Call for Sites Form
Promoter / developer
114 And Land To The R/O 108A-138A Milton Road Clapham Bedford Bedfordshire MK41 6AS
No use - scrubland
Housing
Commercial / Housing
Private Road
Housing
74
Starter homes
25 dph
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No 146 Milton Road to be demolished to allow adequate access.
74
No answer given
No answer given
No answer given
Year 1
High Specification Energy Efficient Housing Positive Biodiversity Enhancements Retention and Planting of Trees Sustainable Location with Sustainable Transport Modes
2.97
Access will be formed by demolishing 146 Milton Road and constructing a new access road. A slight realignment of the bus stop will be needed as this currently covers part of the proposed access. There is only a very small amount of traffic in the area and the site has excellent access to the A6, however this development and other neighbouring ones may contribute to congestion. A bus stop approximatly 25m from the proposed access gives an hourly service to Bedford via the number 50 service. There is a wide and well-paved pavement directly outside the site on Milton Road. 250m from the site north on Milton Road there is a shared cycle/pedestrian path running along the A6 to Milton Ernest. A Transport Assessment is required to assess cumulative impacts of this site and others proposed in the vicinity. Realign current bus stop to ensure adequate and safe vehicular access. Ensure that a pavement is built as part of the access road and connects to the pavement on Milton Road. Suggest that the pavement on Milton Road be redesignated as a shared path to connect to the existing shared path 250m north of the site access.
no noise concerns
The site has been excluded from further assessment at Stage 1 because its location is not in accordance with the development strategy.