Call for Sites Form
No answer given
Land east of Stoke Mill, Mill Road, Coffle End, Sharnbrook
Market Garden
Farmland
River Ouse
Residential / Farm shop
Industrial / Leisure
52
No answer given
25
Starter homes
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
See Site Plan
52
No answer given
No answer given
No answer given
2025
6.1 The council has declared a climate emergency. Please explain how your proposal will respond to climate change (see Local Plan 2030 Policy 51S) Each home created will include renewable energy creation (solar panels) to achieve at least 19% increase in current building regulation requirements (as set out in policy 54 of the Local Plan 2030). Opportunities for renewable schemes will be explored at detailed design stage.
2.49
The site is located on the south side of Mill Road in the village of Sharnbrook approximately 7.1 miles north of Bedford town centre. Access to the site is feasible via Mill Road, which has a 30mph speed limit. Mill Road experiences some traffic congestion. The closest bus stop is located 500m west from the site. A 1m footway exists outside of the site on Mill Road and there are no formal cycle tracks. Cycling is possible on-road. A Transport Assessment will be required to identify the impact of traffic on Mill Road as well as at the Mill Road/A6 roundabout. The proposals will require a road to adopted standards in accordance with Bedford Borough Council's highway standards in terms of accommodating the carriageway/footway widths and the required radius kerbs. Widening the existing footway serving the site is required. Consider marking on-street cycle lanes.
no noise concerns
The site has been excluded from further assessment at Stage 1 because its location is not in accordance with the development strategy.