Call for Sites Form
No answer given
The Vicarage Church End Kempston MK43 8RH
Residential
Agricultural
Agricultural
Residential
Agricultural
3
No answer given
12 dph
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
Existing access from Church End
2024
No answer given
No answer given
No answer given
2024
The site is well located to existing development placing less dependency on vehicle movements and greater opportunities for walking, cycling and use of public transport. Development will take account of landform, layout, building orientation, massing and landscaping to minimise energy consumption, including maximising cooling and avoiding solar gain in the summer. Overall, it will be planned so as to minimise carbon dioxide emissions through giving careful consideration to how all aspects support opportunities for renewable or low-carbon energy supply. Development will give priority to the use of sustainable drainage systems, paying attention to the potential contribution to be gained to water harvesting from impermeable surfaces and accommodating waste water recycling. Development will adhere to Building Control and other regulatory regimes. Environmental performance will be designed into the proposed development. A future Design and Access Statement will demonstrate how the proposed development will contribute to and comply with the key planning objectives
No uploaded files for public display
0.25
S boundary Church End. 1 bus per hour approx 650m to the south east. Shared cycle / footways on Cemetery Rd towards Kempston to the east of the A6 roundabout. Improvements to footways on Church End could be investigated but proposed development unlikely warrants extensive improvements.
no noise concerns
The site has been excluded from further assessment at Stage 1 because its location is not in accordance with the development strategy.