Call for Sites Form
No answer given
Land at Willington Garden Centre (Barford Road)
Part of Garden Centre
Residential properties and agricultural land on the north side of Barford Road
Garden Centre
Agricultural land
Residential
C 15 to 18
No answer given
20-25 dwellings per hectare having regard to the site
Mix, quantum and tenure split of any affordable housing to be determined by prevailing national and local planning policy in operation at the time of any allocation/planning application
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
The OS Location Plan provided demonstrates the length of road frontage access to the Barford Road to the north, as well as the current point of access which could be revised or altered to accommodate new development with ease
15 dwellings
No answer given
No answer given
No answer given
Dependent upon the planning position and timing of an allocation or planning permission – but within the timescale noted above. This should take 12 – 18 months to develop.
The proposed development will pro-actively respond to the climate emergency and climate change by seeking to reduce the resulting risks i.e. provision of sustainable drainage systems to prevent flooding from the outset, and high quality greenspace and biodiversity provision. The development itself will also seek to reduce greenhouse gas emissions from inception through the use of water and energy efficient designs, appliances and systems, aligned to a considered layout, fabric-first approach to insulation and the use of renewable energy technologies. The proposals will therefore accord with the requirements of Local Plan Policy 51S.
No uploaded files for public display
0.78
The site is part of the garden centre in Site 747. The site's proposed access point is off the south side of Barford Road. The proposal will intensify the use of the existing access as well as the site and the impact is on the immediate junction with Bedford Road/Sandy Road and Station Road. The nearest bus stops are located just on Bedford Road and Station Rd approximately 380m west of the site. There is no footway immediately outside the site along Barford Road. Barford Road from the west of the junction with Wood Lane is part of the Thatcher’s Way cycle route. Given that verges exist outside the site and opposite the site, there is scope to convert these to footway and/or widen the existing footway to a minimum of 2.0m. The junctions with Bedford Road/Sandy Road namely Wood Lane, Station Road and Barford Road also need to be improved for pedestrians and cyclists.
noise fom the garden centre would need to be considered
The site has been excluded from further assessment at Stage 1 because its location is not in accordance with the development strategy.