Call for Sites Form
No answer given
Land at Church Field Yelden (part)
Agriculture
Residential
Agriculture
Church & Village Hall
Residential
70
No answer given
30 dwelling per Ha
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
Approximately one third of the site (1.25 Ha) laid out as POS
An area of POS, to enhance and compliment village amenities and protect the setting of the Church whilst providing new public access and view points from the POS
Main Access A onto Church Lane (which may require improvement) and the potential to create a Second Access B onto Spring Lane
70
No answer given
No answer given
No answer given
2026. On the basis of securing an allocation for development in an Adopted Plan in 2023, we would expect to secure an implementable planning consent and commence development on the site within 2 years from adoption ie. 2026
It is planned that this proposed development, if allocated, should be brought forward as an exemplar scheme, using the highest possible design standards, reflecting the village location and incorporating leading edge technologies, to maximise energy efficiency and property insulation, up to and beyond the current requirements of Part L of the Building Regulations
No uploaded files for public display
3.73
The site is located on the south side of Church Lane and on the west side of Spring Lane, in the village of Yelden approximately 14.5 miles north of Bedford town centre. There are two accesses to the site. One is in the northeast corner of the site by Church Lane and the other located in the southeast corner by Spring Lane. The closest bus stop is located 180m west from the site on High Street with low service frequency. There is no footway serving the site and cycling is possible only on-road. A Transport Assessment (TA) will be required to identify the impact of traffic in the network and in Church Lane/Spring Lane, Church Lane/High Street and Spring Lane/High Street junctions as well as satisfactory facilities for both pedestrians and cyclists. However, the width of both Church Lane and Spring Lane are very tight to be able to handle the additional traffic from the potential development.
potential noise from farm
The site has been excluded from further assessment at Stage 1 because its location is not in accordance with the development strategy.