Call for Sites Form

Form ID: 748

Other (please specify)

Please Contact the Agent: Frazer HIckling

Yes

Land South of Goldington Road, Bedford

Map 1233
Show full map

Not stated

Not stated

Not stated

Not stated

Not stated

Don't know

All other types

Housing , Employment , All other types

Not Stated

Family houses , Self-build/Custom build homes , Older people housing

No answer given

Not stated

Market housing - Owner occupied , Affordable Housing - Affordable rent , Affordable Housing - Shared ownership

No answer given

No answer given

Nothing chosen

No answer given

Not stated

Not stated

No answer given

No answer given

No answer given

No answer given

Not stated

Not stated

Suitable access is achievable

Not stated

Yes

Don't know

No

No

Not Stated

Not Stated

Not Stated

Not Stated

Not Stated

The proposed scheme will address climate change through appropriate adaptation and mitigation measures in the design. Where possible the buildings will utilise low carbon building materials. The buildings will be energy efficient and will be designed for comfort by balancing passive cooling design strategies which maximise comfort and minimise energy use during the warmer summers, with adequate levels of insulation for the warmer winters. The buildings will be constructed so they are weather tight, robust enough to withstand extreme weather, and with foundations which are appropriate for their lifetime. The design will also include measures for water efficiency and effective drainage.

No uploaded files for public display

14.51

Above

Site within flood zone 3a or 3b

Exclude from further assessment

Nothing chosen

Nothing chosen

+ The site is within or adjoining the urban area UAB.

++ A site accessibility score of 8 is recorded where 8 is 0 – 10 minutes’ walk.

+ A site accessibility score of 6 is recorded where 6 is 11 – 20 minutes’ walk.

+ The site is within 10 minutes’ walk of a bus stop with a regular bus service (at least hourly) which enables travel 8am-6pm Monday to Friday to a major employer or it is possible to walk to a major employer within 10 minutes.

+ The site is not within or adjoining the air quality management area.

x The site is within or adjoining a site of nature conservation importance

? Uncertain or insufficient information.

? Uncertain or insufficient information

x The site is within a green infrastructure opportunity network but is likely to compromise the network.

+ Opportunity area for 3 or more ecosystem services covers less than 25% of the site.

0 No renewable energy generation scheme included and efficiency standards that meet normal standards.

+ The site is within or adjoining the urban area.

++ A site accessibility score of 8 is recorded where 8 is 0 – 10 minutes’ walk.

+ A site accessibility score of 6 is recorded where 6 is 11 – 20 minutes’ walk

+ The site is within 10 minutes’ walk of a bus stop with a regular bus service (at least hourly) which enables travel 8am-6pm Monday to Friday to a major employer or it is possible to walk to a major employer within 10 minutes.

x The proposal has the potential to cause harm to heritage assets. This harm may range from low to high. There may be options to avoid, reduce or mitigate this harm and where sites have not been ruled out altogether for other reasons, further assessment will be undertaken to more fully explore impacts on significance and options for harm reduction and mitigation. This further assessment may ultimately lead to the conclusion that the site should not be allocated.

+ Proposal includes permanent economic and employment opportunities.

0 Proposal does not include a main town centre use.

x The proposal does not include and is not within 400m walking distance of a publicly accessible open space.

+ The proposal includes or is within 800m of a publicly accessible sports facility.

? It is uncertain what effect the proposal is likely to have on the landscape / more information is required.

N/A in UAB

x The site is not previously developed land as defined in the NPPF.

+ The site is not on best and most versatile agricultural land as defined in the NPPF.

+ The site is not located in a source protection zone.

? Part of a site is within flood zone 2 or 3 but the area proposed for development is in flood zone 1. , xx Development would be in flood zones 3a or 3b.

+ The site is likely to provide a mix of housing and include affordable housing.

+ The development will meet identified housing needs eg elderly, care, travellers.

+ The site is within 800m of a facility where cultural or social activities can be accessed.

0 Neutral.

+ The development is likely to increase public surveillance or increase activity.

+ The site is within or adjoining the urban area.

++ A site accessibility score of 8 is recorded where 8 is 0 – 10 minutes’ walk.

x A site accessibility score of 4 is recorded where 4 is 21 – 30 minutes’ walk.

+ The site is within 10 minutes’ walk of a bus stop with a regular bus service (at least hourly) which enables travel 8am-6pm Monday to Friday to a major employer or it is possible to walk to a major employer within 10 minutes.

? Potential access requiring mitigation

+ No capacity issues

Proposed access is off the new road that is currently used solely for accessing Lidl, a slight reconfiguration of the road may be needed here to accommodate the new site. This provides access to the A4280 dual carriageway via an existing signalised junction. There is moderate traffic congestion on some local roads, however the main arterial roads serving the development (the A4280 and A421) have manageable traffic levels. Given the size of the site and the unknown scale of the development proposed, further assessment should be undertaken.There is a bus stop 250m from the site entrance where the number 5 bus provides five services per hour. There is a pavement on the road where the proposed access is which leads to a signalised pedestrian crossing across the A4280, where there is then a shared cycle/pedestrian path. Given the uncertainty over the scale of the proposed development, a Transport Assessment will likely be required to assess the impacts on surrounding networks. A slight reconfiguration of the access road may be required - the best option would be to continue the road directly into the site and make a give way junction for the Lidl access.

Likely to require contaminated land assessment and remediation if required.

road noise from A4280 and noise from industrial units immediately to south of road

Entire site falls within the boundary of a MSA.

The site is within flood zone 3 and is therefore not suitable for residential development. The site is not a preferred location for employment development because alternative sites are better located.