Call for Sites Form
No answer given
Land at Barford Road, Willington, Bedfordshire, MK44 3QP
Semi improved grassland/semi mature woodland.
Residential / Agricultural
Residential
Agricultural
Residential
33
No answer given
16 dph
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
The site is accessible via an existing access from Barford Road as displayed on the submitted location plan. This access is capable of being upgraded to adoptable standards to accommodate vehicular trips. A copy of the transport statement submitted with a previous application has been included with this submission.
33
No answer given
No answer given
No answer given
2024/2025
The site is located within walking distance of services, facilities and sustainable transport modes which will lessen reliance on private vehicle travel and promote modal shift. All units proposed will be built to create high levels of thermal performance to reduce energy need and where possible will be orientated to take advantage of passive solar gains. It is intended to create a good level of air tightness which will prevent the loss of warm air from the new units and greatly improve loss from the existing building, thereby reducing heating needs/demand. The level of insulation affects the ability to maintain a comfortable internal temperature Good levels of insulation will be used to prevent heat loss from inside to outside in the winter, and heat gain from outside to inside in the summer. Low water usage within the dwellings will be achieved through the following: • Efficient washing machines • Dual flush cisterns • Low usage fittings restrictors on taps, showers etc
2.02
The site is located fronting onto the north side of Barford Road in the village of Willington approximately 4.5 miles east of Bedford town centre. Access to the site is feasible one private access point off Barford Road in the middle frontage of site. The proposal will intensify the use of the site and hence intensify Barford Road and there would be impact also on the immediate junction with Bedford Road/Sandy Road, where there is moderate traffic congestion at peak times. The nearest bus stops are located on Bedford Road and Station approximately 380m west of the site. There is a footway of approximate width of 1.2m with varying width of verge behind footway south of the property no. 23 Barford Road up to the junction with Station Road. Barford Road is part of the Thatcher’s Way cycle route. The site fronts onto both Barford Road and the position of the access need to be identified so that the required sight lines on both sides of the access can be achieved together with sufficient spacing between opposite and adjacent junction spacing from existing accesses. There is scope to convert the verges to footway and/or widen the existing footway to a minimum of 2.0m in width subject to land being adopted highway.
no noise concerns
The site has been excluded from further assessment at Stage 1 because its location is not in accordance with the development strategy.