Dags Lane, Riseley, Bedford, MK44 1EH
Agriculture
Farmland
Residential
Residential
Farmland
60-70 dwellings
Stater homes for young people
24 to 29 dph
Starter homes for young people
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
0.2 ha
Medical Centre, allotments, Community Hub, or something the residents of the village would like or something that would enhance village life.
Access to Dag Lane is Via Rotten Row or Gold Street. There could be an additional access created via Kings Close, where all services (Water etc.) are capped off and available to be extended.
X
X
No answer given
No answer given
The site is available, therefore no reason for any delays if planning is granted.
We value our environment and would like to maintain the thriving environmental success of the local area. Our aim is to do this for the short and the long term. We can achieve this by utilising; :Considerate Constructors :Sustainable Materials :Efficient use of resources :Utilising modern technology and methods :Ensuring good internet service :Capacity to charge electric vehicles :Conserve and enhance the natural environment and landscape :Site is adjoining defined settlement area within the village :Site is outside the flood risk zone : Primary School is approx. 12 minutes’ walk :Convenience store is 10 minutes’ walk :Bus Stop with regular service is 5 minutes’ walk : Good access to Highways, A6 approx. 3 miles :Within 350m of Public Sports Field with children’s play area : Within 400m of pocket park/open space : Gastro Pub is 5 Minute walk :Café 12 minute walk
No uploaded files for public display
2.66
The site is located on the west side of Church Lane in the village of Riseley, approximately 10.0 miles north of Bedford town centre. There are two possible access point, the first one west of Kings Close and the second one north of Dag Lane. The closest bus stop is located 500m south of the site on High Street. There is a 1.5m footway on the other side of the Kings Close but none serving the site. Dag Lane also has a footway of approx 2.0m. Cycling is feasible onroad. A Transport Assessment will be required to identify the impact of traffic on Kings Close, Dag Lane and on King Close/Church Lane and Dag Lane/Gold Street/Rotten Row junctions. The proposal will require a road constructed to adopted standards in accordance with Bedford Borough Council's highway standards. This includes accommodating the carriageway/footway widths and the required radius kerbs. Introduction of a footway and/or a more formal crossing to tie into existing footway provision.
no noise concerns
The site has been excluded from further assessment at Stage 1 because its location is not in accordance with the development strategy.