Call for Sites

Search form responses

Results for Q.T. Adventure Playgrounds Ltd search

New search New search
Form ID: 435

Land owner

No answer given

N/A

Thurleigh Farm Centre Cross End Thurleigh Bedfordshire MK44 2EE

Map 1233

Disused open farm/children's' activity centre

No answer given

No answer given

No answer given

Residential Properties

Yes

Housing

Nothing chosen

9-11

Family houses

No answer given

No answer given

Market housing - Owner occupied , Affordable Housing - Shared ownership

No answer given

No answer given

Nothing chosen

No answer given

No answer given

No answer given

No answer given

No answer given

No answer given

No answer given

No answer given

No answer given

Suitable access is achievable

There is an existing vehicular access from Cross End which would be suitable for the development

Yes

No

No

No

9-11

No answer given

No answer given

No answer given

Subject to obtaining planning consent we would expect the development to start within one year post adoption and for the development timescale to be less than a year

The houses would be constructed incorporating solar panels and rainwater reuse drainage systems - they would access their heat through a community biomass burner and or air source/ground source heat pumps.

No uploaded files for public display

1.56

Above

Site not in accordance with the emerging development strategy

Exclude from further assessment

Nothing chosen

Nothing chosen

x The site is not within or adjoining the urban area or a defined settlement policy area, or within the built form of a small settlement

xx A site accessibility score of 0 is recorded where 0 is more than 30 minutes’ walk.

x A site accessibility score of 4 is recorded where 4 is 21 – 30 minutes’ walk.

x The site is within 10 minutes’ walk of a bus stop with an infrequent bus service (less frequent than hourly each day) which enables travel 8am6pm Monday to Friday to a major employer.

+ The site is not within or adjoining the air quality management area.

x The site is within or adjoining a site of nature conservation importance

x Protected species could be affected.

? Uncertain or insufficient information

0 The site is not within or adjoining the green infrastructure opportunity network or the impact of the proposal is neutral.

++ Opportunity area for fewer than 3 ecosystem services.

0 No renewable energy generation scheme included and efficiency standards that meet normal standards.

x The site is not within or adjoining the urban area or a defined settlement policy area, or within the built form of a small settlement

xx A site accessibility score of 0 is recorded where 0 is more than 30 minutes’ walk.

x A site accessibility score of 4 is recorded where 4 is 21 – 30 minutes’ walk.

x The site is within 10 minutes’ walk of a bus stop with an infrequent bus service (less frequent than hourly each day) which enables travel 8am6pm Monday to Friday to a major employer.

x The proposal has the potential to cause harm to heritage assets. This harm may range from low to high. There may be options to avoid, reduce or mitigate this harm and where sites have not been ruled out altogether for other reasons, further assessment will be undertaken to more fully explore impacts on significance and options for harm reduction and mitigation. This further assessment may ultimately lead to the conclusion that the site should not be allocated.

0 Proposal is not employment related.

0 Proposal does not include a main town centre use.

x The proposal does not include and is not within 400m walking distance of a publicly accessible open space.

x The proposal does not include and is not within 800m of a publicly accessible sports facility

? It is uncertain what effect the proposal is likely to have on the landscape / more information is required.

xx The site is more than 0.5 miles from a defined settlement policy area or the built form of a small settlement.

+ All or a majority of the site is previously developed land as defined in the NPPF.

x All or a majority of the site is best and most versatile agricultural land as defined in the NPPF.

+ The site is not located in a source protection zone.

+ The site is within flood zone 1 (areas that have been shown to be at less than 0.1% chance of flooding in any year).

+ The site is likely to provide a mix of housing and include affordable housing.

x The development will not meet identified needs eg elderly, care, travellers.

x The site is not within 800m of a facility where cultural or social activities can be accessed.

0 Neutral.

+ The development is likely to increase public surveillance or increase activity.

x The site is not within or adjoining the urban area or a defined settlement policy area, or within the built form of a small settlement

xx A site accessibility score of 0 is recorded where 0 is more than 30 minutes’ walk.

x A site accessibility score of 4 is recorded where 4 is 21 – 30 minutes’ walk.

x The site is within 10 minutes’ walk of a bus stop with an infrequent bus service (less frequent than hourly each day) which enables travel 8am6pm Monday to Friday to a major employer.

+ No access constraints

+ No capacity issues

The site is located north of Cross End Road in the village of Thurleigh approximately 8 miles north of Bedford town centre. There is an existing vehicular access from Cross End which would be suitable for the development. No significant congestion in the vicinity and the proposal would not cause significant problems. The nearest bus stop is located 750m west from the site on Cross End Road. There are no footways serving the site and mitigation to connect to nearby footways is not feasible given distance and number of dwellings proposed. Also no cycle access, and Cross End does not appear to be cycle friendly. Footway connectivity not feasible given the scale of the development and the distance from other footways.

Nothing chosen

no noise concerns

Site does not fall within the boundary of a MSA.

The site has been excluded from further assessment at Stage 1 because its location is not in accordance with the development strategy.

For instructions on how to use the system and make comments, please see our help guide.