Call for Sites Form
Please Contact the Agent: Director, PPS.
Land Off New Road, Great Barford. 3.9 ha
Agriculture. 3.9 ha
Residential
Agriculture
Various
Residential
92 Dwellings
No answer given
30 Dwellings / ha
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
Access will be provided off New Road as shown on the Site Location Plan and Sketch Layout.
75 Dwellings
29 Dwellings
No answer given
No answer given
2025
The proposed scheme will address climate change through appropriate adaptation and mitigation measures in the design. Where possible the dwellings will utilise low carbon building materials. The dwellings will be energy efficient and will be designed for comfort by balancing passive cooling design strategies which maximise comfort and minimise energy use during the warmer summers, with adequate levels of insulation for the warmer winters. The dwellings will be constructed so they are weather tight, robust enough to withstand extreme weather, and with foundations which are appropriate for their lifetime. The design will also include measures for water efficiency and effective drainage.
No uploaded files for public display
3.66
See site 332 - same site. Vehicular access will be off New Road which presents no problems. Some moderate traffic in the area along New Road at peak times which could be worsened by the development and neighbouring proposed sites. The nearest bus stop is 400m away where the 27 bus provides 4 daily services to Bedford. However another stop approx 1km away provides a half-hourly service between Bedford and Cambridge. There is currently no pedestrian or cycle connectivity, however a connection to Woodpecker Close could provide this. There is also an access point to the Sandy-Bedford cycle track nearby, accessible via some quiet roads. Include a connection to Woodpecker Close to provide pedestrian and cycle connectivity. Better signpost the route to the nearby access point of the Sandy- Bedford cycle track.
commercial use to the north east
The site has been excluded from further assessment at Stage 1 because its location is not in accordance with the development strategy.