Call for Sites Form

Form ID: 566

Other (please specify)

Promoter

Yes

Land off Bedford Road, Willington.

Map 1233
Show full map

Agricultural

No answer given

No answer given

No answer given

No answer given

No

Housing

Nothing chosen

Up to 46 dwellings

Family houses , Other

+ Affordable Housing

20dph

Market housing - Owner occupied , Affordable Housing - Affordable rent , Affordable Housing - Shared ownership

No answer given

No answer given

Nothing chosen

No answer given

No answer given

No answer given

No answer given

No answer given

No answer given

No answer given

No answer given

No answer given

Suitable access is achievable

Priority vehicular access point from Balls Lane + pedestrian access from Bedford Road

Yes

No

Yes

No

46

No answer given

No answer given

No answer given

2024/25

All aspects of the proposal's design have taken climate change into account. There will be a significant amount of additional planting on the site, resulting in a net gain in biodiversity. Flood risk mitigation has been designed to take into account a future climate change allowance. It is considered that a range of detailed sustainability measures could be secured by planning condition to be delivered at the Reserved Matters stage.

2.32

Above

Site not in accordance with the emerging development strategy

Exclude from further assessment

Nothing chosen

Nothing chosen

? The site is within or adjoining a defined settlement policy area or within the built form of a small settlement.

++ A site accessibility score of 8 is recorded where 8 is 0 – 10 minutes’ walk.

++ A site accessibility score of 8 is recorded where 8 is 0 – 10 minutes’ walk.

+ The site is within 10 minutes’ walk of a bus stop with a regular bus service (at least hourly) which enables travel 8am-6pm Monday to Friday to a major employer or it is possible to walk to a major employer within 10 minutes.

+ The site is not within or adjoining the air quality management area.

+ The site is not within or adjoining a site of nature conservation importance

? Uncertain or insufficient information.

? Uncertain or insufficient information

+ The site is within or adjoining the green infrastructure opportunity network and able to enhance the network.

xx Opportunity area for 3 or more ecosystem services covers more than 50% of the site.

0 No renewable energy generation scheme included and efficiency standards that meet normal standards.

? The site is within or adjoining a defined settlement policy area or within the built form of a small settlement.

++ A site accessibility score of 8 is recorded where 8 is 0 – 10 minutes’ walk.

++ A site accessibility score of 8 is recorded where 8 is 0 – 10 minutes’ walk.

+ The site is within 10 minutes’ walk of a bus stop with a regular bus service (at least hourly) which enables travel 8am-6pm Monday to Friday to a major employer or it is possible to walk to a major employer within 10 minutes.

x The proposal has the potential to cause harm to heritage assets. This harm may range from low to high. There may be options to avoid, reduce or mitigate this harm and where sites have not been ruled out altogether for other reasons, further assessment will be undertaken to more fully explore impacts on significance and options for harm reduction and mitigation. This further assessment may ultimately lead to the conclusion that the site should not be allocated.

0 Proposal is not employment related.

0 Proposal does not include a main town centre use.

x The proposal does not include and is not within 400m walking distance of a publicly accessible open space.

x The proposal does not include and is not within 800m of a publicly accessible sports facility

0 The proposal is likely to have a neutral effect on the landscape.

+ The site adjoins a defined settlement policy area or the built form of a small settlement.

x The site is not previously developed land as defined in the NPPF.

x All or a majority of the site is best and most versatile agricultural land as defined in the NPPF.

+ The site is not located in a source protection zone.

+ The site is within flood zone 1 (areas that have been shown to be at less than 0.1% chance of flooding in any year).

+ The site is likely to provide a mix of housing and include affordable housing.

x The development will not meet identified needs eg elderly, care, travellers.

+ The site is within 800m of a facility where cultural or social activities can be accessed.

0 Neutral.

+ The development is likely to increase public surveillance or increase activity.

? The site is within or adjoining a defined settlement policy area or within the built form of a small settlement.

++ A site accessibility score of 8 is recorded where 8 is 0 – 10 minutes’ walk.

++ A site accessibility score of 8 is recorded where 8 is 0 – 10 minutes’ walk

+ The site is within 10 minutes’ walk of a bus stop with a regular bus service (at least hourly) which enables travel 8am-6pm Monday to Friday to a major employer or it is possible to walk to a major employer within 10 minutes.

+ No access constraints

? Potential capacity problem requiring mitigation

The site is located between on the north side of Bedford Road and at the north-east junction with Balls Lane in the village of Willington approximately 4.5 miles east of Bedford town centre. The existing point of access is along Balls Lane. There is limited traffic congestion recorded in the vicinity and the proposal will likely have a limited impact on the highway network in comparison with the traffic flow along Bedford Road. The nearest bus stops are located outside the site on Bedford Road. Footways on both sides are also present albeit that are less than the standard of 2.0m in width. Barford Road from the west of the junction with Wood Lane is part of the Thatcher’s Way cycle route. Footways along Bedford Road should be widened and on street cycle connectivity could be marked along Bedford Road to connect to the Thatcher's Way cycle route.

Nothing chosen

no noise concerns

Entire site falls within the boundary of a MSA.

The site has been excluded from further assessment at Stage 1 because its location is not in accordance with the development strategy.