Representation Summary:

The site at Dennybrook expanded by around 25% after the call for sites closed to engulf the hamlets of Honeydon and Begwary. Residents were informed only 8 months after the call for sites closed about this expansion which left only 4 weeks for them to consider this and seek advice before the consultation on the Draft Local Plan opened. Duloe Field (site 3420) was also submitted after the deadline. I do not believe sites submitted after the deadline should be considered and certainly not very large sites submitted 8 months after the deadline.

Full text:

The site at Dennybrook expanded by around 25% after the call for sites closed to engulf the hamlets of Honeydon and Begwary. Residents were informed only 8 months after the call for sites closed about this expansion which left only 4 weeks for them to consider this and seek advice before the consultation on the Draft Local Plan opened. Duloe Field (site 3420) was also submitted after the deadline. I do not believe sites submitted after the deadline should be considered and certainly not very large sites submitted 8 months after the deadline.