Call for Sites Form
Please Contact the Agent: Frazer Hickling
Land At Northampton Road, Bromham. 0.27 ha
Commercial – builder depot
Northampton Road
Residential
Paddock Land
Fields
8
No answer given
30 dwellings / ha
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
The site will use the existing access point off Northampton Road as indicated on the Site Location Plan.
8 dwellings
No answer given
No answer given
No answer given
2025
The proposed scheme will address climate change through appropriate adaptation and mitigation measures in the design. Where possible the dwellings will utilise low carbon building materials. The dwellings will be energy efficient and will be designed for comfort by balancing passive cooling design strategies which maximise comfort and minimise energy use during the warmer summers, with adequate levels of insulation for the warmer winters. The dwellings will be constructed so they are weather tight, robust enough to withstand extreme weather, and with foundations which are appropriate for their lifetime. The design will also include measures for water efficiency and effective drainage.
No uploaded files for public display
0.26
Adjacent to site 441. The site located north of Northampton Road and Grange Lane in the Bromham area approximately 3.5 miles west of Bedford town centre. Access from Northampton Road. Footways serve the site but are overgrown and need improvements, including a shared cycle and footway opposite the site. Bus stops in close proximity. Some congestion within Bridge End but scale of development would not exacerbate significantly. Clear footway on southern side of Northampton Road or provide crossing to northern footway which is in better condition. Upgrade of the bus facilities outside of the site. Potential marking on-street cycle lanes.
no noise concerns
The site has been excluded from further assessment at Stage 1 because its location is not in accordance with the development strategy.