Call for Sites
Search form responses
Results for Landcrest Developments Ltd search
New searchLand Promoter
Land East of Oakley Road, Bromham (adjacent to no. 52 Oakley Road).
Agricultural field.
agricultural fields
existing housing
agricultural fields
Oakley Road and agricultural fields beyond it
80
No answer given
22
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
Access would be in the form of a new priority junction with Oakley Road
80
No answer given
No answer given
No answer given
It is assumed that planning permission would be secured within 12 months of an allocations and the size of the site is such that it would only take 12 – 18 months to build in the current market.
• Helping to reduce the urban heat island effect by planning green space and using appropriate shade when locating the development; • Using flood prevention/mitigation techniques including landscape features such as ponds. The Surface Water Drainage Strategy will include an allowance for climatic change; • Reducing the ratio of building height to the spacing between buildings to have a positive effect on natural ventilation; • Including green roofs and walls to insulate against heat gains, absorb rainfall and provide (for roofs) useable outdoor space as well as improving the external environment; • Including provision of greenery, such as vertical gardens, climbers and green roofs on the building envelope to help ameliorate the heat gains in summer; • Planting deciduous trees to provide shade in summer, while permitting solar gain in winter when it is useful; • Inclusion of larger floor-to-ceiling heights in buildings to help in allowing later addition of any cooling mechanisms. In addition, higher ceilings also trap hot air above the heads of people using the room, making the room feel cooler and negating the need for A/C, fans, etc.; • Using permeable paving anywhere that loadings will not cause structural failure. • Providing a rainwater collection system/grey-water recycling for watering gardens and landscaped areas; • Using surface treatments which reflect heat in summer, such as light coloured block-paving or render on buildings; • Incorporating electric vehicle charging points in new developments • Ensuring effective orientation and layout to maximise solar-passive strategies; • Adding or increasing insulation levels and using well-designed, climate-appropriate, insulation solutions • Using appropriate glazing and window styles for climate (e.g. low U-value; high solar heat gain coefficient in cold climates and low in warmer climates); • Sizing and orientating windows to minimise summer heat gains and maximise winter solar gains; • Using renewable energy such as solar thermal, PV or heat pumps.
3.56
The site is located east of Oakley Road in the Bromham area approximately 4 miles west of Bedford town centre. Access to the site is feasible from Oakley Road, which is a 30mph road. The potential development could cause significant problems for congestion on the local road network. The closest bus stop is located 350m south of the site. There are no footways or formal cycleways serving the site. Cycling is possible by using the road surface. A Transport Asssessment would be needed to assess the impact of the development on the highway network. Improvement of pedestrian and cycle access would be needed - provision of a footpath and on road cycle markings along Oakley Road.
no noise concerns
The site has been excluded from further assessment at Stage 1 because its location is not in accordance with the development strategy.