Call for Sites Form
Please contact the agent: Cerda Planning Ltd.
New Road, Great Barford 2.25 ha
Agricultural
Residential
Residential
Countryside
Residential
74
No answer given
32 DPH
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
Please see attached illustrative masterplan.
74
No answer given
No answer given
No answer given
2024
Promotion of the site and any subsequent planning application will include a Sustainable Construction and Energy Statement. This will adopt best practice as it exists at that time. It is anticipated the report will include an energy hierarchy so that the correct approach to design is taken to promote an energy efficient low carbon solution. Building fabrics will be reviewed to ensure exceedance on regulatory minimums. Low and zero carbon technologies will be considered including decentralised heating, air to water heat pumps. Electric car charge points will be provided. Sustainable drainage systems will be integrated in the scheme, and a net biodiversity positive will be demonstrated. Extensive landscaping will be provided in public and private spaces.
2.24
Note that although the address has been given as New Road, the location map and attachment clearly show the site being on Addingtons Road, so it is assumed that New Road is a typo. Access will be directly onto Addingtons Road, using the existing access but upgraded and widened. Some moderate traffic in the area which could be worsened by the development and other surrounding proposed sites. There is a bus stop 450m away where the 27 bus provides approx. 4 daily services to Bedford. The main village bus stop is approx 1km away where the 905 bus provides a half hourly service between Bedford and Cambridge. There is a pavement on the opposite side of Addingtons Road, so either a crossing should be provided or a new pavement installed on the same side as the development. No specific cycle connectivity however the road in front of the site is a cycle friendly route and connects to national cycle network nearby providing off-road or quiet-road links to Bedford and St Neots. Either a new pavement will be needed on the side of Addingtons Road that has the site on it, or some kind of pedestrian crossing should be provided so that residents can safely access the existing pavement on the opposite side of Addingtons Road.
no noise concerns
The site has been excluded from further assessment at Stage 1 because its location is not in accordance with the development strategy.