Call for Sites Form
No answer given
Mollivers Oakley Road Bromham Bedfordshire
Agricultural
No answer given
No answer given
No answer given
No answer given
500+
No answer given
35 dph
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
School site for Lower or Upper Reservoir velodrome or skate park
1.School site 2.Reservoir 3.Velodrome/skate park
No answer given
Yes
No answer given
No answer given
No answer given
2020/21
We would look to meet or exceed the energy standards set out on the building regulations as expressed in section 51s in the local plan. We would achieve this by utilising renewable energy sources such as solar and wind, as well as installing ground source heat pumps and additional water saving measures. In Addition to these measures ensuring that the dwellings are very well insulated throughout will further reduce the carbon footprint.
No uploaded files for public display
23.95
The site is located west of Oakley Road and Church Lane north of Bromham area approximately 4 miles northwest of Bedford town centre. Access to the site is feasible from Oakley Road, which is a 40mph road along the frontage of the site. Oakley Road and the junction with Park Road/Church Lane/Oakley Road experience some moderate congestion and this scale of development could exacerbate any issues. The closest bus stop is located approximately 400m south of the site. There are no footways or formal cycle lanes outside of the site. A Transport Asssessment would be needed to assess the impact of the development on the highway network, especially on Oakley Road and on the Park Road/Church Lane/Oakley Road junction, and recommend satisfactory facilities for both pedestrians and cyclists. Given the number of homes proposed, it is likely that more than one access point will be necessary off Oakley Road. The proposal will require roads to adoptable standards in accordance with Bedford Borough Council's highway standards in terms of accommodating the carriageway/footway widths and the required radius kerbs. Potential signalisation of the junction of Park Road/Church Lane/Oakley Road would be necessary to mitigate the traffic increase. Potential reduction of the speed limit of Oakley Road along the frontage of the site to 30mph.
no noise concerns
The site has been excluded from further assessment at Stage 1 because its location is not in accordance with the development strategy.