Call for Sites Form
Agent
Land north of The Cottage, Green End, Pertenhall, MK44 2AZ
Agricultural land
Agricultural land
Dwellings
Green End
Agricultural land
10
No answer given
23 dwellings per hectare to reflect the character of the area
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
There is an existing access off Green End, see site location plan
2024/2025
No answer given
No answer given
No answer given
2024/2025
The development will use carbon efficient building materials in its construction as well as utilising efficient energy and water systems internally alongside solar panels on the roof to create energy which can be used by the dwellings. Externally there will be bicycle provision to encourage sustainable modes of transport and electric car charging points. The scheme will also incorporate new hedgerow on the western boundary and provide a net gain in biodiversity with bird and bats boxes and native planting.
No uploaded files for public display
0.43
Access will be using Green End on the east frontage of the site. No problems accessing the highway but Green End is a narrow single track road with few passing places. Other than that there are no clear signs of congestion in the local area. There is a bus stop 350m away but no pedestrian link to it and it is not clearly marked. There is no direct pedestrian or cycle access to the site however there are extensive cross-country public footpaths nearby and quiet roads which could be used for cycling. Additional passing place on Green Lane to cater for the increase in traffic. Improved visibility of the bus stop on the B660 such as signs and/or road markings. Improvements to nearby public footpaths.
agricultural intensity to the south west is a potenital amenity issue
The site has been excluded from further assessment at Stage 1 because its location is not in accordance with the development strategy.