Call for Sites Form
Please contact the agent: Robinson & Hall LLP
Land to the North of Church End, Renhold
Agricultural
Agricultural Land, Woodland & Residential Dwelling
Church End & Residential Development
Woodland & Residential Development
Agricultural
10 - 15
No answer given
A medium density of 18-12 dwellings per hectare has been assumed at the site.
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
As shown on the accompanying site location plan, access could be obtained from Church End to the south of the site. This is an existing access that would require improvement as it is currently a field access, but access is considered as achievable into the site.
10 - 15
No answer given
No answer given
No answer given
Start: Late 2024 Completion: Early 2027. It is anticipated that the site could come forward for development shortly after the adoption of the Plan. Given the size of the proposals the site and given that it is in a single ownership, development could be built out in a single phase or phased basis and completed within two and a half years.
Any scheme at the site shall be accompanied by a sustainable urban drainage strategy to mitigate against any potential future flood risk and seek to reduce greenhouse gas emissions throughout both the construction and operational phases of the development. Renewable energy will be considered as part of the detailed design process of the proposed dwellings.
No uploaded files for public display
0.72
The site is located north of Church End in the village of Renhold approximately 4 miles northeast of Bedford town centre. Access could be obtained from Church End to the south of the site. The development could contribute to moderate existing traffic problems in Church End. The closest bus stop is approximately 200m west of the site. The frontage of the site on Church End has a footway of 1m and cycling is possible only by using the road. The existing access from Church End would require improvement. Improve footways provision along site frontage for pedestrians and consider marking on-street cycle lanes along Church End.
no noise concerns
The site has been excluded from further assessment at Stage 1 because its location is not in accordance with the development strategy.