Call for Sites
Search form responses
Results for Swan Print Ltd search
New searchNo answer given
Swan Works Box End Road Bromham Beds, MK43 8LT
Industrial Buildings/Car Wash
Road/housing
Field
Road
Field
8
No answer given
11.5
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
There are currently 4 access points used to enter the site
1-5 yrs
No answer given
No answer given
No answer given
2025
We intend to focus on using self-build houses that pay attention to sustainable design features from charging points for electric vehicles and to provide more bike storage areas. To investigate house building that incorporates where possible materials made from recycled materials. Look at having rooftops and drainage systems capable of harvesting recycled rainwater. To considering a building’s lifecycle at the development stage, by investigating how to implement measures to lower its environmental impacts over its lifetime and adapting these over time to optimise its efficiency and decrease its carbon footprint.
No uploaded files for public display
No answer given
Mo objections subject to provision of: - access to acceptable standards including visibility splays - improvements to pedestrian route into Bromham - testing of Box End Rd / Bromham bypass slip road junction
adjacent site would need to be considered
The site has been excluded from further assessment at Stage 1 because its location is not in accordance with the development strategy.
No answer given
Swan Works Box End Road Bromham Beds, MK43 8LT
Industrial Building/Waste grassland
Road/housing
Field
Road
Field
105
No answer given
30
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
There are currently 5 access points used to enter the site
1-5 yrs
No answer given
No answer given
No answer given
2025
We intend to focus on using house builders that pay attention to sustainable design features from charging points for electric vehicles and to provide more bike storage areas. To investigate house building that incorporates where possible materials made from recycled materials. Look at having rooftops and drainage systems capable of harvesting recycled rainwater. To considering a building’s lifecycle at the development stage, by investigating how to implement measures to lower its environmental impacts over its lifetime and adapting these over time to optimise its efficiency and decrease its carbon footprint.
No uploaded files for public display
4.09
The site located in Box End Road in Bromham, approximately 3.8 miles from the Bedford city centre. The proposed development will be accessed via Box End Road which has a 30mph speed limit. The closest bus stop located in the north of the site, around 450m away. There is a footway of 1m on Box End Road, but there is not any the formal cycleways way serving the site. A Transport Assessment (TA) will be required to identify the impact of traffic and for satisfactory facilities for both pedestrians and cyclists. Given the proposal, a road to adoptable standards is required in accordance with Bedford Borough Council's highway standards. Demolition of the current properties on the site will be needed.
adjacent site would need to be considered
The site has been excluded from further assessment at Stage 1 because its location is not in accordance with the development strategy.