Local Plan 2030 remains “in date” for another year to enable proper consultation, to allow the East West rail route to be announced and for the Oxford Cambridge Arc to decide about development corporations.

Object

Local Plan 2040 Draft Plan - Strategy options and draft policies consultation

Representation ID: 7211

Received: 17/09/2021

Respondent: Mr Peter Knight

Representation Summary:

I did not agree that this consultation was sound or fair. I agree with Staploe Parish Council who responded to question 4 as follows: “Staploe Parish Council object in the strongest terms to the suggestion in the brown option that our parish is a brownfield site or under utilised land. Our whole parish is classed as open countryside for planning purposes. Our three tiny hamlets are not even classed as a small settlement in the Local Plan 2030 definition (6.21) and we are therefore defined as open countryside. We feel that describing the brown option which would see the majority of our parish covered in a large scale, high density, urban development as using brownfield or under utilised land is very misleading. We believe this could compromise the validity of the consultation as those responding would logically propose development on brownfield or under-utilised land over greenfield sites.

We believe the pros and cons list for the brown option is very inaccurate for our parish. A large development in Staploe parish would not support services etc in Bedford – we are 13 miles away and people would use services in St. Neots which are already under pressure due to large scale development on the eastern side of the town. There would be very little potential for residents here to make sustainable travel choices – we have one bus on Thursday and it would require huge investment to improve public transport. This would not reduce the need for growth in rural areas – we are a rural area and it proposes building all over our parish. Development in our parish would not improve viability of retail and leisure in Bedford Borough. People would go to St. Neots.”

We still feel that this is a fair reflection that the issues and options consultation was flawed because it led people to believe that our rural parish was urban with underutilised or brownfield land which is very far from the case.

In addition, the issues and options consultation was conducted during the covid pandemic when it was not possible to meet more than 6 people outside. We believe this was reflected in the responses: Number of respondents = 315
• 222 were from within the borough – out of a total estimated population of 174,687. This is a pitiful 0.12% response rate
• 93 were from outside the Borough or did not give a postcode
• 53% were from individuals.

Top areas for numbers of responses:
• Bedford 46
• Sharnbrook 23
• Staploe 18 (a 6% response rate which was 50 times the Borough average)
By contrast – no other areas were in double figures. This brings into further question the validity of the consultation. We believe Bedford Borough Council should be arguing for an extension of time such that the Local Plan 2030 remains “in date” for another year to enable proper consultation, to allow the East West rail route to be announced and for the Oxford Cambridge Arc to decide about development corporations.

Object

Local Plan 2040 Draft Plan - Strategy options and draft policies consultation

Representation ID: 7296

Received: 01/09/2021

Respondent: Miss Laura Jones

Representation Summary:

I did not agree that this consultation was sound or fair. I agree with Staploe Parish Council who responded to question 4 as follows: “Staploe Parish Council object in the strongest terms to the suggestion in the brown option that our parish is a brownfield site or under utilised land. Our whole parish is classed as open countryside for planning purposes. Our three tiny hamlets are not even classed as a small settlement in the Local Plan 2030 definition (6.21) and we are therefore defined as open countryside. We feel that describing the brown option which would see the majority of our parish covered in a large scale, high density, urban development as using brownfield or under utilised land is very misleading. We believe this could compromise the validity of the consultation as those responding would logically propose development on brownfield or under-utilised land over greenfield sites.

We believe the pros and cons list for the brown option is very inaccurate for our parish. A large development in Staploe parish would not support services etc in Bedford – we are 13 miles away and people would use services in St. Neots which are already under pressure due to large scale development on the eastern side of the town. There would be very little potential for residents here to make sustainable travel choices – we have one bus on Thursday and it would require huge investment to improve public transport. This would not reduce the need for growth in rural areas – we are a rural area and it proposes building all over our parish. Development in our parish would not improve viability of retail and leisure in Bedford Borough. People would go to St. Neots.”

We still feel that this is a fair reflection that the issues and options consultation was flawed because it led people to believe that our rural parish was urban with underutilised or brownfield land which is very far from the case.

In addition, the issues and options consultation was conducted during the covid pandemic when it was not possible to meet more than 6 people outside. We believe this was reflected in the responses: Number of respondents = 315
• 222 were from within the borough – out of a total estimated population of 174,687. This is a pitiful 0.12% response rate
• 93 were from outside the Borough or did not give a postcode
• 53% were from individuals.

Top areas for numbers of responses:
• Bedford 46
• Sharnbrook 23
• Staploe 18 (a 6% response rate which was 50 times the Borough average)
By contrast – no other areas were in double figures. This brings into further question the validity of the consultation. We believe Bedford Borough Council should be arguing for an extension of time such that the Local Plan 2030 remains “in date” for another year to enable proper consultation, to allow the East West rail route to be announced and for the Oxford Cambridge Arc to decide about development corporations.

3.11 100 word summary
I believe that the Issues and Options consultation was invalid. It represented growth in our parish as “urban growth” showing our whole parish as brown – urban land on brownfield or under utilised land. This is profoundly untrue. Our parish is entirely rural and classed as open countryside and is all utilised as high quality agricultural land (grade 2).
We would also call into question the effectiveness of the issues and options consultation as only 0.12% of the population responded.
A rail based growth strategy policy may be required if growth is to be located around rail.

Object

Local Plan 2040 Draft Plan - Strategy options and draft policies consultation

Representation ID: 7510

Received: 03/09/2021

Respondent: Mr Jonathan Hambleton

Representation Summary:

I did not agree that this consultation was sound or fair. I agree with Staploe Parish Council who responded to question 4 as follows: “Staploe Parish Council object in the strongest terms to the suggestion in the brown option that our parish is a brownfield site or under utilised land. Our whole parish is classed as open countryside for planning purposes. Our three tiny hamlets are not even classed as a small settlement in the Local Plan 2030 definition (6.21) and we are therefore defined as open countryside. We feel that describing the brown option which would see the majority of our parish covered in a large scale, high density, urban development as using brownfield or under utilised land is very misleading. We believe this could compromise the validity of the consultation as those responding would logically propose development on brownfield or under-utilised land over greenfield sites.

We believe the pros and cons list for the brown option is very inaccurate for our parish. A large development in Staploe parish would not support services etc in Bedford – we are 13 miles away and people would use services in St. Neots which are already under pressure due to large scale development on the eastern side of the town. There would be very little potential for residents here to make sustainable travel choices – we have one bus on Thursday and it would require huge investment to improve public transport. This would not reduce the need for growth in rural areas – we are a rural area and it proposes building all over our parish. Development in our parish would not improve viability of retail and leisure in Bedford Borough. People would go to St. Neots.”

We still feel that this is a fair reflection that the issues and options consultation was flawed because it led people to believe that our rural parish was urban with underutilised or brownfield land which is very far from the case.

In addition, the issues and options consultation was conducted during the covid pandemic when it was not possible to meet more than 6 people outside. We believe this was reflected in the responses: Number of respondents = 315
• 222 were from within the borough – out of a total estimated population of 174,687. This is a pitiful 0.12% response rate
• 93 were from outside the Borough or did not give a postcode
• 53% were from individuals.

Top areas for numbers of responses:
• Bedford 46
• Sharnbrook 23
• Staploe 18 (a 6% response rate which was 50 times the Borough average)
By contrast – no other areas were in double figures. This brings into further question the validity of the consultation. We believe Bedford Borough Council should be arguing for an extension of time such that the Local Plan 2030 remains “in date” for another year to enable proper consultation, to allow the East West rail route to be announced and for the Oxford Cambridge Arc to decide about development corporations.

3.11 100 word summary
I believe that the Issues and Options consultation was invalid. It represented growth in our parish as “urban growth” showing our whole parish as brown – urban land on brownfield or under utilised land. This is profoundly untrue. Our parish is entirely rural and classed as open countryside and is all utilised as high quality agricultural land (grade 2).
We would also call into question the effectiveness of the issues and options consultation as only 0.12% of the population responded.
A rail based growth strategy policy may be required if growth is to be located around rail.

Object

Local Plan 2040 Draft Plan - Strategy options and draft policies consultation

Representation ID: 7615

Received: 01/09/2021

Respondent: Miss Nicola Tagg

Representation Summary:

I did not agree that this consultation was sound or fair. I agree with Staploe Parish Council who responded to question 4 as follows: “Staploe Parish Council object in the strongest terms to the suggestion in the brown option that our parish is a brownfield site or under utilised land. Our whole parish is classed as open countryside for planning purposes. Our three tiny hamlets are not even classed as a small settlement in the Local Plan 2030 definition (6.21) and we are therefore defined as open countryside. We feel that describing the brown option which would see the majority of our parish covered in a large scale, high density, urban development as using brownfield or under utilised land is very misleading. We believe this could compromise the validity of the consultation as those responding would logically propose development on brownfield or under-utilised land over greenfield sites.

I believe the pros and cons list for the brown option is very inaccurate for our parish. A large development in Staploe parish would not support services etc in Bedford – we are 13 miles away and people would use services in St. Neots which are already under pressure due to large scale development on the eastern side of the town. There would be very little potential for residents here to make sustainable travel choices – we have one bus on Thursday and it would require huge investment to improve public transport. This would not reduce the need for growth in rural areas – we are a rural area and it proposes building all over our parish. Development in our parish would not improve viability of retail and leisure in Bedford Borough. People would go to St. Neots.”

I still feel that this is a fair reflection that the issues and options consultation was flawed because it led people to believe that our rural parish was urban with underutilised or brownfield land which is very far from the case.

In addition, the issues and options consultation was conducted during the covid pandemic when it was not possible to meet more than 6 people outside. We believe this was reflected in the responses: Number of respondents = 315
• 222 were from within the borough – out of a total estimated population of 174,687. This is a pitiful 0.12% response rate
• 93 were from outside the Borough or did not give a postcode
• 53% were from individuals.

Top areas for numbers of responses:
• Bedford 46
• Sharnbrook 23
• Staploe 18 (a 6% response rate which was 50 times the Borough average)
By contrast – no other areas were in double figures. This brings into further question the validity of the consultation. We believe Bedford Borough Council should be arguing for an extension of time such that the Local Plan 2030 remains “in date” for another year to enable proper consultation, to allow the East West rail route to be announced and for the Oxford Cambridge Arc to decide about development corporations.

3.11 100 word summary
I believe that the Issues and Options consultation was invalid. It represented growth in our parish as “urban growth” showing our whole parish as brown – urban land on brownfield or under utilised land. This is profoundly untrue. Our parish is entirely rural and classed as open countryside and is all utilised as high quality agricultural land (grade 2).
We would also call into question the effectiveness of the issues and options consultation as only 0.12% of the population responded.
A rail based growth strategy policy may be required if growth is to be located around rail.

Object

Local Plan 2040 Draft Plan - Strategy options and draft policies consultation

Representation ID: 7662

Received: 01/09/2021

Respondent: Mr Simon Goodship

Representation Summary:

I did not agree that this consultation was sound or fair. I agree with Staploe Parish Council who responded to question 4 as follows: “Staploe Parish Council object in the strongest terms to the suggestion in the brown option that our parish is a brownfield site or under utilised land. Our whole parish is classed as open countryside for planning purposes. Our three tiny hamlets are not even classed as a small settlement in the Local Plan 2030 definition (6.21) and we are therefore defined as open countryside. We feel that describing the brown option which would see the majority of our parish covered in a large scale, high density, urban development as using brownfield or under utilised land is very misleading. We believe this could compromise the validity of the consultation as those responding would logically propose development on brownfield or under-utilised land over greenfield sites.

We believe the pros and cons list for the brown option is very inaccurate for our parish. A large development in Staploe parish would not support services etc in Bedford – we are 13 miles away and people would use services in St. Neots which are already under pressure due to large scale development on the eastern side of the town. There would be very little potential for residents here to make sustainable travel choices – we have one bus on Thursday and it would require huge investment to improve public transport. This would not reduce the need for growth in rural areas – we are a rural area and it proposes building all over our parish. Development in our parish would not improve viability of retail and leisure in Bedford Borough. People would go to St. Neots.”

We still feel that this is a fair reflection that the issues and options consultation was flawed because it led people to believe that our rural parish was urban with underutilised or brownfield land which is very far from the case.

In addition, the issues and options consultation was conducted during the covid pandemic when it was not possible to meet more than 6 people outside. We believe this was reflected in the responses: Number of respondents = 315
• 222 were from within the borough – out of a total estimated population of 174,687. This is a pitiful 0.12% response rate
• 93 were from outside the Borough or did not give a postcode
• 53% were from individuals.

Top areas for numbers of responses:
• Bedford 46
• Sharnbrook 23
• Staploe 18 (a 6% response rate which was 50 times the Borough average)
By contrast – no other areas were in double figures. This brings into further question the validity of the consultation. We believe Bedford Borough Council should be arguing for an extension of time such that the Local Plan 2030 remains “in date” for another year to enable proper consultation, to allow the East West rail route to be announced and for the Oxford Cambridge Arc to decide about development corporations.

3.11 100 word summary
I believe that the Issues and Options consultation was invalid. It represented growth in our parish as “urban growth” showing our whole parish as brown – urban land on brownfield or under utilised land. This is profoundly untrue. Our parish is entirely rural and classed as open countryside and is all utilised as high quality agricultural land (grade 2).
We would also call into question the effectiveness of the issues and options consultation as only 0.12% of the population responded.
A rail based growth strategy policy may be required if growth is to be located around rail.

Object

Local Plan 2040 Draft Plan - Strategy options and draft policies consultation

Representation ID: 7760

Received: 22/09/2021

Respondent: Mr Michael Thompson

Representation Summary:

Staploe Parish Council did not agree that this consultation was sound or fair. We responded to question 4 as follows: “Staploe Parish Council object in the strongest terms to the suggestion in the brown option that our parish is a brownfield site or under utilised land. Our whole parish is classed as open countryside for planning purposes. Our three tiny hamlets are not even classed as a small settlement in the Local Plan 2030 definition (6.21) and we are therefore defined as open countryside. We feel that describing the brown option which would see the majority of our parish covered in a large scale, high density, urban development as using brownfield or under utilised land is very misleading. We believe this could compromise the validity of the consultation as those responding would logically propose development on brownfield or under-utilised land over greenfield sites.

We believe the pros and cons list for the brown option is very inaccurate for our parish. A large development in Staploe parish would not support services etc in Bedford – we are 13 miles away and people would use services in St. Neots which are already under pressure due to large scale development on the eastern side of the town. There would be very little potential for residents here to make sustainable travel choices – we have one bus on Thursday and it would require huge investment to improve public transport. This would not reduce the need for growth in rural areas – we are a rural area and it proposes building all over our parish. Development in our parish would not improve viability of retail and leisure in Bedford Borough. People would go to St. Neots.”

We still feel that this is a fair reflection that the issues and options consultation was flawed because it led people to believe that our rural parish was urban with underutilised or brownfield land which is very far from the case.

In addition, the issues and options consultation was conducted during the covid pandemic when it was not possible to meet more than 6 people outside. We believe this was reflected in the responses: Number of respondents = 315
• 222 were from within the borough – out of a total estimated population of 174,687. This is a pitiful 0.12% response rate
• 93 were from outside the Borough or did not give a postcode
• 53% were from individuals.

Top areas for numbers of responses:
• Bedford 46
• Sharnbrook 23
• Staploe 18 (a 6% response rate which was 50 times the Borough average)
By contrast – no other areas were in double figures. This brings into further question the validity of the consultation. We believe Bedford Borough Council should be arguing for an extension of time such that the Local Plan 2030 remains “in date” for another year to enable proper consultation, to allow the East West rail route to be announced and for the Oxford Cambridge Arc to decide about development corporations.






3.11 100 word summary
Staploe Parish Council believe that the Issues and Options consultation was invalid. It represented growth in our parish as “urban growth” showing our whole parish as brown – urban land on brownfield or under utilised land. This is profoundly untrue. Our parish is entirely rural and classed as open countryside and is all utilised as high quality agricultural land (grade 2).
We would also call into question the effectiveness of the issues and options consultation as only 0.12% of the population responded.
A rail based growth strategy policy may be required if growth is to be located around rail.

Object

Local Plan 2040 Draft Plan - Strategy options and draft policies consultation

Representation ID: 7819

Received: 03/09/2021

Respondent: Mr Emilio Meola

Representation Summary:

I believe that the Issues and Options consultation was invalid. It represented growth in our parish as “urban growth” showing our whole parish as brown – urban land on brownfield or under utilised land. This is profoundly untrue. Our parish is entirely rural and classed as open countryside and is all utilised as high quality agricultural land (grade 2).

We would also call into question the effectiveness of the issues and options consultation as only 0.12% of the population responded.

A rail based growth strategy policy may be required if growth is to be located around rail.

Object

Local Plan 2040 Draft Plan - Strategy options and draft policies consultation

Representation ID: 7858

Received: 03/09/2021

Respondent: Mr Mark Ibbett

Representation Summary:

I do not agree that this consultation was sound or fair (see above). Our Parish Council responded to question 4 as follows: “Staploe Parish Council object in the strongest terms to the suggestion in the brown option that our parish is a brownfield site or under utilised land. Our whole parish is classed as open countryside for planning purposes. Our three tiny hamlets are not even classed as a small settlement in the Local Plan 2030 definition (6.21) and we are therefore defined as open countryside. I feel that describing the brown option which would see the majority of our parish covered in a large scale, high density, urban development as using brownfield or under utilised land is very misleading. I believe this could compromise the validity of the consultation as those responding would logically propose development on brownfield or under-utilised land over greenfield sites.

I believe the pros and cons list for the brown option is very inaccurate for our parish. A large development in Staploe parish would not support services etc in Bedford – we are 13 miles away and people would use services in St. Neots which are already under pressure due to large scale development on the eastern side of the town. There would be very little potential for residents here to make sustainable travel choices – we have one bus on Thursday and it would require huge investment to improve public transport. This would not reduce the need for growth in rural areas – we are a rural area and it proposes building all over our parish. Development in our parish would not improve viability of retail and leisure in Bedford Borough. People would go to St. Neots.”

I still feel that this is a fair reflection that the issues and options consultation was flawed because it led people to believe that our rural parish was urban with underutilised or brownfield land which is very far from the case.

In addition, the issues and options consultation was conducted during the covid pandemic when it was not possible to meet more than 6 people outside. I believe this was reflected in the responses: Number of respondents = 315
• 222 were from within the borough – out of a total estimated population of 174,687. This is a pitiful 0.12% response rate
• 93 were from outside the Borough or did not give a postcode
• 53% were from individuals.

Top areas for numbers of responses:
• Bedford 46
• Sharnbrook 23
• Staploe 18 (a 6% response rate which was 50 times the Borough average)
By contrast – no other areas were in double figures. This brings into further question the validity of the consultation.

Object

Local Plan 2040 Draft Plan - Strategy options and draft policies consultation

Representation ID: 7964

Received: 24/09/2021

Respondent: Ms Lorraine Jewell

Representation Summary:

I did not agree that this consultation was sound or fair. I agree with Staploe Parish Council who responded to question 4 as follows: “Staploe Parish Council object in the strongest terms to the suggestion in the brown option that our parish is a brownfield site or under utilised land. Our whole parish is classed as open countryside for planning purposes. Our three tiny hamlets are not even classed as a small settlement in the Local Plan 2030 definition (6.21) and we are therefore defined as open countryside. We feel that describing the brown option which would see the majority of our parish covered in a large scale, high density, urban development as using brownfield or under utilised land is very misleading. We believe this could compromise the validity of the consultation as those responding would logically propose development on brownfield or under-utilised land over greenfield sites.

We believe the pros and cons list for the brown option is very inaccurate for our parish. A large development in Staploe parish would not support services etc in Bedford – we are 13 miles away and people would use services in St. Neots which are already under pressure due to large scale development on the eastern side of the town. There would be very little potential for residents here to make sustainable travel choices – we have one bus on Thursday and it would require huge investment to improve public transport. This would not reduce the need for growth in rural areas – we are a rural area and it proposes building all over our parish. Development in our parish would not improve viability of retail and leisure in Bedford Borough. People would go to St. Neots.”

We still feel that this is a fair reflection that the issues and options consultation was flawed because it led people to believe that our rural parish was urban with underutilised or brownfield land which is very far from the case.

In addition, the issues and options consultation was conducted during the covid pandemic when it was not possible to meet more than 6 people outside. We believe this was reflected in the responses: Number of respondents = 315
• 222 were from within the borough – out of a total estimated population of 174,687. This is a pitiful 0.12% response rate
• 93 were from outside the Borough or did not give a postcode
• 53% were from individuals.

Top areas for numbers of responses:
• Bedford 46
• Sharnbrook 23
• Staploe 18 (a 6% response rate which was 50 times the Borough average)
By contrast – no other areas were in double figures. This brings into further question the validity of the consultation. We believe Bedford Borough Council should be arguing for an extension of time such that the Local Plan 2030 remains “in date” for another year to enable proper consultation, to allow the East West rail route to be announced and for the Oxford Cambridge Arc to decide about development corporations.

3.11 100 word summary
I believe that the Issues and Options consultation was invalid. It represented growth in our parish as “urban growth” showing our whole parish as brown – urban land on brownfield or under utilised land. This is profoundly untrue. Our parish is entirely rural and classed as open countryside and is all utilised as high quality agricultural land (grade 2).
We would also call into question the effectiveness of the issues and options consultation as only 0.12% of the population responded.
A rail based growth strategy policy may be required if growth is to be located around rail.