Bedford Borough Local Plan 2040 Plan for Submission

Representation ID: 10258

Received: 29/07/2022

Respondent: Central Bedfordshire Council

Representation Summary:

8. Transport Strategy
8.1 CBC considers that mirroring the 5 point Plan of Action and Principles from the EEH Transport strategy is sensible and supports aligned action across the EEH area. The stepped trajectory approach is wise when there are many external factors influencing the delivery of critical infrastructure, many of which will either not be complete until at least 2030 or their certainty level is still unknown.
8.2 However, whilst a stepped approach is supported, it is noted that with the higher development rates in the second half of the plan period from 2030 onwards, there will be limited scope to bring forward sites to address any shortfall which may arise in the early years of the plan. CBC consider that contingency sites should be identified to maintain housing delivery in the event that the large strategic sites planned at the end of the plan period do not materialise.