Object

Site Assessment Pro Formas

Representation ID: 3602

Received: 15/08/2021

Respondent: Mr mark sugars

Representation Summary:

This Site is undeveloped agricultural land,most is designated as flood zone 3 and 2 and floods on a regular basis. Any additional housing on this site will compound the existing problem of flooding and sewage overspill. During the flooding in Dec 2020 Road was closed along the entirety of the site for 24hrs
The site adjoins an operational railway compound which is used 24/7
Road is very busy at school drop off and pick up times make the road difficult to pass solid line of parked cars The site will be difficult and dangerous to enter/exit.
Wymington has no amenities