Call for Sites Form
No answer given
Chelveston Renewable Energy Park, Chelveston Airfield, Chelveston cum Caldecott. 17 ha.
Renewable energy park
Renewable energy park
Farmland
Farmland
Farmland/industrial
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
B1, B2 and B8
70,000 m2
No answer given
No answer given
No answer given
No answer given
No answer given
Renewable energy power generation; industrial, horticulture
Main entrance to renewable energy park immediately west of site
No answer given
No answer given
No answer given
No answer given
Immediate
Chelveston Renewable Energy Park already has a well-established and successful array of renewable energy technologies including wind power, photo-voltaics, battery storage and hydrogen manufacture along with complementary waste collection and transfer. The proposed allocation would allow further industrial development with energy provided from the Park’s own grid with vehicles powered by mixed hydrogen/diesel technology being developed on site. Further renewable energy technologies can also be deployed. Further employment opportunities can be developed but with vastly reduced carbon and energy footprints compared to conventional employment allocations.
No uploaded files for public display
17.66
Access is onto unnamed road south of the site. This is single track and in a very poor condition. Land use will need to be considered regarding access improvements. No traffic in the area. There is a bus stop approx 1.2km away with 3 services per day. There is no pedestrian or cycle connectivity. Resurface and widen current access track to site. Include a pavement or footway to connect with Yelden.
employment proposed but should consider wind turbine noise for practicality of use
The site has been excluded from further assessment at Stage 1 because the allocation of such uses is not in accordance with the development strategy. Proposals will be considered against criteria based policies.