Land adjoining Box End House, Box End, Road, Kempston Rural
The site has an extant permission for a hotel which has been commenced.
Retail
Leisure
Leisure
Equestrian/Box End Road
45
No answer given
30 dph
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
Access will be provided off Box End Road as indicated on the Site Location Plan.
45
No answer given
No answer given
No answer given
2025
The proposed scheme will address climate change through appropriate adaptation and mitigation measures in the design. Where possible the dwellings will utilise low carbon building materials. The dwellings will be energy efficient and will be designed for comfort by balancing passive cooling design strategies which maximise comfort and minimise energy use during the warmer summers, with adequate levels of insulation for the warmer winters. The dwellings will be constructed so they are weather tight, robust enough to withstand extreme weather, and with foundations which are appropriate for their lifetime. The design will also include measures for water efficiency and effective drainage.
No uploaded files for public display
2.56
The site is located adjacent to southern boundary of property Box End House on the east side of Box End Road and is approximately 4.5 miles south-west of Bedford town centre. Traffic generation from the potential residential development would generate an increase in pedestrian and traffic movements. Box End Road is a bus route and bus stops facilities exist outside 31 Box End Road and approximately 480m distance from the site. The footway strip outside the site of Box End Road approximately 1m in width and grass verge behind the footway. Cycling is possible by using the road surface. Given the proposal a road to adoptable standards is required in accordance with Bedford Borough Council's highway standards in respect of width of carriageway, provision of footway/maintenance margins and radius kerbs at the junction. There is scope for the extension of the existing bus service. There is potential to upgrade the footway to at least 1.8m in width in Box End Road. Pedestrian crossing points need to be identified at key points to enable safe crossing points for pedestrians.
close to box end water park
The site has been excluded from further assessment at Stage 1 because its location is not in accordance with the development strategy.