Call for Sites
Search form responses
Results for Town Planning Services search
New searchAgent for agent: Please Contact: Chris Green, Town PLanning Serivces, Sharnbook.
Land south of Goldington Road, Bedford, MK41 0HY 9.44 ha
Vehicle repair workshops of approximately 930sqm, storage of motor vehicles, storage and distribution on c.0.75 hectares.
Employment
Open countryside
Residential
Retail, commercial and open space
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
B1, B2 and B8
21,500
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
The site would gain vehicular access off the exiting roundabout with Goldington Road and Norse Road. This is shown on the Master Plans accompanying the submission
Yes
No answer given
No answer given
No answer given
2023
A flood risk assessment has been prepared for the site which shows that a Sustainable Urban Drainage System can be used and that there is sufficient attenuation available, including +40% allowance for climate change. There is also potential to include significant environmental and landscape enhancements to the south of the site.
9.41
There is an existing but largely unused exit on the roundabout north of the site which is the proposed access. This would require minimal work to the existing road and will provide an efficient and safe access point. There is moderate traffic congestion on some local roads, however the main arterial roads serving the development (the A4280 and A421) have some congestion. There are bus stops within 100m where the number 5 bus provides five5 services per hour to Bedford, and the 905 bus provides a half hourly service to Cambridge. There is currently no pedestrian connectivity, a crossing across the A4280 would be needed to access the existing shared footpath/cycle path there. Improve pedestrian access to the existing bus stops - this should at least include a pavement from the site entrance to the westbound stop, and a crossing across the A4280 to access the eastbound stop. Also provide cycle connectivity to shared path on the opposite side of A4280.
road noise from A4280 and noise from industrial units immediately to south of road
The site adjacent to the urban area and is suitable for allocation for office, industrial, warehousing and distribution uses. A design code will need to be prepared to reflect this gateway location. Development of the site should also contribute to the River Valley Park (ADLP Policy 26) and take account of the historic environment. A biodiversity report and Transport Assessment will also be required. Appropriate links provided to the existing pedestrian and cycle network will be important. Early consultation with Anglian Water is required to ensure connection to water infrastructure network. Site is proposed for allocation EMP4 Land south of Goldington Road, Bedford.