Call for Sites Form
No answer given
8
No answer given
10 dwellings per hectare
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
Via the extant access to the north of the site, leading to Renhold Road.
All to be built within first five years.
No answer given
No answer given
No answer given
2024
All dwellings would be built to the Passivhaus standard, built using the Kingspan TEK Building System. Consequently, they will exceed all the requirements set out for energy efficiency and efficient use of water resources. Because of the low energy requirements of Passivhaus-compliant dwellings all heating requirements will be met from renewable sources (solar panels and air-source heating), as well as a high proportion of energy needs. Each dwelling would be fitted with an external EV charge point.
No uploaded files for public display
0.86
The site is located on the south side of Renhold Road in Wilden area approximately 4.5 miles northeast of Bedford town centre. Access to the site is feasible via the extant access to the north of the site, leading to Renhold Road. There is no significant traffic congestion in the area. There is a bus stop on the other side of the road approximately 70m east from the site entrance. There is a green verge in the frontage of the site, but there is no formal footway. Cycling is feasible on-road. A footway and crossing facilities for pedestrians required to allow for safe access to the bus stop on the other side of Renhold road.
would consider eastern use
The site has been excluded from further assessment at Stage 1 because its location is not in accordance with the development strategy.