Call for Sites Form

Form ID: 533

Land owner

No answer given

N/A

The Vicarage Thurleigh Road Milton Ernest MK44 1RF

Map 1233
Show full map

Residential

Residential

Residential

Agricultural

Residential

Yes

Housing

Nothing chosen

4

Family houses

No answer given

17.2 dph

Market housing - Owner occupied

No answer given

No answer given

Nothing chosen

No answer given

No answer given

No answer given

No answer given

No answer given

No answer given

No answer given

No answer given

No answer given

Suitable access is achievable

Via widened exsiting driveway access from Thurleigh Road

Yes

No

No

No

2024

No answer given

No answer given

No answer given

2024

The site is well located to existing development placing less dependency on vehicle movements and greater opportunities for walking, cycling and use of public transport. Development will take account of landform, layout, building orientation, massing and landscaping to minimise energy consumption, including maximising cooling and avoiding solar gain in the summer. Overall, it will be planned so as to minimise carbon dioxide emissions through giving careful consideration to how all aspects support opportunities for renewable or low-carbon energy supply. Development will give priority to the use of sustainable drainage systems, paying attention to the potential contribution to be gained to water harvesting from impermeable surfaces and accommodating waste water recycling. Development will adhere to Building Control and other regulatory regimes. Environmental performance will be designed into the proposed development. A future Design and Access Statement will demonstrate how the proposed development will contribute to and comply with the key planning objectives

No uploaded files for public display

0.23

Below - exclude at stage 1

Site not in accordance with the emerging development strategy

Exclude from further assessment

Nothing chosen

Nothing chosen

? The site is within or adjoining a defined settlement policy area or within the built form of a small settlement.

+ A site accessibility score of 6 is recorded where 6 is 11 – 20 minutes’ walk.

++ A site accessibility score of 8 is recorded where 8 is 0 – 10 minutes’ walk.

x The site is within 10 minutes’ walk of a bus stop with an infrequent bus service (less frequent than hourly each day) which enables travel 8am6pm Monday to Friday to a major employer.

+ The site is not within or adjoining the air quality management area.

x The site is within or adjoining a site of nature conservation importance

? Uncertain or insufficient information.

? Uncertain or insufficient information

0 The site is not within or adjoining the green infrastructure opportunity network or the impact of the proposal is neutral.

++ Opportunity area for fewer than 3 ecosystem services.

0 No renewable energy generation scheme included and efficiency standards that meet normal standards.

? The site is within or adjoining a defined settlement policy area or within the built form of a small settlement.

+ A site accessibility score of 6 is recorded where 6 is 11 – 20 minutes’ walk.

++ A site accessibility score of 8 is recorded where 8 is 0 – 10 minutes’ walk.

x The site is within 10 minutes’ walk of a bus stop with an infrequent bus service (less frequent than hourly each day) which enables travel 8am6pm Monday to Friday to a major employer.

x The proposal has the potential to cause harm to heritage assets. This harm may range from low to high. There may be options to avoid, reduce or mitigate this harm and where sites have not been ruled out altogether for other reasons, further assessment will be undertaken to more fully explore impacts on significance and options for harm reduction and mitigation. This further assessment may ultimately lead to the conclusion that the site should not be allocated.

0 Proposal is not employment related.

0 Proposal does not include a main town centre use.

x The proposal does not include and is not within 400m walking distance of a publicly accessible open space.

x The proposal does not include and is not within 800m of a publicly accessible sports facility

0 The proposal is likely to have a neutral effect on the landscape.

+ The site adjoins a defined settlement policy area or the built form of a small settlement.

x The site is not previously developed land as defined in the NPPF.

x All or a majority of the site is best and most versatile agricultural land as defined in the NPPF.

+ The site is not located in a source protection zone.

+ The site is within flood zone 1 (areas that have been shown to be at less than 0.1% chance of flooding in any year).

x The site is unlikely to provide a mix of housing and/or is unlikely to include affordable housing.

x The development will not meet identified needs eg elderly, care, travellers.

+ The site is within 800m of a facility where cultural or social activities can be accessed.

0 Neutral.

+ The development is likely to increase public surveillance or increase activity.

? The site is within or adjoining a defined settlement policy area or within the built form of a small settlement.

+ A site accessibility score of 6 is recorded where 6 is 11 – 20 minutes’ walk.

++ A site accessibility score of 8 is recorded where 8 is 0 – 10 minutes’ walk

x The site is within 10 minutes’ walk of a bus stop with an infrequent bus service (less frequent than hourly each day) which enables travel 8am6pm Monday to Friday to a major employer.

+ No access constraints

+ No capacity issues

Access as existing onto Thurleigh Rd, but widened. Some moderate traffic nearby but the scale of proposed development is unlikely to cause a problem. There is an hourly bus service to/from Bedford 330m from the site. There is a pavement directly outside the site linking to the village centre and bus stops, but is narrow at approximately 1m wide. Twinwood Rd nearby provides a quiet cycle route to Clapham which is the nearest place with facilities such as food shops. Scale of development unlikely warrants cost of mitigations/improvements

Nothing chosen

twinwoods business park may be a source of noise

Site does not fall within the boundary of a MSA.

The site has been excluded from further assessment at Stage 1 because its location is not in accordance with the development strategy.