Call for Sites Form

Form ID: 150

Land owner

No answer given

Nothing chosen

Land between 61-69 Oakley Road, Clapham, Bedford MK41 6AW

Map 1233
Show full map

paddock

No answer given

No answer given

residential

residential

No

Housing

Nothing chosen

3-4

Family houses , Self-build/Custom build homes , Older people housing

No answer given

No answer given

Market housing - Owner occupied

No answer given

No answer given

Nothing chosen

No answer given

No answer given

No answer given

No answer given

No answer given

No answer given

No answer given

No answer given

No answer given

Suitable access is achievable

Immediately fronting site off Oakley Road

Yes

No

No

2024-2025

No answer given

No answer given

No answer given

first or second

The dwellings could incorporate green roofs to control surface water dispersal and encourage biodiversity, solar chimney systems which could provide passive heating and ventilation alongside mechanical ventilation heat recovery system to maximise efficiency as well as flexibility in terms of switching between cooling and heating. The houses could also achieve Passivhaus sustainability standards.

No uploaded files for public display

0.27

Above

Site not in accordance with the emerging development strategy

Exclude from further assessment

Nothing chosen

Nothing chosen

x The site is not within or adjoining the urban area or a defined settlement policy area, or within the built form of a small settlement

++ A site accessibility score of 8 is recorded where 8 is 0 – 10 minutes’ walk.

+ A site accessibility score of 6 is recorded where 6 is 11 – 20 minutes’ walk.

+ The site is within 10 minutes’ walk of a bus stop with a regular bus service (at least hourly) which enables travel 8am-6pm Monday to Friday to a major employer or it is possible to walk to a major employer within 10 minutes.

+ The site is not within or adjoining the air quality management area.

+ The site is not within or adjoining a site of nature conservation importance

? Uncertain or insufficient information.

? Uncertain or insufficient information

0 The site is not within or adjoining the green infrastructure opportunity network or the impact of the proposal is neutral.

+ Opportunity area for 3 or more ecosystem services covers less than 25% of the site.

0 No renewable energy generation scheme included and efficiency standards that meet normal standards.

x The site is not within or adjoining the urban area or a defined settlement policy area, or within the built form of a small settlement

++ A site accessibility score of 8 is recorded where 8 is 0 – 10 minutes’ walk.

+ A site accessibility score of 6 is recorded where 6 is 11 – 20 minutes’ walk

+ The site is within 10 minutes’ walk of a bus stop with a regular bus service (at least hourly) which enables travel 8am-6pm Monday to Friday to a major employer or it is possible to walk to a major employer within 10 minutes.

x The proposal has the potential to cause harm to heritage assets. This harm may range from low to high. There may be options to avoid, reduce or mitigate this harm and where sites have not been ruled out altogether for other reasons, further assessment will be undertaken to more fully explore impacts on significance and options for harm reduction and mitigation. This further assessment may ultimately lead to the conclusion that the site should not be allocated.

0 Proposal is not employment related.

0 Proposal does not include a main town centre use.

x The proposal does not include and is not within 400m walking distance of a publicly accessible open space.

x The proposal does not include and is not within 800m of a publicly accessible sports facility

0 The proposal is likely to have a neutral effect on the landscape.

x The site is separated from a defined settlement policy area or the built form of a small settlement.

x The site is not previously developed land as defined in the NPPF.

? The classification of the site is not known or it is not clear whether is classified as grade 3a or 3b.

0 The site is located within a source protection zone but the proposed use is unlikely to be a risk to water supplies.

+ The site is within flood zone 1 (areas that have been shown to be at less than 0.1% chance of flooding in any year).

x The site is unlikely to provide a mix of housing and/or is unlikely to include affordable housing.

x The development will not meet identified needs eg elderly, care, travellers.

+ The site is within 800m of a facility where cultural or social activities can be accessed.

0 Neutral.

+ The development is likely to increase public surveillance or increase activity.

x The site is not within or adjoining the urban area or a defined settlement policy area, or within the built form of a small settlement

++ A site accessibility score of 8 is recorded where 8 is 0 – 10 minutes’ walk.

+ A site accessibility score of 6 is recorded where 6 is 11 – 20 minutes’ walk

+ The site is within 10 minutes’ walk of a bus stop with a regular bus service (at least hourly) which enables travel 8am-6pm Monday to Friday to a major employer or it is possible to walk to a major employer within 10 minutes.

+ No access constraints

+ No capacity issues

Vehicular access on Oakley Road is already provided to an acceptable standard for 3-4 dwellings. There is no significant traffic congestion along the A6 and it's intersection with Oakley Road. The closest bus stop is 400m to the west of the site on Lovell Road. It accomodates many services: 25, 50, 51, VL6 and VL8, providing 4+ buses per hour. There is plenty of footway space for pedestrian prams and wheelchairs. The footway is only on one side of the street, but it is wider than 1m. Furthermore, this is a shared space for also cyclists, providing direct segregated cycling access to the site. The site scores well under all evaluating criteria and no significant mitigation is recommended.

Nothing chosen

noise from road and rail very close

Site does not fall within the boundary of a MSA.

The site has been excluded from further assessment at Stage 1 because its location is not in accordance with the development strategy.