Local Plan 2040 Draft Plan - Strategy options and draft policies consultation

Representation ID: 7162

Received: 17/09/2021

Respondent: Davison & Co (Barford) Ltd

Agent: Phillips Planning Services

Representation Summary:

Paragraph 3.5 infers that additional growth will not be delivered until infrastructure relating to the Black Cat junction and the East West section are complete. However, this is unrealistic and fails to meet the required need of the step change in delivery at the point of adoption. Growth needs to be planned for in a manner which starts to deliver at the point of adoption, and the strategy needs to deliver a range of sites in a range of locations to meet the need. Strategic Infrastructure development will progress at its own pace and will emerge in parallel with the delivery of new housing and employment opportunities.