Call for Sites Form

Form ID: 680

Land owner

Please Contact the agent: Director, PPS.

N/A

Land to the East of Hookham’s Lane, Salph End, Renhold.

Map 1233
Show full map

Agriculture & Residential Land. 1.59 ha

Residential

Residential

Residential

Fields

No

Housing

Nothing chosen

20

Family houses

No answer given

20 Dwellings / ha

Market housing - Owner occupied , Affordable Housing - Affordable rent , Affordable Housing - Shared ownership

No answer given

No answer given

Nothing chosen

No answer given

No answer given

No answer given

No answer given

No answer given

No answer given

No answer given

No answer given

No answer given

Suitable access is achievable

A suitable access can be created onto Hookhams Lane via the demolition of an existing property. Details of the access are provided on the Proposed Site Access Arrangement drawing.

Yes

Yes

No

No

20 Dwellings

No answer given

No answer given

No answer given

2024

The proposed scheme will address climate change through appropriate adaptation and mitigation measures in the design. Where possible the dwellings will utilise low carbon building materials. The dwellings will be energy efficient and will be designed for comfort by balancing passive cooling design strategies which maximise comfort and minimise energy use during the warmer summers, with adequate levels of insulation for the warmer winters. The dwellings will be constructed so they are weather tight, robust enough to withstand extreme weather, and with foundations which are appropriate for their lifetime. The design will also include measures for water efficiency and effective drainage.

1.17

Above

Site not in accordance with the emerging development strategy

Exclude from further assessment

Nothing chosen

Nothing chosen

+ The site is within or adjoining the urban area UAB.

++ A site accessibility score of 8 is recorded where 8 is 0 – 10 minutes’ walk.

++ A site accessibility score of 8 is recorded where 8 is 0 – 10 minutes’ walk.

+ The site is within 10 minutes’ walk of a bus stop with a regular bus service (at least hourly) which enables travel 8am-6pm Monday to Friday to a major employer or it is possible to walk to a major employer within 10 minutes.

+ The site is not within or adjoining the air quality management area.

+ The site is not within or adjoining a site of nature conservation importance

? Uncertain or insufficient information.

? Uncertain or insufficient information

+ The site is within or adjoining the green infrastructure opportunity network and able to enhance the network.

+ Opportunity area for 3 or more ecosystem services covers less than 25% of the site.

0 No renewable energy generation scheme included and efficiency standards that meet normal standards.

? The site is within or adjoining a defined settlement policy area or within the built form of a small settlement.

++ A site accessibility score of 8 is recorded where 8 is 0 – 10 minutes’ walk.

++ A site accessibility score of 8 is recorded where 8 is 0 – 10 minutes’ walk.

+ The site is within 10 minutes’ walk of a bus stop with a regular bus service (at least hourly) which enables travel 8am-6pm Monday to Friday to a major employer or it is possible to walk to a major employer within 10 minutes.

0 The proposal appears to have no impact on heritage assets and their significance.

0 Proposal is not employment related.

0 Proposal does not include a main town centre use.

x The proposal does not include and is not within 400m walking distance of a publicly accessible open space.

x The proposal does not include and is not within 800m of a publicly accessible sports facility

? It is uncertain what effect the proposal is likely to have on the landscape / more information is required.

+ The site adjoins a defined settlement policy area or the built form of a small settlement.

x The site is not previously developed land as defined in the NPPF.

? The classification of the site is not known or it is not clear whether is classified as grade 3a or 3b.

+ The site is not located in a source protection zone.

+ The site is within flood zone 1 (areas that have been shown to be at less than 0.1% chance of flooding in any year).

+ The site is likely to provide a mix of housing and include affordable housing.

+ The development will meet identified housing needs eg elderly, care, travellers.

+ The site is within 800m of a facility where cultural or social activities can be accessed.

0 Neutral.

+ The development is likely to increase public surveillance or increase activity.

? The site is within or adjoining a defined settlement policy area or within the built form of a small settlement.

++ A site accessibility score of 8 is recorded where 8 is 0 – 10 minutes’ walk.

++ A site accessibility score of 8 is recorded where 8 is 0 – 10 minutes’ walk

+ The site is within 10 minutes’ walk of a bus stop with a regular bus service (at least hourly) which enables travel 8am-6pm Monday to Friday to a major employer or it is possible to walk to a major employer within 10 minutes.

? Potential access requiring mitigation

? Potential capacity problem requiring mitigation

Access is dependent on a live application (19/02194/MAO) requiring demolition of an existing residential property. A search of the Bedford planning portal indicates that this was refused in Oct 2020, however appeal could occur and access was not one of the reasons for refusal at the time. There is moderate congestion in the area during peak times, which this development would contribute to. The closest bus stop is 450m North on Hookhams Lane, with bus line 27, which offers service of 1 bus per hour. A shared cycle route is just 160m south of the site entrance. Footway would require widening and improving to meet required standards. Connection should be provided to shared cycle path to the south of the site.

Nothing chosen

access road noise consideration would need to be made

Site does not fall within the boundary of a MSA.

The site has been excluded from further assessment at Stage 1 because its location is not in accordance with the development strategy.