Call for Sites
Search form responses
Results for Brightman Brothers search
New searchNo answer given
Cobholden Farm Bushmead Road Eaton Socon PE19 8JD (120.207ha)
Arable farm
Agricultural
Substation
A1 and Eaton Socon
Agricultural
Not known
Care homes
Not known
Care homes
No answer given
No answer given
B1, B2 and B8
Not known
A1,A2,A3,A4 &A5
Not known
Not known
No answer given
Not known
D1 & D2
See access points on location map Adopted road access via Bushmead Road, Staploe Road and possibly from A1.
No answer given
X
No answer given
No answer given
2030
Climate emergency declared in 2019 with an objective of being Carbon neutral by 2030, adopting sustainability projects, ie solar projects, oil to gas conversion ,lighting upgrades, cooling component insulation, loft insulation, electric charging stations, electric tramways.
No uploaded files for public display
120.62
Access from Bushmead Road or Staploe Road, level difference and bridge to the east over the A1 may prevent mitigation works to construct a new access and provide footways on Bushmead and Staploe. Bus stops are available to the east under 400m although these currently have poor service frequency, stops within 1km have twice hourly services on the Great North Rd. Bushmead Rd forms part of National Cycle Network and provides a low traffic route into Eaton Socon. (As per site 931) Implement footway on Bushmead Rd and or a crossing to tie into existing footway over the bridge to the east. Footway would also have to be implemented further east of the bridge to tie into the existing footway adjacent to Monarch Rd. Footway on bridge to be widened (As per site 931)
predominantly noise from A1 but commercial noise on proposed devlopment could affect proposed and existing
The site has been excluded from further assessment at Stage 1 because its location is not in accordance with the development strategy. This is not a preferred location for an employment site as it does not relate well to existing settlements and it would be intrusive.