Call for Sites Form
Please contact the agent: Shannon Hubbard
Land to the West of A1, Duloe
Agricultural – Arable
B645 Road & Agricultural Land
Agricultural Land
Residential Development/St Neots
Agricultural Land
400-450 Dwellings
No answer given
Medium density of 26-30 dwellings per hectare.
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
An existing access is located as shown on the accompanying plan reference 48126/02/B and provides an access into the site from the B645 to the north.
150-200
200-450
No answer given
No answer given
This site is put forward within this representation for 400-450 dwellings and due to its size, will need to be built out on a phased basis. It is anticipated that development could start at the site in late 2025 and will be completed by 2033.
Any scheme at the site shall be accompanied by a sustainable urban drainage strategy, considering its partial location within Flood Zone 2 and seek to reduce greenhouse gas emissions throughout both operational and construction phases of development. Renewable energy will be considered as part of the design process of the proposed dwellings such as solar panelling on the roofs of dwellings.
No uploaded files for public display
17.59
Access from B645 Road frontage. Various bus services run to Savile's Close stop some 650m east of the site. The site has a shared footway/cycleway along its frontage on the northern side of the B645, this forms part of route 12/51 on the National Cycle Network. Implementing a crossing to the existing shared footway on the north side of the B645. Proximity to existing A1 slip junction may require moving the site access further west along B645.
noise from A1
The site has been excluded from further assessment at Stage 1 because its location is not in accordance with the development strategy.