Call for Sites Form
No answer given
Land at Struttle End, Ravensden (West of Oldways Road/Ravensdon Road) MK44 2RH
Agricultural – Arable
Oldways Road & Agricultural Land
Residential Development & Agricultural Land
Ravensdon Road & Agricultural Land
Agricultural land
30-40 dwellings
No answer given
A low density of 7-9 dwellings per hectare has been assumed, utilising the frontage of the site for the proposed dwellings and considering the surrounding built form and character area along Ravensdon Road to the south west.
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
As shown on the accompanying location plan, access can be gained into the site via Ravensden Road to the east. There is an existing access drive leading to Struttle End Farm. Alternatively, a new access could be provided into the site to protect existing amenity.
20-30
No answer given
No answer given
No answer given
The site has immediate and convenient access to Bedford and its associated wide range of services, amenities, employment opportunities and public transport links. Development of the site can commence shortly after the adoption of the Plan with an anticipated start in 2024 and completion by 2030.
Any scheme at the site shall be accompanied by a sustainable urban drainage strategy to mitigate against any potential future flood risk and seek to reduce greenhouse gas emissions throughout both the construction and operational phases of the development. Renewable energy will be considered as part of the detailed design process of the proposed dwellings.
No uploaded files for public display
4.34
The site is located on the southwest side of Ravensden Road in the village of Ravensden approximately 3.8 miles north of Bedford town centre. Access to the site is feasible directly from Ravensden Road. There is no traffic congestion on Ravensden road. The closest bus stop is located approximately 350m south of the site. There are no footways serving the site, nor formal cycle connections. Cycling is feasible on-road. A Transport Assessment will be required to identify the impact of traffic and satisfactory facilities for both pedestrians and cyclists. Provide connection to footways 150m to the south along Ravensden Rd.
no noise concerns
The site has been excluded from further assessment at Stage 1 because its location is not in accordance with the development strategy.