Call for Sites Form

Form ID: 1336

Other (please specify)

Please contact the agent.

Yes

Land at Chantry Avenue Kempston 1ha

Map 1233
Show full map

B2 B8

residential

employment

employment

residential

Yes

Housing

Nothing chosen

40-50

Self-build/Custom build homes , Older people housing

No answer given

40/50 dph

Affordable Housing - Affordable rent , Affordable Housing - Shared ownership

No answer given

No answer given

Nothing chosen

No answer given

No answer given

No answer given

No answer given

No answer given

No answer given

No answer given

No answer given

No answer given

Suitable access is achievable

Access as existing. Shown on plan

Yes

No

No

No

X

No answer given

No answer given

No answer given

1-2

The proposal has the opportunity to provide for energy efficiency features in design and to give consideration to renewables.

1.15

Above

None

Include in next stage of assessment

Site is available , Site is likely to be achievable

Include in next stage of assessment

+ The site is within or adjoining the urban area UAB.

+ A site accessibility score of 6 is recorded where 6 is 11 – 20 minutes’ walk.

++ A site accessibility score of 8 is recorded where 8 is 0 – 10 minutes’ walk.

+ The site is within 10 minutes’ walk of a bus stop with a regular bus service (at least hourly) which enables travel 8am-6pm Monday to Friday to a major employer or it is possible to walk to a major employer within 10 minutes.

+ The site is not within or adjoining the air quality management area.

+ The site is not within or adjoining a site of nature conservation importance

? Uncertain or insufficient information.

? Uncertain or insufficient information

0 The site is not within or adjoining the green infrastructure opportunity network or the impact of the proposal is neutral.

+ Opportunity area for 3 or more ecosystem services covers less than 25% of the site.

0 No renewable energy generation scheme included and efficiency standards that meet normal standards.

+ The site is within or adjoining the urban area.

+ A site accessibility score of 6 is recorded where 6 is 11 – 20 minutes’ walk.

++ A site accessibility score of 8 is recorded where 8 is 0 – 10 minutes’ walk.

+ The site is within 10 minutes’ walk of a bus stop with a regular bus service (at least hourly) which enables travel 8am-6pm Monday to Friday to a major employer or it is possible to walk to a major employer within 10 minutes.

0 The proposal appears to have no impact on heritage assets and their significance.

0 Proposal is not employment related.

0 Proposal does not include a main town centre use.

x The proposal does not include and is not within 400m walking distance of a publicly accessible open space.

x The proposal does not include and is not within 800m of a publicly accessible sports facility

0 The proposal is likely to have a neutral effect on the landscape.

N/A in UAB

+ All or a majority of the site is previously developed land as defined in the NPPF.

+ The site is not on best and most versatile agricultural land as defined in the NPPF.

+ The site is not located in a source protection zone.

+ The site is within flood zone 1 (areas that have been shown to be at less than 0.1% chance of flooding in any year).

+ The site is likely to provide a mix of housing and include affordable housing.

+ The development will meet identified housing needs eg elderly, care, travellers.

+ The site is within 800m of a facility where cultural or social activities can be accessed.

0 Neutral.

+ The development is likely to increase public surveillance or increase activity.

+ The site is within or adjoining the urban area.

+ A site accessibility score of 6 is recorded where 6 is 11 – 20 minutes’ walk.

++ A site accessibility score of 8 is recorded where 8 is 0 – 10 minutes’ walk

+ The site is within 10 minutes’ walk of a bus stop with a regular bus service (at least hourly) which enables travel 8am-6pm Monday to Friday to a major employer or it is possible to walk to a major employer within 10 minutes.

? Potential access requiring mitigation

? Potential capacity problem requiring mitigation

Access to the site is feasible from Chantry Avenue. The frontage of the site in Chantry Avenue is approximately 20m. There is a bus stop in front of the site. There are footways on both side of the Chantry Avenue in front of the site that are around 2m. Cycle is possible either on the footway or by using the road surface. A Transport Assessment (TA) will be required to identify the impact of traffic in Chantry Avenue as well as the Chantry Avenue/Magnolia Close junction and Chantry Avenue/Chantry Road junction.

Nothing chosen

No answer given

Site does not fall within the boundary of a MSA.

The site is suitable for allocation. It is an urban brownfield site that has been vacant and derelict for many years and with careful design, respecting the close proximity of employment uses, it is suitable for residential development. In order to achieve an acceptable solution, a masterplan and design code should be prepared. A transport assessment and site specific flood risk assessment to consider all sources of flooding will also be required. Site is proposed for allocation HOU9 Land at Chantry Avenue, Kempston.