Call for Sites Form
Please contact the agent: Shannon Hubbard, Robinson & Hall.
Land at Hill Farm, Chellington (Land to the south of Hill Farm, east of Felmersham Road) 2.2 ha
Hill Farm & Agricultural Land
Hill Farm & Agricultural Land
Agricultural Land & Village of Carlton
Agricultural Land
Felmersham Road & Agricultural Land
20-25 dwellings
No answer given
A low density of 9-11 dwellings per hectare has been assumed at the site, taking into consideration its location adjacent to Hill Farm and to the north of the village of Carlton. Development at the site will front onto Felmersham Road to the west in a linear form to ensure limited impact on the surrounding countryside.
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
As shown on the accompanying site location plan, there are two existing access points to the north and south of the site’s boundary with Felmersham Road. These accesses are safe and would serve as suitable to any future development at the site.
20 to 25
No answer given
No answer given
No answer given
Start: Late 2024 Completion: Early 2027. It is anticipated that the site could come forward for development shortly after the adoption of the Plan. Given the size of the proposals the site and given that it is in a single ownership, development could be built out in a single phase or phased basis and completed within two and a half years.
Any scheme at the site shall be accompanied by a sustainable urban drainage strategy to mitigate against any potential future flood risk and seek to reduce greenhouse gas emissions throughout both the construction and operational phases of the development. Renewable energy will be considered as part of the detailed design process of the proposed dwellings.
No uploaded files for public display
2.53
Access onto Felmersham Road - no access exists currently but wouldn't have any problems adding. There is some light traffic in the area but the size of this development is unlikely to worsen it. 1 bus service per hour in each direction (Bedford-Rushden, bus 25). Pedestrian access does not exist but could be facilitated by crossing Felmersham Road, then using public footpath down driveway of The Chellington Centre, past the sewage works and into Carlton village. Cycle connectivity also does not exist but could be improved by extending the 30mph speed limit of Carlton village. For pedestrian connectivity: suggest a marked pedestrian courtesy crossing on Felmersham Rd to connect the site to the public footpath to Carlton starting from The Chellington Centre driveway. For cycle connectivity: suggest extending 30mph speed limit along Felmersham Rd between Carlton and the site. Also look at redesignating the paved footpath between Carlton and Harrold as a pedestrian/cycle path to improve connectivity to Harrold.
no noise concerns
The site has been excluded from further assessment at Stage 1 because its location is not in accordance with the development strategy.