Call for Sites Form

Form ID: 774

Other (please specify)

No answer given

Yes

Chelveston Renewable Energy Park, Chelveston Airfield, Chelveston cum Caldecott. 17 ha.

Map 1233
Show full map

Renewable energy park

Renewable energy park

Farmland

Farmland

Farmland/industrial

Yes

All other types

Employment

No answer given

Nothing chosen

No answer given

No answer given

Nothing chosen

No answer given

No answer given

Nothing chosen

No answer given

B1, B2 and B8

70,000 m2

No answer given

No answer given

No answer given

No answer given

No answer given

Renewable energy power generation; industrial, horticulture

Suitable access is achievable

Main entrance to renewable energy park immediately west of site

Yes

No

No

No

No answer given

No answer given

No answer given

No answer given

Immediate

Chelveston Renewable Energy Park already has a well-established and successful array of renewable energy technologies including wind power, photo-voltaics, battery storage and hydrogen manufacture along with complementary waste collection and transfer. The proposed allocation would allow further industrial development with energy provided from the Park’s own grid with vehicles powered by mixed hydrogen/diesel technology being developed on site. Further renewable energy technologies can also be deployed. Further employment opportunities can be developed but with vastly reduced carbon and energy footprints compared to conventional employment allocations.

No uploaded files for public display

17.66

Above

Site not in accordance with the emerging development strategy

Exclude from further assessment

Nothing chosen

Nothing chosen

x The site is not within or adjoining the urban area or a defined settlement policy area, or within the built form of a small settlement

xx A site accessibility score of 0 is recorded where 0 is more than 30 minutes’ walk.

xx A site accessibility score of 0 is recorded where 0 is more than 30 minutes’ walk.

xx There is no public transport within 10 minutes’ walk to enable access to a major employer

+ The site is not within or adjoining the air quality management area.

? The site is within the impact risk zone of an SSSI / National site network site

? Uncertain or insufficient information.

? Uncertain or insufficient information

0 The site is not within or adjoining the green infrastructure opportunity network or the impact of the proposal is neutral.

x Opportunity area for 3 or more ecosystem services covers 25-50% of the site.

0 No renewable energy generation scheme included and efficiency standards that meet normal standards.

x The site is not within or adjoining the urban area or a defined settlement policy area, or within the built form of a small settlement

xx A site accessibility score of 0 is recorded where 0 is more than 30 minutes’ walk.

xx A site accessibility score of 0 is recorded where 0 is more than 30 minutes’ walk.

xx There is no public transport within 10 minutes’ walk to enable access to a major employer.

x The proposal has the potential to cause harm to heritage assets. This harm may range from low to high. There may be options to avoid, reduce or mitigate this harm and where sites have not been ruled out altogether for other reasons, further assessment will be undertaken to more fully explore impacts on significance and options for harm reduction and mitigation. This further assessment may ultimately lead to the conclusion that the site should not be allocated.

+ Proposal includes permanent economic and employment opportunities.

0 Proposal does not include a main town centre use.

x The proposal does not include and is not within 400m walking distance of a publicly accessible open space.

x The proposal does not include and is not within 800m of a publicly accessible sports facility

? It is uncertain what effect the proposal is likely to have on the landscape / more information is required.

x The site is separated from a defined settlement policy area or the built form of a small settlement.

x The site is not previously developed land as defined in the NPPF.

+ The site is not on best and most versatile agricultural land as defined in the NPPF.

+ The site is not located in a source protection zone.

+ The site is within flood zone 1 (areas that have been shown to be at less than 0.1% chance of flooding in any year).

0 Residential development not proposed.

0 Residential development not proposed.

x The site is not within 800m of a facility where cultural or social activities can be accessed.

0 Neutral.

? Uncertain or insufficient information.

x The site is not within or adjoining the urban area or a defined settlement policy area, or within the built form of a small settlement

xx A site accessibility score of 0 is recorded where 0 is more than 30 minutes’ walk.

xx A site accessibility score of 0 is recorded where 0 is more than 30 minutes’ walk.

xx There is no public transport within 10 minutes’ walk to enable access to a major employer.

? Potential access requiring mitigation

+ No capacity issues

Access is onto unnamed road south of the site. This is single track and in a very poor condition. Land use will need to be considered regarding access improvements. No traffic in the area. There is a bus stop approx 1.2km away with 3 services per day. There is no pedestrian or cycle connectivity. Resurface and widen current access track to site. Include a pavement or footway to connect with Yelden.

Nothing chosen

employment proposed but should consider wind turbine noise for practicality of use

Site does not fall within the boundary of a MSA.

The site has been excluded from further assessment at Stage 1 because the allocation of such uses is not in accordance with the development strategy. Proposals will be considered against criteria based policies.