Call for Sites Form
No answer given
Land south of Mill Road, Mill Road, Coffle End, Sharnbrook
Grazing / Grassland
Residential / Industrial
Woodland
Residential
Residential / Railway
32
No answer given
25
Starter homes
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
See site plan
32
No answer given
No answer given
No answer given
2025
Each home created will include renewable energy creation (solar panels) to achieve at least 19% increase in current building regulation requirements (as set out in policy 54 of the Local Plan 2030). Opportunities for renewable schemes will be explored at detailed design stage.
1.38
The site is located on the south side of Mill Road in the village of Sharnbrook approximately 7.4 miles north of Bedford town centre. Access to the site is feasible from Mill Road, which has a speed limit of 30mph. Mill Road experiences some traffic congestion. A bus stop is located directly north of the site. There is an existing footway immediately fronting the site, although this appears to be less than 2m wide. No footways are present on the opposite side. There are no formal cycle tracks but cycling is possible on-road. The proposal will require a road, constructed to adopted standards, in accordance with Bedford Borough Council's highway standards. This includes accommodating the carriageway/footway widths and the required radius kerbs. Consider marking on-street cycle lanes. Crossing facilities for pedestrians to reach the bus stop on the other side of the road should be proposed.
rail noise
The site has been excluded from further assessment at Stage 1 because its location is not in accordance with the development strategy.