Call for Sites Form
No answer given
Land south of Mill Road,,Coffle End, Sharnbrook
Grassland / Market Garden
Residential / Farmland
Woodland / River
A6
Railway
84
No answer given
25
Starter homes
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
0.85 ha Community Use, 0.5 ha Play Area, 2 ha Woodland Activity Area
See Parameters Plan
See Parameters Plan
84
No answer given
No answer given
No answer given
2025
Each home created will include renewable energy creation (solar panels) to achieve at least 19% increase in current building regulation requirements (as set out in policy 54 of the Local Plan 2030). Opportunities for renewable schemes will be explored at detailed design stage.
6.72
Site 582, 583 and a part of 581 are included in this proposal. The sites are located on the south side of Mill Road in the village of Sharnbrook, approximately 7.2 miles north of Bedford town centre. Accesses to the sites are feasible via Mill Road, which is a 30mph speed limit road. Mill Road and the Mill Road/A6 roundabout experince some traffic congestion. The closest bus stop is located within a radius of 500m from the sites. A 1m footway exists outside of the sites on Mill Road and there are no formal cycle tracks. Cycling is possible onroad. A Transport Assessment will be required to identify the impact of the proposals on Mill Road as well as the Mill Road/A6 roundabout. The proposals will require a road, constructed to adopted standards, in accordance with Bedford Borough Council's highway standards in terms of accommodating the carriageway/footway widths and the required radius kerbs. Widening of the existing footway outside of the sites is required. Consider marking on-street cycle lanes.
no noise concerns
The site has been excluded from further assessment at Stage 1 because its location is not in accordance with the development strategy.