Call for Sites Form

Form ID: 332

Other (please specify)

Promoter/Developer

Yes

Land at New Road / Woodpecker Close, Great Barford, Bedfordshire

Map 1233
Show full map

Not answered. Gross site area: 3.863ha

No answer given

Housing

No answer given

Housing

No

Housing

Housing

100

Family houses , Other

Starter homes. Affordable Rent. Owner Occ. Private Rented. Shared Ownership.

26 / ha

Market housing - Owner occupied , Market housing - Private rented housing , Affordable Housing - Affordable rent , Affordable Housing - Shared ownership , Other

Starter Homes

No answer given

Nothing chosen

No answer given

No answer given

No answer given

No answer given

No answer given

No answer given

No answer given

No answer given

No answer given

Suitable access is achievable

The proposed access is directly from New Road.

Yes

No

No

No

x Dwellings (not stated)

No answer given

No answer given

No answer given

1 year.

High Specification Energy Efficient Housing Positive Biodiversity Enhancements Retention and Planting of Trees Sustainable Location with Sustainable Transport Modes

No uploaded files for public display

3.81

Above

Site not in accordance with the emerging development strategy

Exclude from further assessment

Nothing chosen

Nothing chosen

? The site is within or adjoining a defined settlement policy area or within the built form of a small settlement.

+ A site accessibility score of 6 is recorded where 6 is 11 – 20 minutes’ walk.

+ A site accessibility score of 6 is recorded where 6 is 11 – 20 minutes’ walk.

x The site is within 10 minutes’ walk of a bus stop with an infrequent bus service (less frequent than hourly each day) which enables travel 8am6pm Monday to Friday to a major employer.

+ The site is not within or adjoining the air quality management area.

+ The site is not within or adjoining a site of nature conservation importance

? Uncertain or insufficient information.

? Uncertain or insufficient information

+ The site is within or adjoining the green infrastructure opportunity network and able to enhance the network.

+ Opportunity area for 3 or more ecosystem services covers less than 25% of the site.

0 No renewable energy generation scheme included and efficiency standards that meet normal standards.

? The site is within or adjoining a defined settlement policy area or within the built form of a small settlement.

+ A site accessibility score of 6 is recorded where 6 is 11 – 20 minutes’ walk.

+ A site accessibility score of 6 is recorded where 6 is 11 – 20 minutes’ walk

x The site is within 10 minutes’ walk of a bus stop with an infrequent bus service (less frequent than hourly each day) which enables travel 8am6pm Monday to Friday to a major employer.

x The proposal has the potential to cause harm to heritage assets. This harm may range from low to high. There may be options to avoid, reduce or mitigate this harm and where sites have not been ruled out altogether for other reasons, further assessment will be undertaken to more fully explore impacts on significance and options for harm reduction and mitigation. This further assessment may ultimately lead to the conclusion that the site should not be allocated.

0 Proposal is not employment related.

0 Proposal does not include a main town centre use.

x The proposal does not include and is not within 400m walking distance of a publicly accessible open space.

x The proposal does not include and is not within 800m of a publicly accessible sports facility

Nothing chosen

+ The site adjoins a defined settlement policy area or the built form of a small settlement.

x The site is not previously developed land as defined in the NPPF.

x All or a majority of the site is best and most versatile agricultural land as defined in the NPPF.

+ The site is not located in a source protection zone.

+ The site is within flood zone 1 (areas that have been shown to be at less than 0.1% chance of flooding in any year).

+ The site is likely to provide a mix of housing and include affordable housing.

+ The development will meet identified housing needs eg elderly, care, travellers.

+ The site is within 800m of a facility where cultural or social activities can be accessed.

0 Neutral.

+ The development is likely to increase public surveillance or increase activity.

? The site is within or adjoining a defined settlement policy area or within the built form of a small settlement.

+ A site accessibility score of 6 is recorded where 6 is 11 – 20 minutes’ walk.

+ A site accessibility score of 6 is recorded where 6 is 11 – 20 minutes’ walk

x The site is within 10 minutes’ walk of a bus stop with an infrequent bus service (less frequent than hourly each day) which enables travel 8am6pm Monday to Friday to a major employer.

+ No access constraints

? Potential capacity problem requiring mitigation

Vehicular access will be off New Road which presents no problems. Some moderate traffic in the area along New Road at peak times which could be worsened by the development and neighbouring proposed sites. The nearest bus stop is 400m away where the 27 bus provides 4 daily services to Bedford. However another stop approx 1km away provides a half-hourly service between Bedford and Cambridge. There is currently no pedestrian or cycle connectivity, however a connection to Woodpecker Close could provide this. There is also an access point to the Sandy-Bedford cycle track nearby, accessible via some quiet roads. Include a connection to Woodpecker Close to provide pedestrian and cycle connectivity. Better signpost the route to the nearby access point of the Sandy- Bedford cycle track.

Nothing chosen

some concern from noise from industrial at New Road

Site does not fall within the boundary of a MSA.

The site has been excluded from further assessment at Stage 1 because its location is not in accordance with the development strategy.