Call for Sites Form
Please Contact the Agent:
Land West Of Church Road, Chapel End, Colmworth 12.1 ha
Agricultural
Residential / Fields
Church Road
Fields / Residential
Fields
Up to 150
No answer given
30 dph
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
Access will be provided off Church Road as indicated on the Site Location Plan
100 dwellings
No answer given
No answer given
No answer given
2027
The proposed scheme will address climate change through appropriate adaptation and mitigation measures in the design. Where possible the dwellings will utilise low carbon building materials. The dwellings will be energy efficient and will be designed for comfort by balancing passive cooling design strategies which maximise comfort and minimise energy use during the warmer summers, with adequate levels of insulation for the warmer winters. The dwellings will be constructed so they are weather tight, robust enough to withstand extreme weather, and with foundations which are appropriate for their lifetime. The design will also include measures for water efficiency and effective drainage.
No uploaded files for public display
12.10
Access will be onto Church Road which is sufficiently wide, straight, and has little traffic in the area. Bus stops within 100m but only approx. 4 services per day and there is no footway between the site and the village/bus stop. The existing pavement could be extended 70m to the edge of the site to connect the site with Chapel End village, bus stops, and several public footpaths. No cycle connectivity but quiet roads allow reasonable cycle access to St Neots. Pedestrian access is needed. There is a public footpath crossing the site linking to the nearby village but it crosses fields so is not ideal. An extension of approx 70m to the existing pavement on Church Rd would provide better, all-weather connectivity to the village and bus stops.
no noise concerns
The site has been excluded from further assessment at Stage 1 because its location is not in accordance with the development strategy.