Call for Sites Form

Form ID: 3231

Other (please specify)

Promoter / Developer

Yes

Land on the north side of Kennell Hill, Sharnbrook, Bedfordshire. 5.93ha

Map 1233
Show full map

Not stated

Agricultural

Housing

Agricultural

Housing/Agricultural

No

Housing

Nothing chosen

155

Family houses , Other

Starter Homes

26 dph

Market housing - Owner occupied , Market housing - Private rented housing , Affordable Housing - Affordable rent , Affordable Housing - Shared ownership

No answer given

No answer given

Nothing chosen

No answer given

No answer given

No answer given

No answer given

No answer given

No answer given

No answer given

No answer given

No answer given

Suitable access is achievable

The proposed access is directly from Grange Lane.

Yes

No

No

No

X

No answer given

No answer given

No answer given

Year 1

High Specification Energy Efficient Housing Positive Biodiversity Enhancements Retention and Planting of Trees Sustainable Location with Sustainable Transport Modes

No uploaded files for public display

5.96

Above

Site not in accordance with the emerging development strategy

Exclude from further assessment

Nothing chosen

Nothing chosen

x The site is not within or adjoining the urban area or a defined settlement policy area, or within the built form of a small settlement

++ A site accessibility score of 8 is recorded where 8 is 0 – 10 minutes’ walk.

++ A site accessibility score of 8 is recorded where 8 is 0 – 10 minutes’ walk.

x The site is within 10 minutes’ walk of a bus stop with an infrequent bus service (less frequent than hourly each day) which enables travel 8am6pm Monday to Friday to a major employer.

+ The site is not within or adjoining the air quality management area.

+ The site is not within or adjoining a site of nature conservation importance

x Protected species could be affected.

? Uncertain or insufficient information

0 The site is not within or adjoining the green infrastructure opportunity network or the impact of the proposal is neutral.

+ Opportunity area for 3 or more ecosystem services covers less than 25% of the site.

0 No renewable energy generation scheme included and efficiency standards that meet normal standards.

x The site is not within or adjoining the urban area or a defined settlement policy area, or within the built form of a small settlement

++ A site accessibility score of 8 is recorded where 8 is 0 – 10 minutes’ walk.

++ A site accessibility score of 8 is recorded where 8 is 0 – 10 minutes’ walk.

x The site is within 10 minutes’ walk of a bus stop with an infrequent bus service (less frequent than hourly each day) which enables travel 8am6pm Monday to Friday to a major employer.

x The proposal has the potential to cause harm to heritage assets. This harm may range from low to high. There may be options to avoid, reduce or mitigate this harm and where sites have not been ruled out altogether for other reasons, further assessment will be undertaken to more fully explore impacts on significance and options for harm reduction and mitigation. This further assessment may ultimately lead to the conclusion that the site should not be allocated.

0 Proposal is not employment related.

0 Proposal does not include a main town centre use.

x The proposal does not include and is not within 400m walking distance of a publicly accessible open space.

x The proposal does not include and is not within 800m of a publicly accessible sports facility

? It is uncertain what effect the proposal is likely to have on the landscape / more information is required.

x The site is separated from a defined settlement policy area or the built form of a small settlement.

x The site is not previously developed land as defined in the NPPF.

? The classification of the site is not known or it is not clear whether is classified as grade 3a or 3b.

+ The site is not located in a source protection zone.

xx Development would be in flood zones 3a or 3b.

+ The site is likely to provide a mix of housing and include affordable housing.

x The development will not meet identified needs eg elderly, care, travellers.

+ The site is within 800m of a facility where cultural or social activities can be accessed.

0 Neutral.

+ The development is likely to increase public surveillance or increase activity.

x The site is not within or adjoining the urban area or a defined settlement policy area, or within the built form of a small settlement

++ A site accessibility score of 8 is recorded where 8 is 0 – 10 minutes’ walk.

++ A site accessibility score of 8 is recorded where 8 is 0 – 10 minutes’ walk

x The site is within 10 minutes’ walk of a bus stop with an infrequent bus service (less frequent than hourly each day) which enables travel 8am6pm Monday to Friday to a major employer.

+ No access constraints

? Potential capacity problem requiring mitigation

Duplicate of site 1009. The site is located on the north side of Kennell Hill in the village of Sharnbrook, approximately 7.8 miles north of Bedford town centre. The site will be accessed via a priority junction from Kennell Hill. There is moderate traffic congestion on Kennell Hill outside of the site entrance, and the potential development would have an impact. The closest bus stop is located to the south of the site on Kennell Hill and Templars Way. There is a 1.8m footway in the frontage of the site on Kennell Hill. There are no formal cycle tracks and cycling is possible only by using the road surface. A Transport Assessment will be required to identify the impact of traffic on Kennell Hill as well as the Templars Way/Kennell Hill/Mill Road junction. The location of the proposed access required is to be specified. The proposal will require a road to adoptable standards in accordance with Bedford Borough Council's highway standards in terms of accommodating the carriageway/footway widths and the required radius kerbs. Consider marking on road cycle lanes and improving frequency of bus services.

Nothing chosen

noise from railway

Site does not fall within the boundary of a MSA.

The site has been excluded from further assessment at Stage 1 because its location is not in accordance with the development strategy.