Call for Sites Form
No answer given
Land At The Chequers Public House Hall End Road Wootton
Public House and large field
Fields
Residential
Fields
Road, residential
Up to 50
No answer given
30 dph
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
Access will be provided off Hall End Road as shown on the Location Plan.
50
No answer given
No answer given
No answer given
2024
The proposed scheme will address climate change through appropriate adaptation and mitigation measures in the design. Where possible the dwellings will utilise low carbon building materials. The dwellings will be energy efficient and will be designed for comfort by balancing passive cooling design strategies which maximise comfort and minimise energy use during the warmer summers, with adequate levels of insulation for the warmer winters. The dwellings will be constructed so they are weather tight, robust enough to withstand extreme weather, and with foundations which are appropriate for their lifetime. The design will also include measures for water efficiency and effective drainage.
2.0
Access to the site will be from Hall End Road, which at this location has no footways either side but verges. The development only contains residential properties and on it's own unlikely to generate much traffic, however likely cumulative impacts with other proposed developments in the area. There is no designated cycle route in the vicinity although Hall End Road is a quiet and cycle-friendly road. The closest bus stop is outside the site, although served only infrequently. A Transport Assessment would be needed to assess the overall impact of the developments in the area as the cumulative impact would be quite large on the local highway network. Improvement of pedestrian and cycle access would be needed - provision of a footpath and designated cycle path. The road is very narrow however and although some of these provisions could potentially be located within the development boundaries, there are buildings along the road to the South making it difficult to provide these facilities. Improve frequency of bus routes along Hall End Road.
no noise concerns
The site has been excluded from further assessment at Stage 1 because its location is not in accordance with the development strategy.