Call for Sites
Search form responses
Results for Willington Garden Centre search
New searchNo answer given
Land at Willington Garden Centre (Sandy Road)
Part of Garden Centre
Agricultural
Highway (Sandy Road)
Residential (No. 25 Sandy Road)
Garden Centre
C 32 (+)
No answer given
25 dwellings (minimum) per hectare having regard to the site context
Mix, quantum and tenure split of any affordable housing to be determined by prevailing national and local planning policy in operation at the time of any allocation/planning application
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
The OS Location Plan provided demonstrates the length of road frontage access to the Sandy Road to the south, plus 2 points of potential access from land to the west.
32 dwellings
No answer given
No answer given
No answer given
2025
The proposed development will pro-actively respond to the climate emergency and climate change by seeking to reduce the resulting risks i.e. provision of sustainable drainage systems to prevent flooding from the outset, and high quality greenspace and biodiversity provision. The development itself will also seek to reduce greenhouse gas emissions from inception through the use of water and energy efficient designs, appliances and systems, aligned to a considered layout, fabric-first approach to insulation and the use of renewable energy technologies. The proposals will therefore accord with the requirements of Local Plan Policy 51S.
No uploaded files for public display
1.26
The site is located at the eastern side of the Garden Centre on the north side of Sandy Road in the village of Willington approximately 4.5 miles east of Bedford town centre. The site fronts onto Sandy Road and access is proposed here, but there is no existing access to the site. The proposal will intensify the use of the site and impact on Sandy Road at the access point as well as the immediate junction with Bedford Road/Sandy Road and Station Road. The distance from the site to nearest bus stops is approximately 350m. There is a footway of approximate width of 1.0m with verge of 1m width outside the site. Barford Road from the west of the junction with Wood Lane is part of the Thatcher’s Way cycle route. A Transport Statement will be required to identify the impact of development on the highway with mitigation measures, focussing on the safety impact on nearby junctions. Footways along Sandy Rd should be widened and a crossing provided. On street cycle connectivity could be marked along Sandy Road to connect to the Thatcher's Way cycle route.
noise from garden centre would need to be considered
The site has been excluded from further assessment at Stage 1 because its location is not in accordance with the development strategy.
No answer given
Land at Willington Garden Centre (Barford Road)
Part of Garden Centre
Residential properties and agricultural land on the north side of Barford Road
Garden Centre
Agricultural land
Residential
C 15 to 18
No answer given
20-25 dwellings per hectare having regard to the site
Mix, quantum and tenure split of any affordable housing to be determined by prevailing national and local planning policy in operation at the time of any allocation/planning application
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
The OS Location Plan provided demonstrates the length of road frontage access to the Barford Road to the north, as well as the current point of access which could be revised or altered to accommodate new development with ease
15 dwellings
No answer given
No answer given
No answer given
Dependent upon the planning position and timing of an allocation or planning permission – but within the timescale noted above. This should take 12 – 18 months to develop.
The proposed development will pro-actively respond to the climate emergency and climate change by seeking to reduce the resulting risks i.e. provision of sustainable drainage systems to prevent flooding from the outset, and high quality greenspace and biodiversity provision. The development itself will also seek to reduce greenhouse gas emissions from inception through the use of water and energy efficient designs, appliances and systems, aligned to a considered layout, fabric-first approach to insulation and the use of renewable energy technologies. The proposals will therefore accord with the requirements of Local Plan Policy 51S.
No uploaded files for public display
0.78
The site is part of the garden centre in Site 747. The site's proposed access point is off the south side of Barford Road. The proposal will intensify the use of the existing access as well as the site and the impact is on the immediate junction with Bedford Road/Sandy Road and Station Road. The nearest bus stops are located just on Bedford Road and Station Rd approximately 380m west of the site. There is no footway immediately outside the site along Barford Road. Barford Road from the west of the junction with Wood Lane is part of the Thatcher’s Way cycle route. Given that verges exist outside the site and opposite the site, there is scope to convert these to footway and/or widen the existing footway to a minimum of 2.0m. The junctions with Bedford Road/Sandy Road namely Wood Lane, Station Road and Barford Road also need to be improved for pedestrians and cyclists.
noise fom the garden centre would need to be considered
The site has been excluded from further assessment at Stage 1 because its location is not in accordance with the development strategy.
No answer given
Willington Garden Centre (whole site)
Garden Centre
Please see 1:2,500 OS plan enclosed with this form demonstrating highways frontage and site boundaries
Highway and residential to part of southern boundary
Residential
Residential
C 125 +
No answer given
25 dwellings (minimum) per hectare having regard to the site context
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
The OS Location Plan provided demonstrates long frontage access to the Sandy Road to the south (in excess of 230m frontage), plus 2 points of access (both existing) to the Barford Road to the north serving the existing site and use.
No answer given
Potentially circa 30 dwellings per year for 3 years – timing as per answer above
No answer given
No answer given
2029
The proposed development will pro-actively respond to the climate emergency and climate change by seeking to reduce the resulting risks i.e. provision of sustainable drainage systems to prevent flooding from the outset, and high quality greenspace and biodiversity provision. The development itself will also seek to reduce greenhouse gas emissions from inception through the use of water and energy efficient designs, appliances and systems, aligned to a considered layout, fabric-first approach to insulation and the use of renewable energy technologies. The proposals will therefore accord with the requirements of Local Plan Policy 51S.
No uploaded files for public display
5.01
Includes sites 747 and 749 above. The site fronts onto both Barford Road and Sandy Road and there are existing private accesses off Barford Road towards the west but with limited existing accesses along Sandy Road. The proposal will intensify the use of Barford Road which has moderate traffic congestion at peak times and the impact is at the immediate junction with Bedford Road/Sandy Road. The nearest bus stops are located approximately 300m to the west of the site. There is a footway of approximate width of 1.2m with varying width of verge behind footway on the opposite side and from southwest from the property no. 23 Barford Road up to the junction with Station Road. There is no footway immediately outside the site along Barford Road and there are no footways either along Sandy Road. Barford Road from the west of the junction with Wood Lane is part of the Thatcher’s Way cycle route. The position of the access off Barford Road need to be identified so that the required sight lines on both sides of the access can be achieved together with sufficient spacing between opposite and adjacent junction from existing accesses/junctions. Given the scale of the development, a Transport Assessment will be required to identify the impact of development on the highway with mitigation measures. Footways on Barford Road should be improved, and better pedestrian access should be implemented at the junctions with Bedford Road/Sandy Road.
no noise concerns
The site has been excluded from further assessment at Stage 1 because its location is not in accordance with the development strategy.
Please Contact the Agent: Frazer Hickling
Land At Northampton Road, Bromham. 0.27 ha
Commercial – builder depot
Northampton Road
Residential
Paddock Land
Fields
8
No answer given
30 dwellings / ha
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
The site will use the existing access point off Northampton Road as indicated on the Site Location Plan.
8 dwellings
No answer given
No answer given
No answer given
2025
The proposed scheme will address climate change through appropriate adaptation and mitigation measures in the design. Where possible the dwellings will utilise low carbon building materials. The dwellings will be energy efficient and will be designed for comfort by balancing passive cooling design strategies which maximise comfort and minimise energy use during the warmer summers, with adequate levels of insulation for the warmer winters. The dwellings will be constructed so they are weather tight, robust enough to withstand extreme weather, and with foundations which are appropriate for their lifetime. The design will also include measures for water efficiency and effective drainage.
No uploaded files for public display
0.26
Adjacent to site 441. The site located north of Northampton Road and Grange Lane in the Bromham area approximately 3.5 miles west of Bedford town centre. Access from Northampton Road. Footways serve the site but are overgrown and need improvements, including a shared cycle and footway opposite the site. Bus stops in close proximity. Some congestion within Bridge End but scale of development would not exacerbate significantly. Clear footway on southern side of Northampton Road or provide crossing to northern footway which is in better condition. Upgrade of the bus facilities outside of the site. Potential marking on-street cycle lanes.
no noise concerns
The site has been excluded from further assessment at Stage 1 because its location is not in accordance with the development strategy.