Call for Sites Form
Please Contact: Frazer Hickling, PPS. Kingsway, Bedford
Land At Keysoe Road, Thurleigh. 9.3 ha
Various
Airfield
Commercial / Paddock / Garden
Commercial / Paddock / Garden
agricultural
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
B1, B2, & B8
Unknown at this time
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
Two access points will be provided off Keysoe Road as shown on the Site Location Plan. The site is also accessible via the existing access to the clients commercial premises
No answer given
No answer given
No answer given
No answer given
N/A
The proposed scheme will address climate change through appropriate adaptation and mitigation measures in the design. Where possible the buildings will utilise low carbon building materials. The buildings will be energy efficient and will be designed for comfort by balancing passive cooling design strategies which maximise comfort and minimise energy use during the warmer summers, with adequate levels of insulation for the warmer winters. The buildings will be constructed so they are weather tight, robust enough to withstand extreme weather, and with foundations which are appropriate for their lifetime. The design will also include measures for water efficiency and effective drainage.
9.31
The site is located on the west side of Keysoe Road north of the village of Thurleigh approximately 7.3 miles north of Bedford town centre. There are two access points off Keysoe Road and the site is also accessible via the existing access to the clients commercial premises. There is no significant traffic congestion recorded on Keysoe Road. The nearest bus stop is located 1.4km south of the site in the village of Thurleigh. There are no formal footways or cycle paths, however Keysoe Rd is likely quiet enough for cycling. No footway connections possible to anywhere nearby. An extension to existing bus routes in Thurleigh would also be necessary and there is likely not going to be sufficient demand for this from this particular site.
consider plamer motorsport
The site has been excluded from further assessment at Stage 1 because its location is not in accordance with the development strategy.